Summary
B0400496
Building Permit - Commercial
Final Completion
DOUGLAS STATION SHOPPING CENTER LLC
ALTERATION COMMERCIAL
WHITE BOX FINISH
03/31/2004
04/09/2004
10/06/2004
06/07/2004
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES, LLC, Address:839 NE WOODS CHAPEL RD  
DAVIDSON DESIGN GROUP, Address:11301STRANG LINE ROAD  
DOUGLAS STATION SHOPPING CENTER LLC, Address:1725 NE RICE RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 09/27/2004 10/29/2010
Correction

Fire Department - Comment - Alarm notification devices are all that is required for this project. Alarm devices shall be connected to the existing alarm system. Duct detectors shall be supervisory alarms only and monitored with remorte indicators and the building alarm system.
Correction

CA - A separate permit will be required on the tenant finish.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - 2000 IBC 1109.1 - Required accessible elements shall be identified by the International Symbol of Accessiblity at the locations listed in Section 1109.1. 1. Not applicable as the zoning ordinance is more restrictive. 2. Accessible passenger loading zones. 3. Accessible areas of refuge required by Section 1103.2.13.5. 4. Accessible rooms where multi single-user toilet or bathing rooms are clustered at a single location. 5. Accessible entrances where not all entrances are accessible. 6. Accessible check-out aisles where not all aisles are accessible. The sign, where provided, shall be above the check-out aisle in the same location as the check-out aisle number or type of check-out identification. 7. Unisex toilet and bathing rooms. 8. Accessible dressing, fitting, and locker rooms where not all such rooms are accessible.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - 2000 IPC 308.5 - Pipe shall be supported in accordance with Table 308.5.
Correction

CA - 2000 IPC 312.1 - Required tests. The permit holder shall make the applicable test prescribed in Sections 312.2 through 312.9 to determine compliance with the provisions of this code. The permit holder shall give reasonable advance notice to the code official when the plumbing work is ready for tests. The equipment, material, power and labor necessary for the inspection and test shall be furnished by the permit holder and the permit holder shall be responsible for determining that the work will withstand the test pressure prescribed in the following tests. All plumbing system piping shall be tested with either water or air. After the plumbing fixtures have been set and their traps filled with water, the entire drainage system shall be submitted to final tests. The code official shall require the removal of any cleanouts if necessary to ascertain if the pressure has reached all parts of the system. Note: Testing of the plumbing system is not required to be witnessed by the Codes Administration Staff with the exception of gas piping.
Correction

CA - 2000 IPC 403.1 - Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. Types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - 1999 NEC 250-104(a) - Metal water piping. The interior metal water piping system shall be bonded as required in (1), (2), (3), or (4) of this section. The bonding jumper shall be installed in accordance with Section 250-64(a), (b), and (e). The points of attachment of the bonding jumper(s) shall be accessible.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $62.00 $62.00 Paid 04/09/2004
24 BLDG Plan Check Fees $7.00 $7.00 Paid 04/09/2004
25 Electrical Permit Fee $42.18 $42.18 Paid 04/09/2004
25 Mechanical Permit Fees $19.50 $19.50 Paid 04/09/2004
25 Plumbing Permit Fees $15.00 $15.00 Paid 04/09/2004
89 Sewer Tap Fees $60.00 $60.00 Paid 04/09/2004
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Plumbing Inspection - Commercial Passed 04/16/2004
Correction
Resolved
04/16/2004
UNDER-SLAB DWV PIPING PRESSURE TEST STEADY @ 5 PSI. VISUAL PER PERMIT DRWGS. OK TO COVER WHEN READY EXCAVATED; LAID; JOINED SLOPED TO DRAIN
Underground Plumbing Inspection - Commercial Request Complete 4/15/2004 4/16/2004 04/16/2004
All Rough Inspection - Commercial Not Ready 04/21/2004
Correction
Corrective Action Required
04/21/2004
IN-WALL SYSTEMS ROUGH CALL FOR INSPECTION AFTER PREPARATION IS COMPLETE NOT COMPLETED NOT READY FOR INSPECTION
All Rough Inspection - Commercial Failed 04/23/2004
Correction
Resolved
04/23/2004
IN-WALL SYSTEMS ROUGH NOW COMPLETED READY FOR INSPECTION
Correction
Corrective Action Required
04/23/2004
INSTALLATION OF MC ELECTRICAL CABLE NEC 300-11 & 334-10: N WALL OF RESTROOM NOT SECURELY FASTENED WITHIN 12" OF BOX
Correction
Corrective Action Required
04/23/2004
PROTECTION OF PVC PIPING IPC 305.8: INSTALL SHIELD PLATES < 1-1/2" FROM FACE OF BOTTOM TRACK @ N RR WALL
Correction
Corrective Action Required
04/23/2004
GROMMET PROTECTION OF WATER PIPING @ STUD PENETRATIONS INADEQUATELY SECURED TO STUDS N WALL OF RESTROOM GROMMETS NOT ACCEPTABLE
All Rough Inspection - Commercial Passed 04/27/2004
Correction
Resolved
04/27/2004
INSTALLATION OF MC ELECTRICAL CABLE
Correction
Resolved
04/27/2004
PROTECTION OF PVC PIPING
Correction
Resolved
04/27/2004
GROMMET PROTECTION OF WATER PIPING @ STUD PENETRATIONS
Above Ceiling Inspection Passed 05/13/2004
Correction
Resolved
05/13/2004
ABOVE-CEILING SYSTEMS ROUGH OK TO COVER WHEN READY
Occupancy Inspection - Codes Commercial Passed 06/04/2004
Final Inspection - Commercial Passed 06/04/2004
Correction
Resolved
06/04/2004
Receive Water Utilities Approval PER J WALTERS 6/4/04
Correction
Resolved
06/04/2004
Receive Fire Department approval & ADDRESS. LSFD MAY BE IN CONTACT LSFD NOT PRESENT CA CHECKED DEVICES
Correction
Resolved
06/04/2004
CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home