Permit Application Status

B0400072


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0400072
Building Permit - Commercial
Certificate of Occupancy
CABRA PROPERTIES LLC
NEW COMMERCIAL
OFFICE FOR DOUGLAS STATION MINI STORAGE
01/13/2004
03/17/2004
09/13/2004
05/05/2005
Locations
Contacts
DAVIDSON DESIGN GROUP, Address:11301STRANG LINE ROAD  
TOUCHMARK CONSTRUCTION, Address:PO BOX 528  
CABRA PROPERTIES LLC, Address:13613 S US 71 HWY  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/11/2004 10/29/2010
Correction

CA - Provide the construction cost of this building.
Correction

CA - I am considering this building as part of building A so that the walls between the two building are not required to be rated. This needs to be taken into consideration when solving the allowable area problem of building A.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - 2000 IBC 1209.2 - Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.
Correction

CA - 2000 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as devined in Section 2406.2 shall pass the test requirements of CPSC 16 CFR 1201, listed in Chapter 35. Glazing shall comply with the CSPC 16 CFR, Part 1201 criteria for Category I or Category II as indicated in Table 2406.1.
Correction

Fire Department; Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; An approved lock shall be installed on gates or similar barriers when required by the code official.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - 2000 IPC 403.6 - Customers, patrons and visitors shall be provided with public toilet facilities in structures and tenant spaces intended for public utilization. Public toilet facilities shall be located not more than one story above or below the space required to be provided with public toilet facilites and the path of travel to such facilities shall not exceed a distance of 500 feet.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO Chapter 7, Section 7-803 - Non-residential occupancies. The minimum required R-value for each element of the building thermal envelope shall be in accordance with the following; Exception: The Building Official may approve a decreased R-value for building exterior walls provided the space is not occupied by employees and is associated with storage/warehouse or manufactoring. a) Wall assemblies forming portions of a building envelope shall meet or exceed an R factor rating of 11. This requirement does not apply to doors, windows or openings or approved penetrations nor does it apply to unfinished basement concrete walls. b) Floor assemblies forming portions of a building envelope shall meet or exceed a R factor rating of 19. Exception: Concrete floor in contact with the earth need not be insulated. c) Roof assemblies forming portions of a building envelope shall meet or exceed an R factor of 19.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

A note should be provided indicating a Reduce Pressure Zone (RPZ) principal backflow prevention device will be placed inside the building on the domestic water service line prior to any point of use.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

CA - ANSI A117.1-1998 406.4 - Sides of Curb Ramps. Where pedestrians must walk across a curb ramp, the ramp shall have flared sides. Slope of flares shall not be steeper than 1:10. Where the width of the walking surface at the top of the ramp and parrellel to the run of the ramp is less than 48 inches (1220 mm) wide, the flared sides shall have a slope not steeper than 1:12. Curb ramps and returned curbs shall be permitted where pedestrians would not normally walk across the ramp.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

Codes Administration - Copies of the engineered truss package were not provided at the time of permit application.
Correction

CA - 2000 IPC 410.1 - Drinking fountains shall conform to ASME A112.19.1, ASME A 112.19.2 or ASME A 112.19.9, and water coolers shall conform to ARI 1010. Where water is served in restaurants or where bottled water coolers or disposable cups next to a sink are provided in other occupancies, drinking fountains shall not be required. (As ammended in the LSCO Section 7-407.)
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $152.00 $152.00 Paid 03/17/2004
24 BLDG Plan Check Fees $14.50 $14.50 Paid 03/17/2004
25 Electrical Permit Fee $60.00 $60.00 Paid 03/17/2004
25 Mechanical Permit Fees $35.00 $35.00 Paid 03/17/2004
25 Plumbing Permit Fees $19.00 $19.00 Paid 03/17/2004
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 01/15/2004
Underslab Electrical Inspection - Commercial Passed 01/15/2004
All Rough Inspection - Commercial Not Ready 04/08/2004
Correction
Corrective Action Required
04/08/2004
STRUCTURAL DESIGN DRAWINGS NOT FOUND IN PERMIT SET NOT READY FOR INSPECTION
Electrical Service Inspection Not Ready 04/08/2004
Correction
Corrective Action Required
04/08/2004
MAIN SERVICE PANEL CLARIFY. IF REVISED, RE-SUBMIT TO LS PLAN REVIEW IS 600 AMP PERMIT DRAWINGS SHOW 400A
All Rough Inspection - Commercial Not Ready 04/29/2004
Correction
Corrective Action Required
04/29/2004
READINESS FOR INSPECTION IBC 109.1: NOT READY PROPERTY LOCKED INTERIOR NOT ACCESSIBLE
All Rough Inspection - Commercial Failed 04/30/2004
Correction
Resolved
04/30/2004
STRUCTURAL DESIGN DRAWINGS
Correction
Corrective Action Required
04/30/2004
Stud Drilling and Notching (IRC) EXTERIOR WALL STUDS BORED > 25%
Correction
Corrective Action Required
04/30/2004
PROTECTION OF COPPER & PVC PIPING IPC 305.8; IRC P2603: INSTALL SHIELD PLATES AT STUDS & PLATES. < 1-1/2" FROM FACE OF STUD / PLATE
Correction
Corrective Action Required
04/30/2004
ANCHORAGE OF EXTERIOR WALL SILL PLATE NOT PROVIDED PER DRAWINGS
Correction
Resolved
04/30/2004
READINESS FOR INSPECTION
Electrical Service Inspection Passed 04/30/2004
Correction
Resolved
04/30/2004
MAIN SERVICE PANEL PLACE PANEL FRONT BEFORE REQUESTING SERVICE
Correction
Resolved
04/30/2004
ELECTRICAL SERVICE INSTALLATION 600 AMP RELEASE SERVICE
All Rough Inspection - Commercial Passed 05/04/2004
Correction
Resolved
05/04/2004
Stud Drilling and Notching (IRC)
Correction
Resolved
05/04/2004
PROTECTION OF COPPER & PVC PIPING
Correction
Resolved
05/04/2004
ANCHORAGE OF EXTERIOR WALL SILL PLATE
Underground Electrical Inspection - Commercial Passed 08/19/2004
Correction
Resolved
08/19/2004
LIGHT POLE BASE @ ENTRANCE NOT DETAILED ON DRAWINGS MATERIAL & WORKMANSHIP OK
Occupancy Inspection - Codes Commercial Failed 09/23/2004
Correction
Corrective Action Required
09/23/2004
CODES LABEL BUILDING PANELS TO MAIN LEGEND PROVIDE ADA RESTROOM SIGNAGE PIPE WATER HEATER TPR TO FLOOR/RECEP CLEAR CONSTRUCTION DEBRIS FROM SITE
Correction
Corrective Action Required
09/23/2004
Receive Public Works Approval SEPERATE COVER
Correction
Corrective Action Required
09/23/2004
Receive Fire Department approval SEPERATE COVER
Correction
Corrective Action Required
09/23/2004
Receive Water Utilities Approval SUBMIT ALL BACKFLOW REPORTS
Correction
Corrective Action Required
09/23/2004
Receive Planning & Development Approval SEPERATE COVER
Occupancy Inspection - Codes Commercial Failed 02/08/2005
Correction
Resolved
02/08/2005
CODES LABEL BUILDING PANELS TO MAIN LEGEND
Correction
Resolved
02/08/2005
Receive Fire Department approval PER N ULLERY 2/8/05
Occupancy Inspection - Codes Commercial Failed 02/08/2005
Correction
Corrective Action Required
02/08/2005
CODES LABEL BUILDING PANELS TO MAIN LEGEND
Correction
Resolved
02/08/2005
Receive Public Works Approval PER B LYON 2/8/05
Correction
Resolved
02/08/2005
Receive Water Utilities Approval
Occupancy Inspection - Codes Commercial Failed 02/14/2005
Correction
Resolved
02/14/2005
CODES LABEL BUILDING PANELS TO MAIN LEGEND
Correction
Corrective Action Required
02/14/2005
Receive Planning & Development Approval NOT APPROVED AS OF 2/10 PER TOM SCANNEL 969-7796
Correction
Corrective Action Required
02/14/2005
TEMPORARY OCCUPANCY APPROVAL STATUS EXPIRED 10/23/04
Occupancy Inspection - Codes Commercial Failed 02/17/2005
Correction
Corrective Action Required
02/17/2005
Receive Planning & Development Approval PER TOM SCANNEL 969-7796
Correction
Resolved
02/17/2005
TEMPORARY OCCUPANCY APPROVAL STATUS SEE TEMPORARY OCCPANCY LIMITATION INDICATED
Occupancy Inspection - Codes Commercial Passed 05/04/2005
Correction
Resolved
05/04/2005
Receive Planning & Development Approval PER TOM SCANNEL 5/2/05
Correction
Resolved
05/04/2005
CODES
Correction
Resolved
05/04/2005
TEMPORARY OCCUPANCY APPROVAL STATUS
Documents & Images
Date Uploaded File Type Document Name
07/31/2017 Douglas Station Mini Storage
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home