Summary
B0302306
Building Permit - Commercial
Final Completion
CECEMEGMITSCHSQ LLC
NEW SHELL BUILDING
SYDNEY SQUARE OFFICE/RETAIL BUILDING
11/21/2003
02/25/2004
08/23/2004
05/06/2005
Locations
Contacts
HAWK CONSTRUCTION, Address:1250 NE SLOAN SUITE B  
HAWK CONSTRUCTION, Address:1250 NE SLOAN ST SUITE B  
R K MACE ENINEERING, Address:317 SW MARKET STREET  
CECEMEGMITSCHSQ LLC, Address:708 NW COMMERCE DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/19/2004 10/29/2010
Correction

CA - ANSI A117.1-1998 404.2.7 - Door Hardware. Handles, pulls, latches, locks, and other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight grasping, pinching, or twisting of the wrist to operate. Such hardware shall be 34 inches minimum and 48 inches maximum above the floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides.
Correction

Fire Department- Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility or any portion of the exterior wall of the first story of the building as measured by an approved route around the exterior of the building or facility.
Correction

CA - Sheet ME1 shows a 1 1/2 inch meter and Sheet 1 shows a 1 inch meter.
Correction

CA - Sheet ME1 shows a 4 inch building sewer and Sheet 1 shows a 6 inch building sewer.
Correction

CA - The cover sheet indicates an occupant load factor of one person for every 60 square feet. This factor is for retail spaces above the grade floor level. The occupant load factor which should be used is one person for every 30 square feet. The calculated occupant load is 339 people.
Correction

CA - Copies of the pre-engineered building package were not provided at the time of permit application.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - 2000 IBC 1704.1.1 - The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

CA - 2000 IBC 1109.1 - Required accessible elements shall be identified by the International Symbol of Accessiblity at the locations listed in Section 1109.1. 1. Not applicable as the zoning ordinance is more restrictive. 2. Accessible passenger loading zones. 3. Accessible areas of refuge required by Section 1103.2.13.5. 4. Accessible rooms where multi single-user toilet or bathing rooms are clustered at a single location. 5. Accessible entrances where not all entrances are accessible. 6. Accessible check-out aisles where not all aisles are accessible. The sign, where provided, shall be above the check-out aisle in the same location as the check-out aisle number or type of check-out identification. 7. Unisex toilet and bathing rooms. 8. Accessible dressing, fitting, and locker rooms where not all such rooms are accessible.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

CA - 2000 IMC 602.2.1 - Except as required by Section 602.2.1.1 through 602.2.1.4, materials exposed within plenumbs shall be noncombustible or shall have a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E 84.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - 1999 NEC 250-104(a) - Metal water piping. The interior metal water piping system shall be bonded as required in (1), (2), (3), or (4) of this section. The bonding jumper shall be installed in accordance with Section 250-64(a), (b), and (e). The points of attachment of the bonding jumper(s) shall be accessible.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

A double check detector check valve assembly is required on the fire service line.
Correction

CA - ANSI A117.1-1998 406.4 - Sides of Curb Ramps. Where pedestrians must walk across a curb ramp, the ramp shall have flared sides. Slope of flares shall not be steeper than 1:10. Where the width of the walking surface at the top of the ramp and parrellel to the run of the ramp is less than 48 inches (1220 mm) wide, the flared sides shall have a slope not steeper than 1:12. Curb ramps and returned curbs shall be permitted where pedestrians would not normally walk across the ramp.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - 2000 IBC 1003.3.1.4 - Floor Elevation. There shall be a floor or landing on each side of a door. Such floor or landing shall be at the same elevation on each side of the door. Landings shall be level except for exterior landings, which are permitted to have a slope not to exceed 0.25 unit vertical in 12 units horizontal.
Correction

CA - 2000 IBC 1003.3.1.6 - Thresholds. Thresholds at doorways shall not exceed 0.75 inch in height for sliding doors serving dwelling units or 0.5 inch for other doors. Raised thresholds and floor level changes greater then 0.25 inch at doorways shall be beveled with a slope not greater than one unit vertical in two units horizontal (50-percent slope).
Correction

CA - 2000 IBC 1104.1 - Site arrival points. Accessible routes within the site shall be provided from public transportation stops, accessible parking and accessible passenger loading zones, and public streets or sidewalks to the accessible building entrance served.
Correction

CA - 2000 IMC 304.8 - Clearances from grade. Equipment and appliances installed at grade level shall be supported on a level concrete slab or other approved material extending above adjoining grade or shall be suspended a minimum of 6 inches (152 mm) aboave adjoining grade.
Correction

CA - 2000 IPC 403.2 - Where plumbing fixtures are required, separate facilities shall be provided for each sex.
Correction

CA - 2000 IPC 504.3 - A means of disconnecting an electric hot water supply system from its energy supply shall be provided in accordance with the 1999 National Electric Code. A seperate valve shall be provided to shut off the energy fuel supply to all other types of hot water supply systems.
Correction

CA - 2000 IPC 308.5 - Pipe shall be supported in accordance with Table 308.5.
Correction

CA - 2000 IPC 312.1 - Required tests. The permit holder shall make the applicable test prescribed in Sections 312.2 through 312.9 to determine compliance with the provisions of this code. The permit holder shall give reasonable advance notice to the code official when the plumbing work is ready for tests. The equipment, material, power and labor necessary for the inspection and test shall be furnished by the permit holder and the permit holder shall be responsible for determining that the work will withstand the test pressure prescribed in the following tests. All plumbing system piping shall be tested with either water or air. After the plumbing fixtures have been set and their traps filled with water, the entire drainage system shall be submitted to final tests. The code official shall require the removal of any cleanouts if necessary to ascertain if the pressure has reached all parts of the system. Note: Testing of the plumbing system is not required to be witnessed by the Codes Administration Staff with the exception of gas piping.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - 1999 NEC 250-104(b) - Metal gas piping. Each aboveground portion of a gas piping system upstream from the equipment shutoff valve shall be electrically continuous and bonded to the grounding electrode system.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

CA - 2000 IBC 1704.1.2 - Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and the registered design professional in responsible charge prior to the completion of that phase of the work. A final report of inspections documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted periodically at a frequency agreed upon by the permit applicant and the building official prior to the start of work.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $1,352.00 $1,352.00 Paid 02/25/2004
24 BLDG Plan Check Fees $42.50 $42.50 Paid 02/25/2004
25 Electrical Permit Fee $594.43 $594.43 Paid 02/25/2004
25 Mechanical Permit Fees $208.50 $208.50 Paid 02/25/2004
25 Plumbing Permit Fees $124.50 $124.50 Paid 02/25/2004
89 Sewer Tap Fees $540.00 $540.00 Paid 02/25/2004
Right of Way Permit $35.00 $35.00 Paid 02/25/2004
84 Water Meters $600.00 $600.00 Paid 08/17/2004
85 Water Taps $6,835.00 $6,835.00 Paid 08/17/2004
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 03/22/2004
Correction
Partial Correction
03/22/2004
EXTERIOR WALL GRADE BEAM N WALL EXCEPT W 9'; E WALL; E 36' OF S WALL; 3" COVERAGE CLEARANCE DONE DURING INSPECTION
Electrical Service Inspection Failed 04/05/2004
Correction
Corrective Action Required
04/05/2004
SERVICE PANEL TIGHT TO BREAKERS KNOCKOUTS NOT PLUGGED + DEADFRONT NOT INSTALLED
Footing Inspection - Commercial Not Ready 04/08/2004
Correction
Corrective Action Required
04/08/2004
EXTERIOR WALL GRADE BEAM - BALANCE OF PERIMETER JOINT LAPS < 40 DIAMETERS + TIES MISSING + Z BARS & CORNER BARS MISSING RE-BAR INCOMPLETE + CLEARANCE < 3" +
Correction
Resolved
04/08/2004
EXTERIOR WALL GRADE BEAM N WALL EXCEPT W 9'; E WALL; E 36' OF S WALL; 3" COVERAGE CLEARANCE DONE DURING INSPECTION
Footing Inspection - Commercial Passed 04/09/2004
Correction
Resolved
04/09/2004
EXTERIOR WALL GRADE BEAM - BALANCE OF PERIMETER
Underslab Plumbing Inspection - Commercial Passed 04/14/2004
Correction
Resolved
04/14/2004
UNDER-SLAB DWV PIPING OK TO COVER WHEN READY EXCAVATED; LAID; JOINED PER DRWG P1
Electrical Service Inspection Partial 04/15/2004
Correction
Resolved
04/15/2004
SERVICE PANEL
Correction
Partial Correction
04/15/2004
TEMPORARY SERVICE ONLY 100 AMP RELEASE SERVICE
Underslab Electrical Inspection - Commercial Passed 04/15/2004
Correction
Resolved
04/15/2004
PVC CONDUIT AT SLAB SEGMENTS CENTER SLAB AREA ALL OK TO COVER WHEN READY EAST UPPER SLAB AREA + WEST LOWER SLAB AREA +
Sewer Service Inspection Passed 07/13/2004
Correction
Resolved
07/13/2004
SEWER SERVICE INSTALLATION APPROVED BY LSPW 7/13/04 FROM BUILDING ENTRY TO INSERT-A-TEE CONNNECTION
Sewer Service Inspection - Commercial Request Complete 7/13/2004 7/13/2004 07/13/2004
All Rough Inspection - Commercial Failed 07/23/2004
Correction
Corrective Action Required
07/23/2004
INSTALLATION OF MC ELECTRICAL CABLE NEC 300-11 & 334-10 NOT SECURELY FASTENED WITHIN 12" OF BOXES
Correction
Corrective Action Required
07/23/2004
PROTECTION OF PVC PIPING IPC 305.8: INSTALL SHIELD PLATES < 1-1/2" FROM FACE OF STUDS & TRACKS
All Rough Inspection - Commercial Passed 07/27/2004
Correction
Resolved
07/27/2004
INSTALLATION OF MC ELECTRICAL CABLE
Correction
Resolved
07/27/2004
PROTECTION OF PVC PIPING ARE PROTECTED WITH SHIELD PLATES OK AFTER 2 PVC STACKS IN WALL @ W END
Water Service Inspection Not Ready 08/18/2004
Correction
Corrective Action Required
08/18/2004
READINESS FOR INSPECTION WORK REQUESTED FOR INSP NOT COMPLETED
Water Service Inspection - Commercial Request Complete 8/17/2004 8/18/2004 08/18/2004
Water Service Inspection Passed 08/19/2004
Correction
Resolved
08/19/2004
DOMESTIC SERVICE LINE OK TO COVER WHEN READY TAP; METER/WELL COMPLETE SVC LINE TO BLDG ENTRY
Correction
Resolved
08/19/2004
READINESS FOR INSPECTION
Water Service Inspection - Commercial Request Complete 8/19/2004 8/19/2004 08/19/2004
Electrical Service Inspection Passed 10/08/2004
Correction
Resolved
10/08/2004
SERVICE PANEL SERVICE SWITCHGEAR APPROVED SERVICE PANELS FOR ALL SPACES APPROVED
Correction
Resolved
10/08/2004
TEMPORARY SERVICE ONLY RELEASE HOUSE PANEL 200a
Gas Service Inspection - Commercial Passed 10/26/2004
Correction
Resolved
10/26/2004
TEST PRESSURE LEVEL RELEASE GAS SERVICE HELD STEADY AT >= 10 PSI FOR 20 MIN
Occupancy Inspection - Codes Commercial Failed 11/22/2004
Correction
Corrective Action Required
11/22/2004
CIRCUITS NOT HOT FOR TESTING RESTROOM GFCI'S HAVE ALL HOT FOR FINALS
Correction
Corrective Action Required
11/22/2004
MOLD FORMATION ON GYPSUM WALLBOARD
Correction
Corrective Action Required
11/22/2004
PROTECTION OF AC CONDENSERS SITTING IN WATER
Correction
Corrective Action Required
11/22/2004
LABELING OF ELECTRICAL CIRCUIT BREAKERS EACH BREAKER MUST BE LABELED. MUST BE LEGIBLE; SPECIFIC. NO DITTO MARKS OR CONTINUATION SYMBOLS EXCEPT @ MULTIPLE POLE BREAKERS. INCOMPLETE SERVICE PANEL DIRECTORIES
Correction
Corrective Action Required
11/22/2004
SECURING/SUPPORT OF MC ELECTRICAL CABLE 4.5' MAX INTERVALS AND WITHIN 12" OF BOXES INCOMPLETE NEC 334-10
Correction
Corrective Action Required
11/22/2004
DISCONNECT BOXES ABOVE RESTROOMS NOT PROPERLY MOUNTED
Correction
Corrective Action Required
11/22/2004
PERMANENT LABELING OF ELECTRICAL SERVICE METERS NOT COMPLETED
Correction
Corrective Action Required
11/22/2004
GIRT BRACES @ EXTERIOR WALLS BOTTOMS NOT FASTENED
Correction
Corrective Action Required
11/22/2004
WATER PIPING TO HOSE BIBS + HOSE BIBS NOT GROUTED @ EXTERIOR WALL NOT SECURED TO STRUCTURE INTERIOR WALLS
Correction
Corrective Action Required
11/22/2004
PENETRATIONS/HOLES IN EXTERIOR WALL SEAL ANNULAR SPACE NOT SEALED PIPE, CONDUIT, CABLES#
Correction
Corrective Action Required
11/22/2004
JOINTS IN EXTERIOR MASONRY WALLS NOT CAULKED/GROUTED
Correction
Corrective Action Required
11/22/2004
Receive Fire Department approval
Correction
Corrective Action Required
11/22/2004
Receive Water Utilities Approval
Correction
Corrective Action Required
11/22/2004
Receive Public Works Approval
Correction
Corrective Action Required
11/22/2004
Receive Planning & Development Approval
Occupancy Inspection - Codes Commercial Partial 11/24/2004
Correction
Resolved
11/24/2004
Receive Fire Department approval PER N ULLERY
Correction
Resolved
11/24/2004
WATER PIPING TO HOSE BIBS
Correction
Resolved
11/24/2004
DISCONNECT BOXES ABOVE RESTROOMS
Correction
Resolved
11/24/2004
SECURING/SUPPORT OF MC ELECTRICAL CABLE
Correction
Partial Correction
11/24/2004
LABELING OF ELECTRICAL CIRCUIT BREAKERS LABEL ALL POSITIONS
Correction
Resolved
11/24/2004
CIRCUITS NOT HOT FOR TESTING
Correction
Partial Correction
11/24/2004
PROTECTION OF AC CONDENSERS BLOCKING IN PROGRESS
Correction
Partial Correction
11/24/2004
USE&OCCUPANCY STATUS COMPLETE & RECEIVE APPROVAL ON ALL REMAINING ISSUES NO LATER THAN 12/30/04 OK FOR TENANT FINISH OCCUPANCY INSPECTIONS
Occupancy Inspection - Codes Commercial Failed 02/04/2005
Correction
Corrective Action Required
02/04/2005
Receive Planning & Development Approval COOORDINATE W/ P&D HECTOR SOTO @ 969-7314
Correction
Corrective Action Required
02/04/2005
Receive Public Works Approval COORDINAT W/ PW SHAWN GRAFF @ 969-7428
Correction
Corrective Action Required
02/04/2005
Receive Water Utilities Approval BRENT BOICE 969-7611 BACKFLOW PREVENTION TEST REPORT NOT ON RECORD
Correction
Corrective Action Required
02/04/2005
GIRT BRACES @ EXTERIOR WALLS STATEMENT FROM BUILDING MANUFACTURER STATING THEY MAY BE OMITTED. BOTTOMS NOT FASTENED IF NOT REQUIRED PROVIDE
Correction
Corrective Action Required
02/04/2005
MOLD FORMATION ON GYPSUM WALLBOARD OR OTHERWISE CORRECTED PROVIDE EVIDENCE ALL HAS BEEN REMOVED
Correction
Resolved
02/04/2005
PROTECTION OF AC CONDENSERS
Correction
Corrective Action Required
02/04/2005
USE&OCCUPANCY STATUS PER 11/24/04 TEMPORARY USE AUTHORIZATION REMAINING ISSUES NOT RESOLVED BY 12/30/04
Correction
Corrective Action Required
02/04/2005
CONSTRUCTION MATERIAL & DEBRIS ON STREET AND AT CURB INLET NOT REMOVED
Occupancy Inspection - Codes Commercial Failed 02/16/2005
Correction
Resolved
02/16/2005
Receive Water Utilities Approval PER BRENT BOICE 2/16/05
Correction
Resolved
02/16/2005
JOINTS IN EXTERIOR MASONRY WALLS
Correction
Resolved
02/16/2005
PENETRATIONS/HOLES IN EXTERIOR WALL
Correction
Corrective Action Required
02/16/2005
PERMANENT LABELING OF ELECTRICAL SERVICE METERS HOUSE METER NOT COMPLETED AFFIX PERMANENT LABEL
Correction
Resolved
02/16/2005
LABELING OF ELECTRICAL CIRCUIT BREAKERS SEE TENANT FINISH PERMITS
Correction
Corrective Action Required
02/16/2005
USE&OCCUPANCY STATUS PER 11/24/04 TEMPORARY USE AUTHORIZATION REMAINING ISSUES NOT RESOLVED BY 2/16/05
Correction
Resolved
02/16/2005
CONSTRUCTION MATERIAL & DEBRIS ON STREET
Correction
Corrective Action Required
02/16/2005
CONDITION OF ELECTRICAL SERVICE EQUIPMENT WIRING TROUGH COVER MODIFIED MAIN SWITCH NOT CLOSED SCREWS MISSING +
Correction
Corrective Action Required
02/16/2005
READINESS FOR INSPECTION IBC 109.1, 109.5: NOT READY PROPERTY LOCKED INTERIOR NOT ACCESSIBLE
Occupancy Inspection - Codes Commercial Failed 04/26/2005
Correction
Resolved
04/26/2005
Receive Planning & Development Approval PER HECTOR SOTO 4/26/05
Correction
Resolved
04/26/2005
Receive Public Works Approval PER SHAWN GRAFF 4/26/05
Correction
Resolved
04/26/2005
Receive Fire Department approval PER N ULLERY 4/26/05
Correction
Resolved
04/26/2005
GIRT BRACES @ EXTERIOR WALLS APPEARS TO COMPLY WITH MFGR FAXMEMO DTD 2/7/05
Correction
Resolved
04/26/2005
PERMANENT LABELING OF ELECTRICAL SERVICE METERS
Correction
Resolved
04/26/2005
MOLD FORMATION ON GYPSUM WALLBOARD GC STIPULATES ALL AREAS TREATED W/ BLEACH/KILZ
Correction
Corrective Action Required
04/26/2005
USE&OCCUPANCY STATUS 11/24/04 TEMPORARY USE AUTHORIZATION EXPIRED
Correction
Corrective Action Required
04/26/2005
CONDITION OF ELECTRICAL SERVICE EQUIPMENT SCREWS MISSING/LOOSE; WIRING TROUGH COVER MODIFIED -- NO LONGER LISTED ASSEMBLY REINPECTED W/ PERMIT HOLDER 4/26/05 MAIN SWITCH NOT CLOSED + NOT LABELED "MAIN SWITCH"
Correction
Resolved
04/26/2005
READINESS FOR INSPECTION
Occupancy Inspection - Codes Commercial Passed 05/05/2005
Correction
Resolved
05/05/2005
USE&OCCUPANCY STATUS
Correction
Resolved
05/05/2005
CONDITION OF ELECTRICAL SERVICE EQUIPMENT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home