Summary
B0302085
Building Permit - Commercial
Certificate of Occupancy
DOUGLAS STATION SHOPPING CENTER LLC
NEW TENANT FINISH
SLIM N FIT TENANT FINISH
10/21/2003
11/07/2003
05/05/2004
12/23/2003
Locations
Contacts
DAVIDSON DESIGN GROUP, Address:11301STRANG LINE ROAD  
CAPITAL CONSTRUCTION SERVICES, LLC, Address:1725 NE RICE ROAD  
DOUGLAS STATION SHOPPING CENTER LLC, Address:1725 NE RICE RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/18/2004 10/29/2010
Correction

CA - ANSI A117.1 1998 604.3.1 - Size. Clearance around the water closet shall be 60 inches minimum, measured perpendicular from the side wall, and 56 inches minimum, measured perpendicular from the rear wall. No other fixtures or obstructions shall be within the water closet clearance.
Correction

CA - ANSI A117.1-1998 803.3 - Doors. Doors shall not swing into any part of the turning space.
Correction

CA - This space only requires one exit based on occupant load, therefore exit signs are not required.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

Fire Department; Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor cove-ings, nor shall such cords be subject to environmental damage or physical impact.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department: Fire detection, alarm and extinguishing systems shall be maintained in an op-erative condition at all times, and shall be replaced or repaired where defective.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $44.00 $44.00 Paid 11/07/2003
24 BLDG Plan Check Fees $5.50 $5.50 Paid 11/07/2003
25 Electrical Permit Fee $71.66 $71.66 Paid 11/07/2003
25 Mechanical Permit Fees $24.00 $24.00 Paid 11/07/2003
25 Plumbing Permit Fees $23.00 $23.00 Paid 11/07/2003
89 Sewer Tap Fees $120.00 $120.00 Paid 11/07/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Plumbing Inspection - Commercial Not Ready 11/11/2003
Correction
Corrective Action Required
11/11/2003
READINESS FOR INSPECTION CALL FOR INSPECTION AFTER PREPARATION IS COMPLETE WORK REQUESTED FOR INSP NOT COMPLETED
Underground Plumbing Inspection - Commercial Request Complete 11/10/2003 11/11/2003 11/11/2003
Underground Plumbing Inspection - Commercial Not Ready 11/13/2003
Correction
Corrective Action Required
11/13/2003
READINESS FOR INSPECTION
Underslab Plumbing Inspection - Commercial Not Ready 11/13/2003
Correction
Corrective Action Required
11/13/2003
READINESS FOR INSPECTION PERMIT PRINTS NOT FOUND ON SITE
Underslab Plumbing Inspection - Commercial Passed 11/14/2003
Correction
Resolved
11/14/2003
READINESS FOR INSPECTION
Correction
Resolved
11/14/2003
UNDER-SLAB DWV PIPING OK TO COVER WHEN READY EXCAVATED; LAID; JOINED SLOPED TO DRAIN
All Rough Inspection - Commercial Passed 11/20/2003
Correction
Resolved
11/20/2003
IN-WALL SYSTEMS ROUGH OK TO COVER WHEN READY
Electrical Service Inspection Passed 11/20/2003
Correction
Resolved
11/20/2003
ELECTRICAL SERVICE INSTALLATION 200 AMP RELEASE SERVICE
Above Ceiling Inspection Passed 12/01/2003
Correction
Resolved
12/01/2003
SEISMIC TIES AT LAY-IN ELECTRICAL LIGHTING FIXTURES
Occupancy Inspection - Codes Commercial Failed 12/02/2003
Correction
Corrective Action Required
12/02/2003
BUILDING SHELL PERMIT NOT CLOSED
Occupancy Inspection - Codes Commercial Passed 12/22/2003
Correction
Resolved
12/22/2003
BUILDING SHELL PERMIT CLOSED
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home