B0301926


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0301926
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
PARTIAL COMMERCIAL
TUNNEL FOUND & UNDERSLAB
09/24/2003
10/28/2003
04/25/2004
06/11/2004
Locations
Contacts
JE DUNN CONSTRUCTION CO., Address:929 HOLMES  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/22/2004 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

St. Lukes - The City shall not issue any temporary or final Certificate of Occupancy for any structure in the Developerment until a Certificate of Substantial Completion for the Road Improvements has been issued by MoDOT.
Correction

St. Lukes - A Proprtionate Share of the Total Road Contribution shall be made to the City at or before the time a certificate of occupancy is issued by the City for a building constructed by, or by a building contractor on behalf of, the Developer on the Property, excluding the medical office buildings.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $1,529.00 $1,529.00 Paid 10/28/2003
24 BLDG Plan Check Fees $45.45 $45.45 Paid 10/28/2003
25 Plumbing Permit Fees $15.00 $15.00 Paid 10/28/2003
Inspection Overtime $30.00 $30.00 Paid 12/01/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 10/24/2003
Correction
Partial Correction
10/24/2003
UNDERSLAB DWV PIPING @ BUILDING "D" TUNNEL TODAY`S INSPECTION PLUS EARLIER INSPECTIONS RECORDED MANUALLY COMPLETE APPROVAL OF UNDERSLAB DWV PIPING @ BUILDING "D" TUNNEL. OK TO COVER WHEN READY. 4" C.I. DWV PER DRWG ME-1 FD's; CO's; VENTS; SUMPS
Foundation Inspection - Commercial Partial 10/24/2003
Correction
Partial Correction
10/24/2003
TUNNEL SLAB - PARTIAL GRADED, FORMED, REINFORCED PER CONSTRUCTION DRWGS; NO PERMIT PRINTS ON-SITE THUS FAR. OK TO POUR WHEN READY. FROM N END 40' S TO 160' S
Underslab Plumbing Inspection - Commercial Partial 10/30/2003
Correction
Partial Correction
10/30/2003
UNDERSLAB C.I. PIPING B/C BLDG UNDERSLAB PIPING FROM 1.5 THROUGH 3 LINE ME9 UNDESLAB PIPING 20 FEET NORTH OF 1 LINE THROUGH 2.3 ME6 APPROVED ME-9/ME6
Footing Inspection - Commercial Partial 10/31/2003
Correction
Partial Correction
10/31/2003
COLUMN FOOTINGS C/2.2; C/2.8+3.2; C/3.8
Underslab Plumbing Inspection - Commercial Partial 10/31/2003
Correction
Resolved
10/31/2003
UNDERSLAB DWV PIPING @ BUILDING "D" TUNNEL TODAY`S INSPECTION PLUS EARLIER INSPECTIONS RECORDED MANUALLY COMPLETE APPROVAL OF UNDERSLAB DWV PIPING @ BUILDING "D" TUNNEL. 4" C.I. DWV PER DRWG ME-1 FD's; CO's; VENTS; SUMPS
Correction
Resolved
10/31/2003
UNDERSLAB C.I. PIPING B/C BLDG UNDERSLAB PIPING FROM 1.5 THROUGH 3 LINE ME9 UNDERSLAB PIPING 20 FEET NORTH OF 1 LINE THROUGH 2.3 ME6 ME-9/ME6
Correction
Partial Correction
10/31/2003
UNDER-SLAB DWV PIPING @ BLDG "C" FROM TUNNEL APEX W OF (5) ~ 66 LF NW TO (2.75)
Footing Inspection - Commercial Partial 11/03/2003
Correction
Resolved
11/03/2003
COLUMN FOOTINGS C/2.2; C/2.8+3.2; C/3.8
Correction
Partial Correction
11/03/2003
COLUMN FOOTINGS C/4.9; D/2; D/3; D/4; D/5 OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 11/04/2003
Correction
Resolved
11/04/2003
COLUMN FOOTINGS C/4.9; D/2; D/3; D/4; D/5
Correction
Partial Correction
11/04/2003
COLUMN FOOTINGS C/1.1; D1 OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 11/11/2003
Correction
Resolved
11/11/2003
COLUMN FOOTINGS C/1.1; D1
Correction
Partial Correction
11/11/2003
TUNNEL FLOOR SLAB BLDG "B" OK TO POUR WHEN READY STN 0 + 35' TO 0 + 75' STN 1+ 15' TO 1 + 55'
Footing Inspection - Commercial Partial 11/20/2003
Correction
Partial Correction
11/20/2003
TUNNEL FLOOR SLAB BLDG "B" STN 0 + 35' TO 0 + 75'; STN 1+ 15' TO 1 + 55'; FROM 30` S OF (5) TO 70` S; OK TO POUR WHEN READY SEQUENTIAL SECTIONS:
Footing Inspection - Commercial Partial 11/21/2003
Correction
Resolved
11/21/2003
TUNNEL FLOOR SLAB BLDG "B" STN 0 + 35' TO 0 + 75'; STN 1+ 15' TO 1 + 55'; FROM 30` S OF (5) TO 70` S; SEQUENTIAL SECTIONS:
Correction
Partial Correction
11/21/2003
TUNNEL FLOOR SLAB FROM 70' N OF (5) IN "B" 38` S OK TO POUR WHEN READY FROM 10' N OF (5) IN "B" 40 LF SOUTH +
Underslab Plumbing Inspection - Commercial Partial 11/24/2003
Correction
Resolved
11/24/2003
UNDER-SLAB DWV PIPING @ BLDG "C" FROM TUNNEL APEX W OF (5) ~ 66 LF NW TO (2.75)
Correction
Partial Correction
11/24/2003
UNDER-SLAB DWV PIPING OF NE TUNNEL EXTREMITY. CI DWV PIPING RE-INSTALLED AFTER REMOVAL DUE TO SOILS PROBLEM. FRM 200' SW TO 257' SW + FRM 257' SW TO 317' SW
Underground Plumbing Inspection - Commercial Request Complete 11/21/2003 11/24/2003 11/24/2003
Footing Inspection - Commercial Partial 11/26/2003
Correction
Resolved
11/26/2003
TUNNEL FLOOR SLAB FROM 70' N OF (5) IN "B" 38` S FROM 10' N OF (5) IN "B" 40 LF SOUTH +
Correction
Partial Correction
11/26/2003
TUNNEL FLOOR SLAB - FROM NE EXTREMITY 0 + 240' TO 0 + 280' OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 11/28/2003
Correction
Partial Correction
11/28/2003
TUNNEL FLOOR SLAB - FROM NE EXTREMITY 0+200' TO 0+240'; 0+280' TO 0+320'; ENSURE WATER STOP IS PROPERLY POSITIONED & CLEAN PRIOR TO POUR OK TO POUR WHEN READY 0+240' TO 0+280';
Piers/Caissons Inspection - Commercial Partial 12/19/2003
Correction
Partial Correction
12/19/2003
BOTTOM SLAB SUPPORT PIERS #1- #10 OK TO POUR WHEN READY
Piers/Caissons Inspection - Commercial Partial 12/22/2003
Correction
Partial Correction
12/22/2003
BOTTOM SLAB SUPPORT PIERS #1- #16; OK TO POUR WHEN READY
Piers/Caissons Inspection - Commercial Partial 12/29/2003
Correction
Partial Correction
12/29/2003
BOTTOM SLAB SUPPORT PIERS #1- 16; 21; 23 OK TO POUR WHEN READY
Piers/Caissons Inspection - Commercial Partial 12/31/2003
Correction
Partial Correction
12/31/2003
BOTTOM SLAB SUPPORT PIERS 20; 22; 24; 25; 21a; 23a; 26; 29; OK TO POUR WHEN READY #1- 16; 21; 23; 17; 18;
Piers/Caissons Inspection - Commercial Partial 01/09/2004
Correction
Partial Correction
01/09/2004
BOTTOM SLAB SUPPORT PIERS 20; 22; 24; 25; 21a; 23a; 26; 29; 20(RE-CONSTRUCT); OK TO POUR WHEN READY #1- 16; 21; 23; 17; 18;
Underslab Plumbing Inspection - Commercial Partial 01/12/2004
Correction
Partial Correction
01/12/2004
UNDERSLAB DWV PIPING @ BUILDING "D" TUNNEL (8) W TO (4.5); FD's; CO's; VENTS; SUMP OK TO COVER WHEN READY
Correction
Resolved
01/12/2004
UNDERSLAB C.I. PIPING B/C BLDG ME-9/ME6; FROM 1.5 THROUGH 3 LINE ME9; 20 FEET NORTH OF 1 LINE THROUGH 2.3 ME6;
Correction
Partial Correction
01/12/2004
UNDER-SLAB DWV PIPING @ BLDG "C" TUNNEL APEX W OF (5); 66 LF NW TO (2.75); (4.4) TO (6); INCLUDING FD; VENT; FCO
Correction
Resolved
01/12/2004
UNDER-SLAB DWV PIPING OF NE TUNNEL EXTREMITY. CI DWV PIPING RE-INSTALLED AFTER REMOVAL DUE TO SOILS PROBLEM. FRM 200' SW TO 257' SW + FRM 257' SW TO 317' SW
Underslab Plumbing Inspection - Commercial Passed 01/13/2004
Correction
Resolved
01/13/2004
UNDERSLAB DWV PIPING @ BUILDING "D" TUNNEL (8) W TO (4.5); (4.5) W TO (1.4) FD's; CO's; VENTS; SUMP
Correction
Resolved
01/13/2004
UNDER-SLAB DWV PIPING @ BLDG "C" 66 LF NW TO (2.75); (4.4) TO (6) INCLUDING FD; VENT; FCO TUNNEL APEX W OF (5);
Correction
Resolved
01/13/2004
UNDER-SLAB DWV PIPING OF NE TUNNEL EXTREMITY. CI DWV PIPING RE-INSTALLED AFTER REMOVAL DUE TO SOILS PROBLEM; COMPLETION OF PIPING/FLOOR DRAINS/FCO`S/VENT STUBS FROM E-W SEGMENT OF TUNNEL TO NE/SW SEGMENT FRM 200' SW TO 257' SW + FRM 257' SW TO 317' SW
Footing Inspection - Commercial Partial 01/23/2004
Correction
Partial Correction
01/23/2004
TUNNEL FLOOR SLAB - FROM NE EXTREMITY 0+280' TO 0+320'; 0+320' TO 0+360'; 0+240' TO 0+280'; 0+200' TO 0+240';
Correction
Partial Correction
01/23/2004
TUNNEL FLOOR SLAB C/L (6) TO C/L (7.5) ENSURE WATER STOP IS PROPERLY POSITIONED & CLEAN PRIOR TO POUR UNDER BLDG "D" C/L (4) TO C/L (6)
Piers/Caissons Inspection - Commercial Passed 01/23/2004
Correction
Resolved
01/23/2004
BOTTOM SLAB SUPPORT PIERS 20; 22; 24; 25; 21a; 23a; 26; 29; 20(RE-CONSTRUCT); 28 OK TO POUR WHEN READY #1- 16; 21; 23; 17; 18;
Footing Inspection - Commercial Passed 02/27/2004
Correction
Resolved
02/27/2004
TUNNEL FLOOR SLAB - FROM NE EXTREMITY 0+280' TO 0+320'; 0+320' TO 0+360'; 0+240' TO 0+280'; 0+200' TO 0+240';
Correction
Resolved
02/27/2004
TUNNEL FLOOR SLAB C/L (6) TO C/L (7.5); SE CORNER OF TUNNEL -- FINAL POUR UNDER BLDG D TYING INTO EARLIER POURS TO NE ENSURE WATER STOP IS PROPERLY POSITIONED & CLEAN PRIOR TO POUR UNDER BLDG "D" C/L (4) TO C/L (6)
Footing Inspection - Commercial Passed 03/12/2004
Correction
Resolved
03/12/2004
TUNNEL FLOOR SLAB BLDG "B" STN 1+ 15' TO 1 + 55'; FROM 30` S OF (5) TO 70` S; STN 0 @ BLDG "A"S WALL + TO 0 +35' S FINAL TUNNEL BASE SLAB POUR FROM BLDG A THRU B, C, D,..TO NE CORNER SEQUENTIAL SECTIONS: STN 0 + 35' TO 0 + 75';
Correction
Resolved
03/12/2004
TUNNEL FLOOR SLAB FROM 70' N OF (5) IN "B" 38` S FROM 10' N OF (5) IN "B" 40 LF SOUTH +
Correction
Resolved
03/12/2004
TUNNEL FLOOR SLAB - FROM NE EXTREMITY 0+280' TO 0+320'; 0+320' TO 0+360'; 0+240' TO 0+280'; 0+200' TO 0+240';
Correction
Resolved
03/12/2004
TUNNEL FLOOR SLAB C/L (6) TO C/L (7.5); SE CORNER OF TUNNEL -- FINAL POUR UNDER BLDG D TYING INTO EARLIER POURS TO NE UNDER BLDG "D" C/L (4) TO C/L (6)
Underslab Plumbing Inspection - Commercial Passed 05/03/2004
Foundation Inspection - Commercial Passed 06/10/2004
Correction
Resolved
06/10/2004
TUNNEL SLAB - PARTIAL
Final Inspection - Commercial Passed 06/10/2004
Correction
Resolved
06/10/2004
CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home