Summary
B0301807
Building Permit - Commercial
Certificate of Occupancy
CRYSTAL CLEAN CARWASH LLC
NEW COMMERCIAL
OADES BROTHERS CAR WASH
09/09/2003
10/06/2003
04/03/2004
05/28/2004
Locations
Contacts
ADVANCED CONSTRUCTION SERVICES INC, Address:13900 W 108TH ST  
JANTSCH SLAGGIE ARCHITECTS, Address:218 DELAWARE  
CRYSTAL CLEAN CARWASH LLC, Address:1281 N MARTWAY DR STE 109  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/07/2004 10/29/2010
Correction

CA - ANSI A117.1-1998 404.2.7 - Door Hardware. Handles, pulls, latches, locks, and other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight grasping, pinching, or twisting of the wrist to operate. Such hardware shall be 34 inches minimum and 48 inches maximum above the floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides.
Correction

Fire Department- The non-use of hazardous materials will be verified at final inspection.
Correction

CA - Information is not provided on the boiler unit to be installed.
Correction

CA - Information was not provided on the water heater to be installed.
Correction

CA - 2000 IBC 1003.3.3.3 - Stair riser heights shall be 7 inches maximum and 4 inches minimum. Stair tread depths shall be 11 inches minimum. The riser height shall be measured vertically between the leading edges of adjacent treads. The tread depth shall be measured horizontally between the vertical planes of the foremost projection of adjacent treads and at right angle to the tread's leading edge.
Correction

CA - 2000 IBC 1209.2 - Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.
Correction

CA - 2000 IBC 1003.3.3.11 - Handrails. Stairways shall have handrails on each side. Handrails shall be adequate in strength and attachment in accordance with Section 1607.7.
Correction

CA - 2000 IBC 1003.3.3.11.1 - Handrail Height. Handrail height, measured above stair tread nosing, or finish surface of ramp slope, shall be uniform, not less than 34 inches and not more than 38 inches.
Correction

CA - 2000 IBC 1003.3.3.11.5 - Handrail extension. Handrails shall return to a wall, guard or the walking surface or shall be continuous to the handrail of an adjacent stair flight. Where handrails are not continous between flights, the handrails shall extend horizontally at least 12 inches beyond the top riser and continue to slope for the depth of one tread beyond the bottom riser.
Correction

CA - 2000 IBC 1003.3.1.4 - Floor Elevation. There shall be a floor or landing on each side of a door. Such floor or landing shall be at the same elevation on each side of the door. Landings shall be level except for exterior landings, which are permitted to have a slope not to exceed 0.25 unit vertical in 12 units horizontal.
Correction

CA - 2000 IBC 1003.3.1.6 - Thresholds. Thresholds at doorways shall not exceed 0.75 inch in height for sliding doors serving dwelling units or 0.5 inch for other doors. Raised thresholds and floor level changes greater then 0.25 inch at doorways shall be beveled with a slope not greater than one unit vertical in two units horizontal (50-percent slope).
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor cove-ings, nor shall such cords be subject to environmental damage or physical impact.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - 2000 IMC 920.1 - General. Unit heaters shall be installed in accordance with the listing and the manufacturer's installation instructions. Oil-fired unit heaters shall be tested in accordance with UL 731.
Correction

CA - 2000 IBC 920.2 - Support. Suspended-type unit heaters shall be supported by elements that are designed and constructed to accomodate the weight and dynamic loads. Hangers and brackets shall be of noncombustible material. Suspended-type oil-fired unit heaters shall be installed in accordance with NFPA 31.
Correction

CA - 2000 IPC 308.5 - Pipe shall be supported in accordance with Table 308.5.
Correction

CA - 2000 IPC 312.1 - Required tests. The permit holder shall make the applicable test prescribed in Sections 312.2 through 312.9 to determine compliance with the provisions of this code. The permit holder shall give reasonable advance notice to the code official when the plumbing work is ready for tests. The equipment, material, power and labor necessary for the inspection and test shall be furnished by the permit holder and the permit holder shall be responsible for determining that the work will withstand the test pressure prescribed in the following tests. All plumbing system piping shall be tested with either water or air. After the plumbing fixtures have been set and their traps filled with water, the entire drainage system shall be submitted to final tests. The code official shall require the removal of any cleanouts if necessary to ascertain if the pressure has reached all parts of the system. Note: Testing of the plumbing system is not required to be witnessed by the Codes Administration Staff with the exception of gas piping.
Correction

CA - 1999 NEC 250-104(a) - Metal water piping. The interior metal water piping system shall be bonded as required in (1), (2), (3), or (4) of this section. The bonding jumper shall be installed in accordance with Section 250-64(a), (b), and (e). The points of attachment of the bonding jumper(s) shall be accessible.
Correction

CA - 1999 NEC 250-104(b) - Metal gas piping. Each aboveground portion of a gas piping system upstream from the equipment shutoff valve shall be electrically continuous and bonded to the grounding electrode system.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

A note should be provided indicating a Reduce Pressure Zone (RPZ) principal backflow prevention device will be placed inside the building on the domestic water service line prior to any point of use.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $1,352.00 $1,352.00 Paid 10/06/2003
24 BLDG Plan Check Fees $42.50 $42.50 Paid 10/06/2003
25 Electrical Permit Fee $179.00 $179.00 Paid 10/06/2003
25 Mechanical Permit Fees $24.00 $24.00 Paid 10/06/2003
25 Plumbing Permit Fees $70.00 $70.00 Paid 10/06/2003
84 Water Meters $625.00 $625.00 Paid 10/06/2003
85 Water Taps $13,670.00 $13,670.00 Paid 10/06/2003
89 Sewer Tap Fees $360.00 $360.00 Paid 10/06/2003
Right of Way Permit $35.00 $35.00 Paid 10/06/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 10/08/2003
Correction
Partial Correction
10/08/2003
E END UPPER AREA GRADE BEAM OK PER SPECIAL INSPECTOR ENSURE RE-BAR COVERAGE THEN OK TO POUR WHEN
Footing Inspection - Commercial Partial 10/09/2003
Correction
Partial Correction
10/09/2003
REMAINDER OF GRADE BEAMS ENSURE RE-BAR COVERAGE; THEN OK TO POUR WHEN OK PER SPECIAL INSPECTOR PERIMETER & CROSSWALLS W (LOWER SLAB AREA) END
Correction
Resolved
10/09/2003
E END UPPER AREA GRADE BEAM
Underslab Electrical Inspection - Commercial Not Ready 10/14/2003
Correction
Corrective Action Required
10/14/2003
READINESS FOR INSPECTION CALL FOR INSPECTION AFTER PREPARATION IS COMPLETE WORK REQUESTED FOR INSP NOT COMPLETED
Underground Plumbing Inspection - Commercial Partial 10/23/2003
Correction
Partial Correction
10/23/2003
WASH BAY DRAINAGE SYSTEM - PARTIAL + SIX 4" LATERALS INTO WASH BAYS. OK TO COVER WHEN READY FROM O/S NW BLDG CORNER 6" PVC SS LINE TO ~ 90' E
Underground Electrical Inspection - Commercial Passed 10/23/2003
Correction
Resolved
10/23/2003
SERVICE CABLE CONDUITS OK TO COVER WHEN READY TWO 4" PVC FROM XFRMR POLE TO BLDG
Foundation Inspection - Commercial Partial 10/28/2003
Correction
Partial Correction
10/28/2003
TRANSITION WALL SEPARATING LOWER & UPPER AREAS LOWER LIFT OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Passed 10/29/2003
Correction
Resolved
10/29/2003
None OFFICE CORE, RESTROOM PACKG, TRENCH DRAIN. BAY 9 AND 10 SCH 40 DWV APPROVED OFFICE CORE, BAY 9/10
Sewer Service Inspection Passed 10/30/2003
Underground Electrical Inspection - Commercial Passed 10/30/2003
Correction
Resolved
10/30/2003
None MISC U.G.E.C. APPROVED MONUMENT SIGN, LIGHTING, OTHERS
Sewer Service Inspection - Commercial Request Complete 10/30/2003 10/30/2003 10/30/2003
Underground Plumbing Inspection - Commercial Not Ready 11/06/2003
Correction
Resolved
11/06/2003
WASH BAY DRAINAGE SYSTEM - PARTIAL + SIX 4" LATERALS INTO WASH BAYS. FROM O/S NW BLDG CORNER 6" PVC SS LINE TO ~ 90' E
Correction
Corrective Action Required
11/06/2003
ROOF DRAIN PIPING PERMIT PRINTS NOT ACCESSIBLE. NOT READY FOR INSPECTION. INSTALLATION OBSERVED NOT INSPECTED DUE TO
Underground Plumbing Inspection - Commercial Passed 11/07/2003
Correction
Resolved
11/07/2003
ROOF DRAIN PIPING OK TO COVER WHEN READY WORKMANSHIP & MATERIAL OK NO SPEC ON PERMIT DRWGS
Underground Plumbing Inspection - Commercial Request Complete 11/7/2003 11/7/2003 11/07/2003
Water Service Inspection Partial 11/12/2003
Correction
Partial Correction
11/12/2003
None 260' HDPE WATER SERVICE EAST TOWARDS SLOAN APPROVED OK TO COVER
Water Service Inspection - Commercial Request Complete 11/12/2003 11/12/2003 11/12/2003
Water Service Inspection Partial 11/20/2003
Correction
Partial Correction
11/20/2003
WATER SERVICE LINE 2ND PARTIAL 3" PVC EXTENDED WEST TO NEAR METER LOCATION
Water Service Inspection - Commercial Request Complete 11/20/2003 11/20/2003 11/20/2003
Underground Electrical Inspection - Commercial Passed 11/24/2003
Correction
Resolved
11/24/2003
None
Correction
Resolved
11/24/2003
SITE ELECTRICAL U.G. CONDUIT & APPROVED EXCAV/LAID; PHOTOGRAPHED COVERED; VIEWED LATER
Correction
Resolved
11/24/2003
SERVICE CABLE CONDUITS
Underslab Electrical Inspection - Commercial Passed 11/24/2003
Correction
Resolved
11/24/2003
READINESS FOR INSPECTION
Water Service Inspection Failed 12/02/2003
Correction
Resolved
12/02/2003
None
Correction
Corrective Action Required
12/02/2003
PIPING @ W SIDE OF STREET TO TAP REJECTED - PIPE CRIMPED
Correction
Resolved
12/02/2003
WATER SERVICE LINE 2ND PARTIAL 3" PVC EXTENDED WEST TO NEAR METER LOCATION
Water Service Inspection - Commercial Request Complete 12/2/2003 12/2/2003 12/02/2003
Foundation Inspection - Commercial Partial 12/18/2003
Correction
Partial Correction
12/18/2003
TRANSITION WALL SEPARATING LOWER & UPPER AREAS LOWER LIFT OK TO POUR WHEN READY
Correction
Partial Correction
12/18/2003
None BAY 1, 2, 3, 4 POURED WALLS - STEEL APPROVED PER PLANS
Rough Framing Inspection - Commercial Partial 01/09/2004
Correction
Partial Correction
01/09/2004
CIP CONCRETE BAY SEPARATION WALLS W WALL OF BAYS #10; #9; W WALL OF MECHANICAL BAY; RE-BAR; FORMWORK IN PROG OK TO POUR WHEN READY
Footing Inspection - Commercial Passed 01/14/2004
Correction
Resolved
01/14/2004
REMAINDER OF GRADE BEAMS PERIMETER & CROSSWALLS W (LOWER SLAB AREA) END
Piers/Caissons Inspection - Commercial Passed 01/14/2004
Correction
Resolved
01/14/2004
CANOPY FOOTINGS @ 4 VACUUM ISLANDS EAST FOOTINGS AT EACH ISLAND TO INCLUDE GROUNDING FOR LOT LIGHTS TO BE INSTALLED TEMPORARILY; GROUNDING INSTALLATION IN PROGRESS. RE-BAR CAGES REQUIRE 3" CLEARANCE; ANCHOR BOLTS TO BE SET. OK TO POUR WHEN READY. SECTION 13/S2 MODIFIED BY A/E MEMO DTD 11/12/03
Underground Electrical Inspection - Commercial Passed 01/16/2004
Correction
Resolved
01/16/2004
LIGHT POLE BASES GROUND CONDUCTOR CONDUIT IN PLACE. GROUND CONNECTIONS TO BE APPROVED WHEN READY AND BEFORE COVERING. PERIMETER OF PARKING LOT OK TO POUR WHEN READY
Correction
Resolved
01/16/2004
SITE ELECTRICAL U.G. CONDUIT
Electrical Service Inspection Passed 01/16/2004
Correction
Resolved
01/16/2004
OK TO MAIN DISCONNECT RELEASE FOR SCHEDULING OF AQUILA INSTALLATION
Rough Framing Inspection - Commercial Passed 01/20/2004
Correction
Resolved
01/20/2004
CIP CONCRETE BAY SEPARATION WALLS BAY 1, 2, 3, 4 POURED WALLS; W WALL OF BAYS #6; #7; #8; #10; #9; W WALL OF MECHANICAL BAY RE-BAR; FORMWORK IN PROG OK TO POUR WHEN READY
Foundation Inspection - Commercial Passed 01/20/2004
Correction
Resolved
01/20/2004
None BAY 1, 2, 3, 4 POURED WALLS - STEEL APPROVED PER PLANS
Correction
Resolved
01/20/2004
TRANSITION WALL SEPARATING LOWER & UPPER AREAS
Gas Service Inspection - Commercial Not Ready 02/23/2004
Correction
Corrective Action Required
02/23/2004
READINESS FOR INSPECTION IFGC 104, 107; IFGS 406: PLACE GUAGE AND PRESSURIZE PIPING SYSTEM TO HOLD STEADY AT OR ABOVE 1-1/2 x MAX WORKING PRESSURE NO PRESSURE GUAGE ON LINE TO BE TESTED
Underground Electrical Inspection - Commercial Partial 02/27/2004
Correction
Partial Correction
02/27/2004
SITE ELECTRICAL U.G. CONDUIT COVER WHEN READY. CONDUIT TO LIGHT POLES @ N & W PROP LINES YET TO BE APPROVED. OUTSIDE CURB S PROP LINE + E END OF BLDG OK TO
Gas Service Inspection - Commercial Passed 02/27/2004
Correction
Resolved
02/27/2004
READINESS FOR INSPECTION
Correction
Resolved
02/27/2004
TEST PRESSURE LEVEL RELEASE GAS SERVICE HELD STEADY AT 25 PSI FOR > 60 MIN
Underground Electrical Inspection - Commercial Request Complete 2/26/2004 2/27/2004 02/27/2004
Underground Electrical Inspection - Commercial Passed 03/30/2004
Correction
Resolved
03/30/2004
SITE ELECTRICAL U.G. CONDUIT
Correction
Resolved
03/30/2004
LIGHT POLE BASES
Water Service Inspection Passed 03/30/2004
Correction
Resolved
03/30/2004
PIPING @ W SIDE OF STREET TO TAP APPROVED BY LSWU
Occupancy Inspection - Codes Commercial Failed 03/30/2004
Correction
Corrective Action Required
03/30/2004
Receive Planning & Development Approval CALL FOR P&D INSPECTION WHEN READY
Correction
Corrective Action Required
03/30/2004
Receive Public Works Approval ISSUES PER B LYON DISCUSSED ON SITE 3/30/04
Correction
Corrective Action Required
03/30/2004
Receive Water Utilities Approval BACKFLOW TEST RESULTS NOT SUBMITTED
Correction
Resolved
03/30/2004
Receive Fire Department approval PER N ULLERY 3/30/04
Underground Electrical Inspection - Commercial Passed 04/02/2004
Correction
Resolved
04/02/2004
LIGHT POLE BASES REMAINING GROUNDS OK POLES @ N & W PROP LINES
Occupancy Inspection - Codes Commercial Failed 04/02/2004
Correction
Corrective Action Required
04/02/2004
PERMIT FOR LAWN IRRIGATION SYSTEM INSTALLATION IN PROGRESS PERMIT NOT ON SITE
Occupancy Inspection - Codes Commercial Failed 04/05/2004
Correction
Resolved
04/05/2004
Receive Water Utilities Approval PER J WALTERS 4/5/04
Occupancy Inspection - Codes Commercial Failed 04/12/2004
Correction
Resolved
04/12/2004
Receive Public Works Approval PER B LYON 4/12/04
Correction
Corrective Action Required
04/12/2004
Receive Planning & Development Approval RESOLVE PLANTINGS ISSUE WITH TOM SCANNELL @ P&D
Correction
Resolved
04/12/2004
PERMIT FOR LAWN IRRIGATION SYSTEM
Occupancy Inspection - Codes Commercial Passed 05/26/2004
Correction
Resolved
05/26/2004
Receive Planning & Development Approval PER T SCANNELL 5/25/04
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home