Summary
B0301744
Building Permit - Commercial
Final Completion
DACUR INVESTMENT COMPANY INC
ALTERATION COMMERCIAL
FACADE REMODEL
08/29/2003
09/15/2003
03/13/2004
02/03/2004
Locations
Contacts
DAN HENRY CONSTRUCTION, INC., Address:12302 JOHNSON  
DACUR INVESTMENT COMPANY INC, Address:2700 KENDALLWOOD PKWY # 208  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 02/25/2004 10/29/2010
Correction

Fire Department; Egress doors shall be readily openable from the egress side without the use of akey or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Correction

Fire Department- Fire lanes shall be posted per IFC D103.6
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

Fire Department; Combustible waste material creating a fire hazard shall not be allowed to accumulate in buildings or structures or upon premises. Combustible debris, waste materials and trash shall not be burned on site.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $1,520.00 $1,520.00 Paid 09/15/2003
24 BLDG Plan Check Fees $45.30 $45.30 Paid 09/15/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 09/29/2003
Correction
Partial Correction
09/29/2003
EAST ELEVATION CANOPY FOOTINGS 4 FOOTINGS. POUR AT RISK WITH RESPECT TO DEPTH REVISION NOT YET SUBMITTED TO CITY. ALL OTHER OK TO POUR WHEN READY. DRWG S5, EXCEPT 4' DEEP REV TO BE SUBMITTED
All Rough Inspection - Commercial Partial 10/06/2003
Correction
Partial Correction
10/06/2003
WALL/PARAPET FRAMING & IN-WALL @ N END OF STRIP CENTER 1) NM ELECT CABLE & BOXES TO BE REMOVED, TERMINATED OR COVERED 2) 3RD STUD N OF DOOR TO 853 HEAVILY NOTCHED - NOT REINFORCED 3) HIGH ROOF @ W WALL OF CREDIT UNION REQUIRES ANCHORAGE TO EXSTG DECK & A/E APPROVAL OF BOTTOM ANCHORAGE. W 120' OF N ELEVATION OK TO COVER -- ISSUES:
Rough Framing Inspection - Commercial Request Complete 10/3/2003 10/6/2003 10/06/2003
All Rough Inspection - Commercial Partial 10/07/2003
Correction
Partial Correction
10/07/2003
WALL/PARAPET FRAMING & IN-WALL @ N END OF STRIP CENTER TO NEW FACADE FACE & TERMINATED - TWO LOCATIONS. 2) 3RD STUD N OF DOOR TO 853 IS REINFORCED OK TO COVER PROVIDING 1)NM ELECT CABLE EXTENDED
Rough Framing Inspection - Commercial Partial 10/16/2003
Correction
Partial Correction
10/16/2003
FACIA FACADE FRAMING ELEV2A S 3 BAYS; N 3 BAYS DRWG SHT A200
Footing Inspection - Commercial Partial 10/16/2003
Correction
Resolved
10/16/2003
EAST ELEVATION CANOPY FOOTINGS DRWG S5
Correction
Partial Correction
10/16/2003
FOOTINGS @ ARCH STRUCTURE ELEV 2A DRWG SHT S1 ON SHELF ROCK OK TO PIN & POUR IF DIRECTED BY A/E. S ARCH LEG FOOTING BOTTOM @ -5'- 6"
Rough Framing Inspection - Commercial Request Complete 10/15/2003 10/16/2003 10/16/2003
Footing Inspection - Commercial Passed 10/17/2003
Correction
Resolved
10/17/2003
EAST ELEVATION CANOPY FOOTINGS
Correction
Resolved
10/17/2003
FOOTINGS @ ARCH STRUCTURE ELEV 2A DRWG SHT S1
Footing Inspection - Commercial Partial 10/23/2003
Correction
Partial Correction
10/23/2003
FOOTINGS @ CANOPY ARCH STRUCTURE SIDEPOCKETS/ECKERD DRWG SHEET S3 OK TO POUR WHEN READY
Miscellaneous Inspection Partial 10/30/2003
Correction
Partial Correction
10/30/2003
EIFS SUBSTRATE SCREW PATTERN FOR EIFS SUBSTRATE APPROVED FOR 100 (SOUTH) PARTIAL BLDG AND 200 (NORTH ELEVATION)
Miscellaneous Inspection Passed 11/03/2003
Correction
Resolved
11/03/2003
EIFS SUBSTRATE SCREW PATTERN FOR EIFS SUBSTRATE APPROVED FOR 100 (SOUTH) PARTIAL BLDG AND 200 (NORTH ELEVATION)
Rough Framing Inspection - Commercial Partial 11/03/2003
Correction
Partial Correction
11/03/2003
SCREW PATTERN FOR EIFS SUBSTRATE DOLLAR GENERAL - SUMMIT FITNESS OK TO COVER ELEVATION @
Rough Framing Inspection - Commercial Request Complete 10/31/2003 11/3/2003 11/03/2003
All Rough Inspection - Commercial Passed 11/13/2003
Correction
Resolved
11/13/2003
WALL/PARAPET FRAMING & IN-WALL @ N END OF STRIP CENTER
Rough Framing Inspection - Commercial Partial 11/13/2003
Correction
Resolved
11/13/2003
FACIA FACADE FRAMING ELEV2A S 3 BAYS; N 3 BAYS DRWG SHT A200
Correction
Partial Correction
11/13/2003
FACADE FRAMING ELEVATION 1 OK TO COVER WHEN READY DRWG SHEET 100 SUBSTANTIALLY COMPLETED
Final Inspection - Commercial Failed 01/30/2004
Correction
Corrective Action Required
01/30/2004
IDENTIFICATION OF ELECTRICAL METERS METER CABINETS PAINTED-OVER DURING PROJECT PAINTING. WITH SPACES SERVED 5 @ N END OF BUILDING
Rough Framing Inspection - Commercial Passed 01/30/2004
Correction
Resolved
01/30/2004
FACIA FACADE FRAMING
Correction
Resolved
01/30/2004
SCREW PATTERN FOR EIFS SUBSTRATE
Correction
Resolved
01/30/2004
FACADE FRAMING ELEVATION 1
Footing Inspection - Commercial Passed 01/30/2004
Correction
Resolved
01/30/2004
FOOTINGS @ CANOPY ARCH STRUCTURE SIDEPOCKETS/ECKERD
Final Inspection - Commercial Passed 02/02/2004
Correction
Resolved
02/02/2004
IDENTIFICATION OF ELECTRICAL METERS PERMANENT LABELS NOW AFFIXED. WITH SPACES SERVED 5 @ N END OF BUILDING
Correction
Resolved
02/02/2004
CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home