Summary
B0301561
Building Permit - Commercial
Final Completion
SOUTHWESTERN BELL TELEPHONE
ADD/ALTER OTHER
AT&T WIRELESS CO-LOCATE
08/05/2003
09/17/2003
03/15/2004
11/19/2003
Locations
Contacts
SELECTIVE SITE CONSULTANTS, Address:8500 W 110TH ST SUITE 300  
SOUTHWESTERN BELL TELEPHONE, Address:ONE SBC CENTER 36-M-1  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 02/01/2004 10/29/2010
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

Fire Department; An approved lock shall be installed on gates or similar barriers when required by the code official.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $107.00 $107.00 Paid 09/17/2003
24 BLDG Plan Check Fees $10.75 $10.75 Paid 09/17/2003
25 Electrical Permit Fee $35.00 $35.00 Paid 09/17/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Not Ready 09/25/2003
Correction
Corrective Action Required
09/25/2003
READINESS FOR INSPECTION LSCO 7-142: NOT READY FOR INSPECTION PERMIT PRINTS NOT FOUND ON SITE
Underground Electrical Inspection - Commercial Passed 09/29/2003
Correction
Resolved
09/29/2003
NO ISSUES NOTED OK TO COVER WHEN READY. CALL FOR FINAL INSPECTION WHEN READY. PER CONSTRUCTION DRWGS ON SITE
Correction
Resolved
09/29/2003
READINESS FOR INSPECTION
Electrical Service Inspection Passed 09/29/2003
Correction
Resolved
09/29/2003
ELECTRICAL SERVICE INSTALLATION RELEASE SERVICE
Underground Electrical Inspection - Commercial Request Complete 9/26/2003 9/29/2003 09/29/2003
Final Inspection - Commercial Passed 11/18/2003
Correction
Resolved
11/18/2003
CO-LOCATE EQUIPMENT INSTALLATION CLOSE PERMIT COMPLETED APPROVED FOR USE
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home