Summary
B0301190
Building Permit - Commercial
Final Completion
LEES LANDING PROPERTIES LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB
06/24/2003
06/24/2003
12/21/2003
09/09/2003
Locations
Contacts
HIRST & ASSOCIATES, Address:621 NE WOODS CHAPEL RD  
MOEHLE CONSTRUCTION, Address:2270 NW SUMMERFIELD DR  
RK MACE ENGINEERING, INC., Address:1012 NE BRYANT CT.  
LEES LANDING PROPERTIES LLC, Address:2270 NW SUMMERFIELD DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 12/21/2003 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Tenant finish plans shall be submitted to the Codes Administration Department prior to any interior alteration or improvments. Permits shall be obtained prior to any performing any work which requires permits.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $32.00 $32.00 Paid 06/24/2003
24 BLDG Plan Check Fees $4.50 $4.50 Paid 06/24/2003
25 Plumbing Permit Fees $15.00 $15.00 Paid 06/24/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 07/15/2003
Correction
Resolved
07/15/2003
Footing Reinforcement (IRC) ALONG N WALL. THEN OK TO POUR WHEN READY. CONDITIONAL APPROVAL INCREASE COVERAGE TO 3"
Sewer Service Inspection Not Ready 07/25/2003
Correction
Corrective Action Required
07/25/2003
READINESS FOR INSPECTION LSCO 7-142: NOT READY FOR INSPECTION NOTE: FOR APPROVAL, PERMIT PRINTS MUST MATCH WORK PERFORMED. PERMIT PRINTS NOT FOUND ON SITE
Underslab Plumbing Inspection - Commercial Passed 07/30/2003
Correction
Resolved
07/30/2003
UNDER-FLOOR DWV & WATER PIPING OK TO COVER WHEN READY EXCAVATED; LAID; JOINED SLOPED TO DRAIN
Sewer Service Inspection Failed 08/14/2003
Correction
Corrective Action Required
08/14/2003
UNPROTECTED EXCAVATION NO DEFECTIVE WORKMANSHIP NOTED. DESIGN MODIFICATION AND APPROVAL STILL PENDING. PROVIDE SAFETY BARRIER OR BACKFILL AT RISK
Sewer Service Inspection Passed 09/05/2003
Correction
Resolved
09/05/2003
READINESS FOR INSPECTION
Correction
Resolved
09/05/2003
UNPROTECTED EXCAVATION
Correction
Resolved
09/05/2003
SEWER SERVICE INSTALLATION PER REVISED PERMIT DRWGS FROM BUILDING ENTRY TO CONNECTION AT EXSTG
Water Service Inspection Passed 09/08/2003
Final Inspection - Commercial Passed 09/08/2003
Correction
Resolved
09/08/2003
SUBSTRUCTURE & UNDERGROUND SERVICES COMPLETED & APPROVED CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home