Summary
B0301129
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW COMMERCIAL
BLDG B EMERGENCY FACILITY
06/17/2003
11/10/2003
05/08/2004
04/11/2005
Locations
Contacts
ACI BOLAND, Address:11229 NALL SUITE 140  
JE DUNN CONSTRUCTION CO, Address:929 HOLMES RD  
SHAFER, KLINE & WARREN, Address:2940 MAIN ST.  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 12/14/2003 10/29/2010
Correction

St. Lukes - The City shall not issue any temporary or final Certificate of Occupancy for any structure in the Developerment until a Certificate of Substantial Completion for the Road Improvements has been issued by MoDOT.
Correction

St. Lukes - A Proprtionate Share of the Total Road Contribution shall be made to the City at or before the time a certificate of occupancy is issued by the City for a building constructed by, or by a building contractor on behalf of, the Developer on the Property, excluding the medical office buildings.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

All proposed hose bibb connections must have an approved (vacuum breaker) backflow preventer.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $12,407.00 $12,407.00 Paid 11/10/2003
25 Electrical Permit Fee $1,115.78 $1,115.78 Paid 11/10/2003
25 Mechanical Permit Fees $295.00 $295.00 Paid 11/10/2003
25 Plumbing Permit Fees $226.00 $226.00 Paid 11/10/2003
84 Water Meters $1,410.25 $1,410.25 Paid 11/10/2003
85 Water Taps $20,505.00 $20,505.00 Paid 11/10/2003
89 Sewer Tap Fees $1,200.00 $1,200.00 Paid 11/10/2003
24 BLDG Permit Fees ($12,407.00) ($12,407.00) $0.00 N/A
25 Electrical Permit Fee ($1,115.78) ($1,115.78) $0.00 N/A
25 Mechanical Permit Fees ($295.00) ($295.00) $0.00 N/A
25 Plumbing Permit Fees ($226.00) ($226.00) $0.00 N/A
84 Water Meters ($1,410.25) ($1,410.25) $0.00 N/A
85 Water Taps ($20,505.00) ($20,505.00) $0.00 N/A
89 Sewer Tap Fees ($1,200.00) ($1,200.00) $0.00 N/A
24 BLDG Permit Fees $12,242.00 $12,242.00 Paid 11/10/2003
25 Electrical Permit Fee $1,115.78 $1,115.78 Paid 11/10/2003
25 Mechanical Permit Fees $295.00 $295.00 Paid 11/10/2003
25 Plumbing Permit Fees $226.00 $226.00 Paid 11/10/2003
84 Water Meters $1,410.25 $1,410.25 Paid 11/10/2003
85 Water Taps $20,505.00 $20,505.00 Paid 11/10/2003
89 Sewer Tap Fees $1,200.00 $1,200.00 Paid 11/10/2003
Road and Bridge Escrow $3,818.93 $3,818.93 Paid 02/01/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Foundation Inspection - Commercial Failed 11/06/2003
Correction
Corrective Action Required
11/06/2003
COLUMNS @ TUNNEL LEVEL PERMIT NOT YET OBTAINED. OK TO CLOSE FORMS AT RISK OF PERMIT APPLICANT: COLUMNS C2; C2.8; C3.2; C4 CONFORM TO CODES & APPROVED PERMIT DRWGS
Rough Framing Inspection - Commercial Partial 02/03/2004
Correction
Partial Correction
02/03/2004
CONCRETE COLUMNS - FIRST LEVEL COLUMNS ON LINES (J); (F) (1) & (2.4) E/2; E/3; E/4 + AMBULANCE PARKING AREA
Water Service Inspection Partial 02/17/2004
Correction
Partial Correction
02/17/2004
FIRE LINE: SHUT-OFF TO BLDG ENTRY VISUAL OK PRESSURE TEST TO FOLLOW
Water Service Inspection Partial 02/18/2004
Correction
Partial Correction
02/18/2004
FIRE LINE: SHUT-OFF TO BLDG ENTRY VISUAL OK PRESSURE TEST TO FOLLOW
Correction
Partial Correction
02/18/2004
DOMESTIC WATER: METER PIT TO BLDG ENTRY VISUAL OK PRESSURE TEST TO FOLLOW
Rough Framing Inspection - Commercial Partial 02/19/2004
Correction
Partial Correction
02/19/2004
CONCRETE COLUMNS - FIRST LEVEL COLUMNS ON LINES (J); (F) (1) & (2.4) + F/4; F/5; E/1; E/5; OK TO POUR WHEN READY E/2; E/3; E/4 + AMBULANCE PARKING AREA
Rough Framing Inspection - Commercial Partial 02/26/2004
Correction
Partial Correction
02/26/2004
CONCRETE COLUMNS - FIRST LEVEL COLUMNS ON LINES (J); (F) (1) & (2.4) + F/4; F/5; E/1; E/5; ALL ON E ELEVATION RADIUS WALL; OK TO POUR WHEN READY E/2; E/3; E/4 + AMBULANCE PARKING AREA
Rough Framing Inspection - Commercial Partial 03/01/2004
Correction
Partial Correction
03/01/2004
CONCRETE COLUMNS - FIRST LEVEL E/2; E/3; E/4 +; AMBULANCE PARKING AREA; COLUMNS ON LINES (J); (F) (1) & (2.4) + F/4; F/5; E/1; E/5; ALL ON E ELEVATION RADIUS WALL; A.9/2.3; A.9/3.7; C.6/5; D/1; D/2; D/3; D/4; OK TO POUR WHEN READY ENSURE RE-BAR COVERAGE
Rough Framing Inspection - Commercial Partial 03/03/2004
Correction
Partial Correction
03/03/2004
CONCRETE COLUMNS - FIRST LEVEL E/2; E/3; E/4 +; AMBULANCE PARKING AREA; COLUMNS ON LINES (J); (F) (1) & (2.4) + F/4; F/5; E/1; E/5; ALL ON E ELEVATION RADIUS WALL; A.9/2.3; A.9/3.7; C.6/5; D/1; D/2; D/3; D/4; C/2; C/2.8; C/3.2; C/4; D/5; OK TO POUR WHEN READY ENSURE RE-BAR COVERAGE
Suspended Slab Inspection Partial 03/24/2004
Correction
Partial Correction
03/24/2004
ROOF/MEZZANINE FLOOR SLAB CONFIGURATION OK TO POUR WHEN READY & WHEN AUTHORIZED BY SEA NORTH/EAST OF (F) WORKMANSHIP & GENERAL
Rough Framing Inspection - Commercial Partial 03/31/2004
Correction
Partial Correction
03/31/2004
CIP CONCRETE COLUMNS - 2ND LEVEL C/2.8; C/3.2; D/2; D/3; E/3; OK TO POUR WHEN READY ENSURE RE-BAR COVERAGE
Correction
Resolved
03/31/2004
CONCRETE COLUMNS - FIRST LEVEL
Rough Framing Inspection - Commercial Passed 04/02/2004
Correction
Resolved
04/02/2004
CIP CONCRETE COLUMNS - 2ND LEVEL C/2.8; C/3.2; D/2; D/3; E/3; C/2; C/4; D/4; E/2; E/4 OK TO POUR WHEN READY ENSURE RE-BAR COVERAGE
Suspended Slab Inspection Passed 04/08/2004
Correction
Resolved
04/08/2004
ROOF/MEZZANINE FLOOR SLAB
Correction
Resolved
04/08/2004
PENTHOUSE ROOF DECK CONTINGENT ON SEA APPROVAL NO ISSUES NOTED OK TO POUR WHEN READY
Rough Plumbing Inspection - Commercial Partial 05/03/2004
Correction
Partial Correction
05/03/2004
TOP ROUGH DWV & ROOF DRAIN 1ST FLR W OF E.5; PRESSURE TEST OK
Rough Plumbing Inspection - Commercial Partial 05/04/2004
Correction
Partial Correction
05/04/2004
TOP ROUGH DWV & ROOF DRAIN E OF E.5 x S OF 3.2; E OF E.5 x N OF 3.2; 1ST LEVEL NOW COMPLETE EXCEPT TWO PENTHOUSE DRAINS VISUAL & PRESSURE TEST OK 1ST FLR W OF E.5;
Rough Plumbing Inspection - Commercial Partial 05/05/2004
Correction
Partial Correction
05/05/2004
TOP ROUGH DWV & ROOF DRAIN 1ST FLR W OF E.5; E OF E.5 x S OF 3.2; E OF E.5 x N OF 3.2; TWO PENTHOUSE DRAINS COMPLETE 1ST LEVEL; VISUAL & PRESSURE TEST OK
Rated Assembly Inspection Partial 05/28/2004
Correction
Partial Correction
05/28/2004
FIREPROFING OF CLERESTORY COLUMNS NORTH TOWER; PROCEED AS DISCUSSED
Rated Assembly Inspection Partial 06/02/2004
Correction
Partial Correction
06/02/2004
FIREPROFING OF CLERESTORY COLUMNS NORTH TOWER COLUMNS; INSPECTED IN PROGRESS AS DISCUSSED EARLIER
Rated Assembly Inspection Partial 06/07/2004
Correction
Partial Correction
06/07/2004
FIREPROFING OF CLERESTORY COLUMNS NORTH TOWER COLUMNS; ~2` ADJACENT TO EXP JT @ C.6/5.2; INSPECTED IN PROGRESS MATERIAL + APPLICATION
All Rough Inspection - Commercial Failed 07/06/2004
Correction
Corrective Action Required
07/06/2004
PROTECTION OF WATER PIPING INSTALL GROMMETS OR OTHER APPROVED PROTECTION FROM SHARP EDGES & DISSIMILAR METAL AT PENETRATION OF STEEL STUDS & TRACKS
Correction
Corrective Action Required
07/06/2004
PROTECTION OF COPPER PIPING IPC 305.8; IRC P2603: INSTALL SHIELD PLATES AT STUDS & TRACKS < 1-1/2" FROM FACE OF STUDS & TRACKS
Correction
Corrective Action Required
07/06/2004
DAMAGE TO LIGHT - GUAGE STEEL FRAMING ELECTRICAL & PLUMBING SYSTEMS EXCESSIVE REMOVAL OF STUD/TRACK WEBS
Correction
Corrective Action Required
07/06/2004
ENCLOSING OF BUILDING FOR GWB INSTALLATION INCOMPLETE
All Rough Inspection - Commercial Passed 07/08/2004
Correction
Resolved
07/08/2004
INSULATION & GYPSUM WALLBOARD WHEN READY OK TO INSULATE OK TO INSTALL GWB
Correction
Resolved
07/08/2004
PROTECTION OF WATER PIPING
Correction
Resolved
07/08/2004
PROTECTION OF COPPER PIPING
Correction
Resolved
07/08/2004
DAMAGE TO LIGHT - GUAGE STEEL FRAMING
Correction
Resolved
07/08/2004
ENCLOSING OF BUILDING FOR GWB INSTALLATION ENSURE GWB AREAS ARE WEATHER TIGHT
Electrical Service Inspection Passed 07/22/2004
Correction
Resolved
07/22/2004
ELECTRICAL SERVICE INSTALLATION RELEASE SERVICE
Rated Assembly Inspection Partial 07/28/2004
Correction
Partial Correction
07/28/2004
TYPE "A" GWB WALLS - UL DESIGN #465 ROOMS B140 - 142; SINGLE LAYER TYPE "X" OK TO COVER WHEN READY
Correction
Partial Correction
07/28/2004
TYPE "D" GWB WALLS - UL DESIGN #411 RMS B137 - 139; 149 1ST LAYER; OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 07/30/2004
Correction
Resolved
07/30/2004
ENCLOSING OF BUILDING FOR GWB INSTALLATION
Correction
Partial Correction
07/30/2004
INSULATION & GYPSUM WALLBOARD OK TO COVER WHEN READY RM B123 PLAN S WALL IN-WALL SYSTEMS
Underground Electrical Inspection - Commercial Not Ready 08/03/2004
Correction
Corrective Action Required
08/03/2004
LIGHTNING PROTECTION BURIED RING ALREADY COVERED NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 08/04/2004
Correction
Partial Correction
08/04/2004
TYPE "D" GWB WALLS - UL DESIGN #411 RMS B137 - 139; 149 1ST LAYER; ISOLATION OF CORR B149 PLAN N, E, W WALLS I/S FACE 2ND LAYER; N WALL O/S FACE 1ST LAYER; OK TO COVER WHEN READY
Correction
Partial Correction
08/04/2004
2-HR WALL @ CORR B103 PLAN S WALL S FACE 1ST LAYER; UL 411 WALL DESIGN OK TO COVER WHEN READY
Rated Assembly Inspection Partial 08/09/2004
Correction
Partial Correction
08/09/2004
TYPE "D" GWB WALLS - UL DESIGN #411 RMS B137 - 139, 149 2ND LAYER; ISOLATION OF CORR B149 PLAN N, E, W WALLS I/S FACE 2ND LAYER; N WALL O/S FACE 2ND LAYER; OK TO COVER WHEN READY
Correction
Partial Correction
08/09/2004
2-HR WALL @ CORR B103 PLAN S WALL ON E.6 FRM (4.6) TO (5.2) S FACE 2ND LAYER; RM B117 E WALL 1ST LAYER; UL 411 WALL DESIGN OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 08/10/2004
Correction
Partial Correction
08/10/2004
LIGHTNING PROTECTION BURIED RING AT EAST ENTRANCE ONLY. RING AT WEST SIDE OF BUILDING NOT READY FOR INSPECTION. CODUCTORS & GROUND RODS OK TO COVER WHEN READY
Rated Assembly Inspection Partial 08/10/2004
Correction
Partial Correction
08/10/2004
FIREPROFING OF CLERESTORY COLUMNS NORTH TOWER COLUMNS; ~2` ADJACENT TO EXP JT @ C.6/5.2; INSPECTED IN PROGRESS MATERIAL + APPLICATION
Correction
Partial Correction
08/10/2004
TYPE "A" GWB WALLS - UL DESIGN #465 ROOMS B140 - 142; SINGLE LAYER TYPE "X"
Correction
Partial Correction
08/10/2004
TYPE "D" GWB WALLS - UL DESIGN #411 RMS B137 - 139, 149 2ND LAYER; ISOLATION OF CORR B149 PLAN N, E, W WALLS I/S FACE 2ND LAYER; N WALL O/S FACE 2ND LAYER;
Correction
Partial Correction
08/10/2004
2-HR WALL @ CORR B103 PLAN S WALL ON E.6 FRM (4.6) TO (5.2) S FACE 2ND LAYER; RM B117 E WALL 2ND LAYER; UL 411 WALL DESIGN OK TO COVER WHEN READY
Rated Assembly Inspection Partial 08/12/2004
Correction
Partial Correction
08/12/2004
TYPE "A" GWB WALLS - UL DESIGN #465 RMS B140 - 142; RMS 123 & 124 E WALL BOTH FACES; SINGLE LAYER TYPE "X"
Correction
Partial Correction
08/12/2004
2-HR WALL @ CORR B103 PLAN S WALL ON E.6 FRM (4.6) TO (5.2) S FACE 2ND LAYER; RM B117 E WALL 2ND LAYER; AREA OF DR B103 1ST LAYER S & N OF DR; UL 411 WALL DESIGN OK TO COVER WHEN READY
Correction
Partial Correction
08/12/2004
1HR WALL @ CORRIDOR B102 S END OF CORR 1ST LAYER; OK TO COVER WHEN READY
Above Ceiling Inspection Partial 08/12/2004
Correction
Partial Correction
08/12/2004
ABOVE-CEILING SYSTEMS @ GWB CEILING & SOFFIT SPACES B148; B104; B118; OK TO COVER WHEN READY
Rated Assembly Inspection Partial 08/16/2004
Correction
Partial Correction
08/16/2004
2-HR WALL @ CORR B103 PLAN S WALL ON E.6 FRM (4.6) TO (5.2) S FACE 2ND LAYER; RM B117 E WALL 2ND LAYER; VESTIBULE @ DR B103 2ND LAYER S & N OF DR; UL 411 WALL DESIGN OK TO COVER WHEN READY
Rated Assembly Inspection Partial 08/23/2004
Correction
Resolved
08/23/2004
FIREPROFING OF CLERESTORY COLUMNS
Correction
Partial Correction
08/23/2004
U905 CMU WALLS B133 E WALL; OK TO COVER WHEN READY
Rated Assembly Inspection Partial 08/30/2004
Correction
Resolved
08/30/2004
FIRE-STOPPING @ TOPS OF CANOPY COLUMNS 4" MINERAL FIBER SEALED @ TOP W/ >= 1/8" JM FIRETEMP SE PER A6.1.2 DETAIL 21 OK TO COVER WHEN READY
Above Ceiling Inspection Partial 09/02/2004
Correction
Partial Correction
09/02/2004
ABOVE-CEILING SYSTEMS @ GWB CEILING & SOFFIT SPACES B148; B104; B118; CANOPY OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 09/23/2004
Correction
Partial Correction
09/23/2004
LIGHTING CONDUIT BURIED AROUND CIRCUMFERENCE OF HELO-PAD OK TO COVER WHEN READY FACING REAR OF BUILDING FROM 4 TO 12 O'CLOCK
Underground Electrical Inspection - Commercial Partial 09/24/2004
Correction
Resolved
09/24/2004
LIGHTING CONDUIT BURIED AROUND CIRCUMFERENCE OF HELO-PAD + 12 O'C TO 4 O'C DEPTH WITNESSED BY JED. OK TO COVER WHEN READY FACING REAR OF BUILDING FROM 4 TO 12 O'CLOCK
Correction
Resolved
09/24/2004
8 CAST-IN LIGHT FIXTURES @ OUTER EDGE OF PAD OK TO COVER WHEN READY HOUSINGS SET; CONNECTIONS SUBSTANTIALLY DONE
Underground Electrical Inspection - Commercial Partial 09/30/2004
Correction
Resolved
09/30/2004
8 CAST-IN LIGHT FIXTURES @ OUTER EDGE OF PAD HELO-PAD
Correction
Resolved
09/30/2004
6 LIGHT PEDESTALS OUTSIDE CIRCUMFERENCE OF HELO PAD PREP'D FOR POUR OK TO POUR WHEN READY
Underground Electrical Inspection - Commercial Partial 10/05/2004
Correction
Resolved
10/05/2004
6 LIGHT PEDESTALS OUTSIDE CIRCUMFERENCE OF HELO PAD
Correction
Partial Correction
10/05/2004
LANDING DIRECTION LIGHTS #1, #2, #3 FROM PAD; TYPE HPA OK TO COVER WHEN READY
Above Ceiling Inspection Partial 10/15/2004
Correction
Resolved
10/15/2004
ABOVE-CEILING SYSTEMS @ GWB CEILING & SOFFIT SPACES B148; B104; B118; CANOPY
Correction
Partial Correction
10/15/2004
ABOVE-CEILING SYSTEMS @ ACT SPACES GARAGE 134 PENDING FINAL INSP OK TO COVER WHEN READY RMS 119 - 149
Above Ceiling Inspection Passed 10/19/2004
Correction
Resolved
10/19/2004
ABOVE-CEILING SYSTEMS @ ACT SPACES GARAGE 134 PENDING FINAL INSP OK TO COVER WHEN READY RMS 101 - 149
All Rough Inspection - Commercial Passed 02/01/2005
Correction
Resolved
02/01/2005
INSULATION & GYPSUM WALLBOARD RM B123 PLAN S WALL IN-WALL SYSTEMS
Rated Assembly Inspection Passed 02/01/2005
Correction
Resolved
02/01/2005
TYPE "A" GWB WALLS - UL DESIGN #465
Correction
Resolved
02/01/2005
TYPE "D" GWB WALLS - UL DESIGN #411
Correction
Resolved
02/01/2005
2-HR WALL @ CORR B103
Correction
Resolved
02/01/2005
1HR WALL @ CORRIDOR B102
Correction
Resolved
02/01/2005
U905 CMU WALLS
Correction
Resolved
02/01/2005
FIRE-STOPPING @ TOPS OF CANOPY COLUMNS
Above Ceiling Inspection Passed 02/01/2005
Correction
Resolved
02/01/2005
ABOVE-CEILING SYSTEMS @ GWB CEILING & SOFFIT SPACES
Correction
Resolved
02/01/2005
ABOVE-CEILING SYSTEMS @ ACT SPACES
Underground Electrical Inspection - Commercial Passed 02/01/2005
Correction
Resolved
02/01/2005
LIGHTNING PROTECTION BURIED RING
Correction
Resolved
02/01/2005
LIGHTING CONDUIT BURIED AROUND CIRCUMFERENCE OF HELO-PAD
Correction
Resolved
02/01/2005
8 CAST-IN LIGHT FIXTURES @ OUTER EDGE OF PAD
Correction
Resolved
02/01/2005
6 LIGHT PEDESTALS OUTSIDE CIRCUMFERENCE OF HELO PAD
Correction
Resolved
02/01/2005
LANDING DIRECTION LIGHTS
Water Service Inspection Passed 02/01/2005
Correction
Resolved
02/01/2005
FIRE LINE: SHUT-OFF TO BLDG ENTRY
Correction
Resolved
02/01/2005
DOMESTIC WATER: METER PIT TO BLDG ENTRY
Correction
Resolved
02/01/2005
METER PIT ACCESS MODIFICATIONS PER RICH THOMAS 2/1/05
Suspended Slab Inspection Passed 02/01/2005
Correction
Resolved
02/01/2005
ROOF/MEZZANINE FLOOR SLAB
Correction
Resolved
02/01/2005
PENTHOUSE ROOF DECK
Foundation Inspection - Commercial Passed 02/01/2005
Correction
Resolved
02/01/2005
COLUMNS @ TUNNEL LEVEL
Occupancy Inspection - Codes Commercial Failed 02/01/2005
Correction
Partial Correction
02/01/2005
Receive Planning & Development Approval
Correction
Partial Correction
02/01/2005
Receive Fire Department approval
Correction
Partial Correction
02/01/2005
Receive Public Works Approval
Correction
Partial Correction
02/01/2005
Receive Water Utilities Approval
Correction
Corrective Action Required
02/01/2005
HANDICAPPED ACCESSIBLE RESTROOM SIGNS NOT IN PLACE
Correction
Corrective Action Required
02/01/2005
ROOFTOP/PENTHOUSE REQUEST REINSPECTION WHEN READY
Correction
Corrective Action Required
02/01/2005
CORRIDOR CONNECTION WITH BUILDING "A" TO BE COMPLETED
Correction
Corrective Action Required
02/01/2005
LANDSCAPING TO ENSURE EROSION CONTROL SOD, SEED OR OTHER
Correction
Corrective Action Required
02/01/2005
PERMANENT CONFIGURATION OF EGRESS PATHS TO BE COMPLETED
Rough Framing Inspection - Commercial Passed 02/01/2005
Correction
Resolved
02/01/2005
CONCRETE COLUMNS - FIRST LEVEL
Correction
Resolved
02/01/2005
CIP CONCRETE COLUMNS - 2ND LEVEL
Occupancy Inspection - Codes Commercial Passed 04/08/2005
Correction
Resolved
04/08/2005
Receive Water Utilities Approval NO ISSUES PRESENTED
Correction
Resolved
04/08/2005
HANDICAPPED ACCESSIBLE RESTROOM SIGNS
Correction
Resolved
04/08/2005
ROOFTOP/PENTHOUSE
Correction
Resolved
04/08/2005
CORRIDOR CONNECTION WITH BUILDING "A" TO BE COMPLETED AS PART OF BUILDING "A"
Correction
Resolved
04/08/2005
LANDSCAPING TO ENSURE EROSION CONTROL
Correction
Resolved
04/08/2005
PERMANENT CONFIGURATION OF EGRESS PATHS TO BE COMPLETED AS PART OF BUILDING "A"
Correction
Resolved
04/08/2005
Receive Fire Department approval PER NEIL ULLERY NO REMAINING ISSUES
Correction
Resolved
04/08/2005
Receive Planning & Development Approval PER MIKE GORECKI 4/5/05
Correction
Resolved
04/08/2005
Receive Public Works Approval NO ISSUES PRESENTED
Rough Plumbing Inspection - Commercial Passed 04/08/2005
Correction
Resolved
04/08/2005
TOP ROUGH DWV & ROOF DRAIN
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home