Permit Application Status

B0301128


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0301128
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
NEW COMMERCIAL
BLDG, ENERGY CENTER AND BASEMENT
06/17/2003
11/10/2003
05/08/2004
05/12/2006
Locations
Contacts
ACI BOLAND, Address:11229 NALL  
SHAFER, KLINE & WARREN, Address:2940 MAIN ST.  
JE DUNN CONSTRUCTION CO, Address:929 HOLMES RD  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/02/2004 10/29/2010
Correction

St. Lukes - The City shall not issue any temporary or final Certificate of Occupancy for any structure in the Developerment until a Certificate of Substantial Completion for the Road Improvements has been issued by MoDOT.
Correction

St. Lukes - A Proprtionate Share of the Total Road Contribution shall be made to the City at or before the time a certificate of occupancy is issued by the City for a building constructed by, or by a building contractor on behalf of, the Developer on the Property, excluding the medical office buildings.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

All proposed hose bibb connections must have an approved (vacuum breaker) backflow preventer.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $29,057.00 $29,057.00 Paid 11/10/2003
25 Electrical Permit Fee $608.00 $608.00 Paid 11/10/2003
25 Mechanical Permit Fees $277.50 $277.50 Paid 11/10/2003
25 Plumbing Permit Fees $266.00 $266.00 Paid 11/10/2003
85 Water Taps $82,020.00 $82,020.00 Paid 11/10/2003
89 Sewer Tap Fees $90.00 $90.00 Paid 11/10/2003
24 BLDG Permit Fees $6,504.00 $6,504.00 Paid 03/12/2004
25 Electrical Permit Fee $30.00 $30.00 Paid 03/12/2004
Inspection Overtime $150.00 $150.00 Paid 02/03/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Foundation Inspection - Commercial Failed 11/06/2003
Correction
Corrective Action Required
11/06/2003
BASEMENT WALLS INCLUSIVE OF INTEGRAL COLUMNS PERMIT NOT YET OBTAINED. OK TO CLOSE FORMS AT RISK OF PERMIT APPLICANT: (7) FROM (D) EAST TO (B.5) CONFORM TO CODES & APPROVED PERMIT DRWGS
Foundation Inspection - Commercial Passed 11/11/2003
Correction
Resolved
11/11/2003
BASEMENT WALLS INCLUSIVE OF INTEGRAL COLUMNS
Sewer Service Inspection - Commercial Request Complete 11/17/2003 11/18/2003 11/18/2003
Sewer Service Inspection - Commercial Request Complete 11/17/2003 11/18/2003 11/18/2003
Sewer Service Inspection - Commercial Request Complete 11/18/2003 11/19/2003 11/19/2003
Suspended Slab Inspection Not Ready 02/04/2004
Correction
Corrective Action Required
02/04/2004
PAN SLAB ROOF STRUCTURE COVERED BY WEATHER PROTECTION BLANKETS. CALL FOR REINSPECTION WHEN READY (1) TO (3.8) x (A) TO (D) NOT READY FOR INSPECTION
Suspended Slab Inspection Partial 02/09/2004
Correction
Partial Correction
02/09/2004
PAN SLAB ROOF STRUCTURE (1) TO (3.8) x (A) TO (D) OK TO POUR WHEN READY
Suspended Slab Inspection Passed 02/19/2004
Correction
Resolved
02/19/2004
PAN SLAB ROOF STRUCTURE + N 2/3 OF DECK OK TO POUR WHEN READY (1) TO (3.8) x (A) TO (D)
Gas Piping Inspection - Commercial Passed 04/13/2004
Correction
Resolved
04/13/2004
NATURAL GAS PIPING VISUAL OK. TEST PRESSURE LEVEL HELD STEADY AT 60 PSI FOR > 4 HRS. THROUGHOUT LOWER LEVEL 8" - 3" WELDED STEEL PIPE
Rough Plumbing Inspection - Commercial Passed 05/07/2004
Correction
Resolved
05/07/2004
FUEL OIL LINES FROM TANKS TO BUILDING PRESSURE TEST HELD STEADY @ 60 PSI FOR > 120 MIN
Rough Plumbing Inspection - Commercial Partial 05/17/2004
Correction
Partial Correction
05/17/2004
OXYGEN PIPING PRESSURE TEST OK MEZZANINE + TO SW CORNER
Correction
Partial Correction
05/17/2004
ROOF DRAIN PIPING @ BASEMENT LEVEL TWO 6" C.I. RISERS @ (1) BETWEEN (B) & (C) OK; TWO 6" C.I. RISERS @ (3) BETWEEN (B) & (C) TO BE TESTED LATER; VISUAL & PRESSURE
Rough Plumbing Inspection - Commercial Partial 05/18/2004
Correction
Resolved
05/18/2004
OXYGEN PIPING PRESSURE TEST OK MEZZANINE + TO SW CORNER
Correction
Partial Correction
05/18/2004
DWV PIPING @ BASEMENT LEVEL (1)TO (2) x (A) TO (D) TWO LEAKS MARKED FOR REPAIR; (A) TO (A.6) x (1) TO (3.5); (A.6) TO (D) x (3.5) TO (4)TWO LEAKS MARKED FOR REPAIR; VISUAL & PRESSURE TEST
Rough Plumbing Inspection - Commercial Partial 05/21/2004
Correction
Partial Correction
05/21/2004
DWV PIPING @ BASEMENT LEVEL (1)TO (2) x (A) TO (D) TWO LEAKS MARKED FOR REPAIR; (A) TO (A.6) x (1) TO (3.5); (A.6) TO (D) x (3) TO (4); VISUAL & PRESSURE TEST
Rough Plumbing Inspection - Commercial Partial 05/24/2004
Correction
Partial Correction
05/24/2004
DWV PIPING @ BASEMENT LEVEL (1)TO (2) x (A) TO (D) TWO LEAKS MARKED FOR REPAIR; (A) TO (A.6) x (1) TO (3.5); (A.6) TO (D) x (3) TO (4); (4) TO (7) x (A) TO (B) [1 LEAK TO BE REPAIRED]; TWO 4" RISERS @ (B)/(6) + BRANCHES; FURTHER SUPPORT RISERS @ MEZZANINE VISUAL & PRESSURE TEST
Rough Framing Inspection - Commercial Partial 05/26/2004
Correction
Resolved
05/26/2004
KEYWAY & WATERSTOP AND WATERSTOP IS CLEAN & PROPERLY POSITIONED. WHEN SETTING FORMS ENSURE KEYWAY IS CLEAR
Correction
Partial Correction
05/26/2004
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS ALONG (D`) FROM (13) TO (12) + ALONG (13) FROM (D`) TO (C.5`); OK TO POUR WHEN READY ENSURE RE-BAR CLEARANCE
Gas Piping Inspection - Commercial Passed 06/03/2004
Gas Service Inspection - Commercial Passed 06/03/2004
Correction
Resolved
06/03/2004
TEST PRESSURE LEVEL RELEASE GAS SERVICE HELD STEADY AT >= 60 PSI FOR 30 MIN
Rough Plumbing Inspection - Commercial Failed 06/07/2004
Correction
Partial Correction
06/07/2004
DWV PIPING @ BASEMENT LEVEL (1)TO (2) x (A) TO (D) TWO LEAKS MARKED FOR REPAIR; (A) TO (A.6) x (1) TO (3.5); (A.6) TO (D) x (3) TO (4); (4) TO (7) x (A) TO (B); TWO 4" RISERS @ (B)/(6) + BRANCHES; (5) TO (7) x (B) TO (D) ONE LEAK VISUAL & PRESSURE TEST SUPPORT RISERS @MEZZANINE
Rough Plumbing Inspection - Commercial Partial 06/08/2004
Correction
Partial Correction
06/08/2004
DWV PIPING @ BASEMENT LEVEL VISUAL & PRESSURE TEST OK AT: (A) TO (A.6) x (1) TO (3.5); (A.6) TO (D) x (3) TO (4); (4) TO (7) x (A) TO (B); TWO 4" RISERS @ (B)/(6) + BRANCHES; (5) TO (7) x (B) TO (D) RISERS @MEZZANINE YET TO BE SUPPORTED ONE LEAK BEING REPAIRED @ (1)TO (2) x (A) TO (D)
Electrical Service Inspection Passed 06/10/2004
Correction
Resolved
06/10/2004
ELECTRICAL SERVICE INSTALLATION RELEASE SERVICE
Rough Framing Inspection - Commercial Partial 06/14/2004
Correction
Partial Correction
06/14/2004
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS ALONG (D`) FROM (13) TO (12) + ALONG (13) FROM (D`) TO (C.5`) WITH RE-BAR REVISIONS DIRECTED BY SEA; OK TO POUR WHEN READY ENSURE RE-BAR CLEARANCE
Rough Framing Inspection - Commercial Partial 06/18/2004
Correction
Partial Correction
06/18/2004
C.I.P. COLUMNS POURED INTEGRAL WITH ELEVATOR PIT WALLS OK TO POUR WHEN READY A.8/9.5; B.8/9.5;
Rough Framing Inspection - Commercial Partial 06/23/2004
Correction
Partial Correction
06/23/2004
C.I.P. CONCRETE COLUMNS - ISOLATED B`/12; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Correction
Partial Correction
06/23/2004
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS ALONG (D`) FROM (13) TO (12) + ALONG (13) FROM (D`) TO (C.5`); ALONG (13) FROM (A.5`) TO (C.5`); OK TO POUR WHEN READY ENSURE RE-BAR CLEARANCE
Rough Framing Inspection - Commercial Partial 06/24/2004
Correction
Partial Correction
06/24/2004
C.I.P. CONCRETE COLUMNS - ISOLATED B`/12; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 06/28/2004
Correction
Partial Correction
06/28/2004
C.I.P. CONCRETE COLUMNS - ISOLATED B`/12; B/8; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Correction
Partial Correction
06/28/2004
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS ALONG (D`) FROM (13) TO (12) + ALONG (13) FROM (D`) TO (C.5`); ALONG (13) FROM (A.5`) TO (C.5`); ALONG (A/A`) FROM (7) TO (10); OK TO POUR WHEN READY ENSURE RE-BAR CLEARANCE
Rough Framing Inspection - Commercial Partial 06/29/2004
Correction
Partial Correction
06/29/2004
C.I.P. COLUMNS POURED INTEGRAL WITH ELEVATOR PIT WALLS A.8/9.5; B.8/9.5;
Correction
Partial Correction
06/29/2004
C.I.P. CONCRETE COLUMNS - ISOLATED B`/12; B/8; C/9; C`/11; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Correction
Partial Correction
06/29/2004
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS ALONG (D`) FROM (13) TO (12) + ALONG (13) FROM (D`) TO (C.5`); ALONG (13) FROM (A.5`) TO (C.5`); ALONG (A/A`) FROM (7) TO (10); ENSURE RE-BAR CLEARANCE
Rough Framing Inspection - Commercial Partial 06/30/2004
Correction
Resolved
06/30/2004
C.I.P. COLUMNS POURED INTEGRAL WITH ELEVATOR PIT WALLS A.8/9.5; B.8/9.5; A.8/10.5; B.8/10.5
Rough Framing Inspection - Commercial Partial 07/07/2004
Correction
Partial Correction
07/07/2004
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS ALONG (D`) FROM (13) TO (12) + ALONG (13) FROM (D`) TO (C.5`); ALONG (13) FROM (A.5`) TO (C.5`); ALONG (A/A`) FROM (7) TO (10); ALONG (A/A`) FROM (9.5) TO (12.5); ENSURE RE-BAR CLEARANCE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 07/09/2004
Correction
Partial Correction
07/10/2004
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS ALONG (D`) FROM (13) TO (12) + ALONG (13) FROM (D`) TO (C.5`); ALONG (13) FROM (A.5`) TO (C.5`); ALONG (A/A`) FROM (7) TO (10); ALONG (A/A`) FROM (9.5) TO (12.5); FROM (A`/13) W TO (A.5`) + S TO (12.5); ENSURE RE-BAR CLEARANCE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 07/14/2004
Correction
Resolved
07/14/2004
C.I.P. COLUMNS POURED INTEGRAL WITH ELEVATOR PIT WALLS A.8/9.5; B.8/9.5; A.8/10.5; B.8/10.5
Correction
Partial Correction
07/14/2004
C.I.P. CONCRETE COLUMNS - ISOLATED B`/12; B/8; C/9; C`/11; D`/11; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Correction
Partial Correction
07/14/2004
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS ALONG (D`) FROM (13) TO (12) + ALONG (13) FROM (D`) TO (C.5`); ALONG (13) FROM (A.5`) TO (C.5`); ALONG (A/A`) FROM (7) TO (10); ALONG (A/A`) FROM (9.5) TO (12.5); FROM (A`/13) W TO (A.5`) + S TO (12.5); ENSURE RE-BAR CLEARANCE
Rough Framing Inspection - Commercial Partial 07/22/2004
Correction
Partial Correction
07/22/2004
C.I.P. CONCRETE COLUMNS - ISOLATED B`/12; B/8; C/9; C`/11; D`/11; D/8; D/9; D/10; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 07/26/2004
Correction
Partial Correction
07/26/2004
C.I.P. CONCRETE COLUMNS - ISOLATED B`/12; B/8; C/9; C`/11; D`/11; D/8; D/9; D/10; C/8; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Passed 08/05/2004
Correction
Resolved
08/05/2004
None BALANCE OF UNDERGROUND PLUMBING COMPLETED OK TO COVER WHEN READY TUNNEL EXTENSION TO E BLD LAST 85 FT
Suspended Slab Inspection Partial 08/05/2004
Correction
Partial Correction
08/05/2004
None OK TO COVER WHEN READY D ROOF SLAB WEST 1/2 OF STRUCTURE
Suspended Slab Inspection Passed 08/26/2004
Correction
Resolved
08/26/2004
None
Correction
Resolved
08/26/2004
PAN SLAB ROOF STRUCTURE + N 2/3 OF DECK; ALT "A" AREA (8) TO (13) OK TO POUR WHEN READY (1) TO (3.8) x (A) TO (D)
Rough Electrical Inspection - Commercial Passed 09/03/2004
Correction
Resolved
09/03/2004
See Comment SHEET S10.3 COLUMNS 1-A, 1-B, 2-A GROUNDING APPROVED
Miscellaneous Inspection Passed 09/22/2004
Above Ceiling Inspection Failed 10/04/2004
Correction
Corrective Action Required
10/04/2004
ROOM A011 MEMBRANE PENETRATIONS NOT FIRE-SEALED
Above Ceiling Inspection Partial 10/05/2004
Correction
Partial Correction
10/05/2004
ROOM A011 PER A/E CLARIFICATION TO JED TYPE A WALLS HERE NOT UL465
All Rough Inspection - Commercial Partial 10/18/2004
Correction
Partial Correction
10/18/2004
WALL FRAMING + IN-WALL SYSTEMS ROUGH OK TO COVER WHEN READY ROOMS 008; 009; 010;
Above Ceiling Inspection Passed 12/10/2005
Correction
Resolved
12/10/2005
ROOM A011
All Rough Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH
Final Inspection - Commercial Not Ready 12/10/2005
Correction
Corrective Action Required
12/10/2005
SEALING OF RATED ASSEMBLIES
Correction
Resolved
12/10/2005
Receive Fire Department approval SEE FINISH PERMIT
Correction
Resolved
12/10/2005
Receive Water Utilities Approval SEE FINISH PERMIT
Rough Framing Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
C.I.P. CONCRETE BASEMENT WALL + INTEGRAL COLUMNS
Correction
Resolved
12/10/2005
KEYWAY & WATERSTOP
Correction
Resolved
12/10/2005
C.I.P. COLUMNS POURED INTEGRAL WITH ELEVATOR PIT WALLS
Correction
Resolved
12/10/2005
C.I.P. CONCRETE COLUMNS - ISOLATED
Rough Plumbing Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
FUEL OIL LINES FROM TANKS TO BUILDING
Correction
Resolved
12/10/2005
OXYGEN PIPING
Correction
Resolved
12/10/2005
ROOF DRAIN PIPING @ BASEMENT LEVEL
Correction
Resolved
12/10/2005
DWV PIPING @ BASEMENT LEVEL
Final Inspection - Commercial Failed 01/06/2006
Correction
Resolved
01/06/2006
SEALING OF RATED ASSEMBLIES
Correction
Resolved
01/06/2006
CODES ADMINISTRATION ISSUES PER 12/22/06 LIST ALL RESOLVED
Correction
Corrective Action Required
01/06/2006
TEST OF ELECTRICAL POWER EMERGENCY TRANSFER SWITCH SCHEDULED FOR 1/9/06
Correction
Corrective Action Required
01/06/2006
Receive Public Works Approval
Correction
Corrective Action Required
01/06/2006
Receive Planning & Development Approval
Final Inspection - Commercial Failed 01/09/2006
Correction
Resolved
01/09/2006
TEST OF ELECTRICAL POWER EMERGENCY TRANSFER SWITCH ENERGY CENTER SWITCHES TESTED BY SHAW ELECTRIC
Final Inspection - Commercial Failed 01/18/2006
Correction
Resolved
01/18/2006
EMERGENCY CIRCUITS @ ENERGY CENTER TESTED BY SHAW ELECTRIC SHAW CERT LTR DTD 1/9/06
Final Inspection - Commercial Passed 01/26/2006
Correction
Resolved
01/26/2006
Receive Public Works Approval PER BILL LYON 1/23/06
Correction
Resolved
01/26/2006
Receive Planning & Development Approval SEE PERMIT B0500162
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home