Permit Application Status

B0300361


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0300361
Building Permit - Commercial
Final Completion
LEES SUMMIT SCHOOL DIST R 7
ALTERATION COMMERCIAL
AREA "D" HIGH SCHOOL ALTERATIONS
03/11/2003
04/11/2003
10/08/2003
08/20/2003
Locations
Contacts
JE DUNN CONSTRUCTION CO., Address:929 HOLMES  
LEES SUMMIT SCHOOL DIST R 7, Address:600 MILLER  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 09/07/2003 10/29/2010
Correction

CA - ANSI A117.1-1998 404.2.7 - Door Hardware. Handles, pulls, latches, locks, and other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight grasping, pinching, or twisting of the wrist to operate. Such hardware shall be 34 inches minimum and 48 inches maximum above the floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides.
Correction

Fire Department- Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appliances.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Each layer of fire-resistive assemblies shall be inspected and approved prior to the application of additional layers or finishes. All firestopping of penetrations and required dampers shall be inspected and approved prior to concealing.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - 2000 IBC 715.2 - Installation. Fire dampers, smoke dampers, combination fire/smoke dampers and ceiling dampers located in air distribution and smoke-control systems shall be installed in accordance with the requirements of this section, the manufacturer's installation instructions and listings.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $443.00 $443.00 Paid 04/11/2003
24 BLDG Plan Check Fees $27.35 $27.35 Paid 04/11/2003
25 Electrical Permit Fee $80.00 $80.00 Paid 04/11/2003
25 Mechanical Permit Fees $67.00 $67.00 Paid 04/11/2003
25 Plumbing Permit Fees $20.00 $20.00 Paid 04/11/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 07/02/2003
Correction
Partial Correction
07/02/2003
IN-WALL ELECTRICAL ROUGH - PARTIAL AREA "D" RMS 407- 411
Above Ceiling Inspection Failed 07/28/2003
Correction
Corrective Action Required
07/28/2003
READINESS FOR INSPECTION CONSEQUENTLY, INSPECTION IS PRELIMINARY ELECT WORK INCOMPLETE HVAC WORK INCOMPLETE
Correction
Corrective Action Required
07/28/2003
LOW VOLTAGE CABLE MAY NOT BE SUPPORTED FROM CEILING GRID OR FROM OTHER MEP SYSTEMS EXCEPT ASSOCIATED RACEWAYS. NOT SECURED TO STRUCTURE VARIOUS LOCATIONS
Correction
Corrective Action Required
07/28/2003
CMU's AT TOP OF WALLS EXAMPLE: CORRIDOR 415 NOT BONDED TO WALL VARIOUS LOCATIONS
Correction
Corrective Action Required
07/28/2003
ABANDONED/UNUSED MATERIALS INCOMPLETELY REMOVED
Correction
Corrective Action Required
07/28/2003
WALLS DESIGNATED AS FIRE-RATED NOT FIRE-SEALED PER DRAWINGS/SPECS
Correction
Corrective Action Required
07/28/2003
CEILING SPACES ACTING AS HVAC RETURN AIR PLENUMS CONTAIN COMBUSTIBLE MATLS VARIOUS LOCATIONS
All Rough Inspection - Commercial Passed 07/28/2003
Correction
Resolved
07/28/2003
IN-WALL ELECTRICAL ROUGH - PARTIAL
Above Ceiling Inspection Not Ready 08/01/2003
Correction
Corrective Action Required
08/01/2003
READINESS FOR INSPECTION PAT SUTLIF OF ACI FRANKHEISER HUTCHINS ARCHITECTS THAT FIRE-RATING OF CORRIDOR WALLS AND ABOVE-CEILING HVAC RA PLENUM SPACES IS UNDER CONSIDERATION BY A/E, GC, AND PROJECT OWNER. SEE RELATED CITATIONS ON PREVIOUS INSPECTION. LS CODE ADMINISTRATION WAS INFORMED 8/1/03 BY
Above Ceiling Inspection Passed 08/11/2003
Correction
Resolved
08/11/2003
READINESS FOR INSPECTION
Correction
Resolved
08/11/2003
LOW VOLTAGE CABLE
Correction
Resolved
08/11/2003
CMU's AT TOP OF WALLS
Correction
Resolved
08/11/2003
ABANDONED/UNUSED MATERIALS
Correction
Resolved
08/11/2003
WALLS DESIGNATED AS FIRE-RATED TO THE EXTENT FEASIBLE, PER ACI / FRANGKISER HUTCHENS REPORT OF ON-SITE MEETING HELD 8/4/03. OK TO COMPLETE INSTALLATION OF CEILING TILE. CORRIDOR WALLS ARE NOW FIRE/SMOKE BLOCKED
Correction
Resolved
08/11/2003
CEILING SPACES ACTING AS HVAC RETURN AIR PLENUMS HELD 8/4/03 ACI / FRANGKISER HUTCHENS REPORT OF ON-SITE MEETING
Occupancy Inspection - Codes Commercial Partial 08/14/2003
Correction
Partial Correction
08/14/2003
OCCUPANCY STATUS DO NOT ALLOW OCCUPANCY BY STUDENTS UNTIL REINSPECTION IS REQUESTED AND AUTHORIZATION IS ISSUED BY CODES ADMINISTRATION. OK THROUGH 8/19/03 FOR TEACHERS & ADMIN ONLY
Occupancy Inspection - Codes Commercial Passed 08/19/2003
Correction
Resolved
08/19/2003
OCCUPANCY STATUS OK TO OCCUPY ISSUE CERT OF OCCUPANCY
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: