Permit Application Status

B0300309


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0300309
Building Permit - Commercial
Final Completion
CAPTAIN FANCY TWO LLC
NEW OTHER
BARN
02/28/2003
02/28/2003
08/27/2003
01/20/2004
Locations
Contacts
JOHN W. IVEY, Address:209 JUNIPER  
CAPTAIN FANCY TWO LLC, Address:617 NW EDGEWOOD DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/27/2003 10/29/2010
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

P&D - This facility is allowed to house 1 horse per acre and may be used as a private facility only. It is not to be operated as a commercial stable wihout first going through the development process.
Correction

CA - The structure shall not be built over the caves without site engineering being performed to ensure the stability of the structure.
Correction

CA - 2 Sets of pre-engineered drawings shall be submitted to Codes Administration for approval prior to installation of the building.
Correction

CA - This permit and review was based on the private use of this facility. Structure and site do not meet the requirement for public use. In order to use this facility as a public facility a complete site plan and building plans must be submitted and reviewed by city staff for approval.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $374.00 $374.00 Paid 02/28/2003
25 Electrical Permit Fee $35.00 $35.00 Paid 02/28/2003
25 Electrical Permit Fee $20.00 $20.00 Paid 05/16/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Not Ready 06/30/2004
Correction
Corrective Action Required
06/30/2004
READINESS FOR INSPECTION ALSO, NO RECORD OF 3RD PARTY SOIL BEARING INSPECTION WORK REQUESTED FOR INSP NOT COMPLETED
Footing Inspection - Commercial Partial 07/01/2004
Correction
Partial Correction
07/01/2004
FRAME FOOTINGS + CONNECTING RAT WALL OK TO POUR WHEN READY: SOUTH WALL + S 12` OF N-S CROSS TIES EXCLUDING SW CORNER PIER & SECTION FROM 65` E TO 105` E OF SW CORNER; ENSURE BAR COVERAGE @ >= 3" TO BOTTOMS/BANKS
Correction
Resolved
07/01/2004
READINESS FOR INSPECTION
Footing Inspection - Commercial Partial 07/12/2004
Correction
Partial Correction
07/12/2004
FRAME FOOTINGS + CONNECTING RAT WALL OK TO POUR WHEN READY: SOUTH WALL + S 12` OF N-S CROSS TIES EXCLUDING SW CORNER PIER & SECTION FROM 65` E TO 105` E OF SW CORNER; E WALL + E 15` OF N WALL; ENSURE BAR COVERAGE @ >= 3" TO BOTTOMS/BANKS
Footing Inspection - Commercial Partial 07/14/2004
Correction
Partial Correction
07/14/2004
FRAME FOOTINGS + CONNECTING RAT WALL OK TO POUR WHEN READY: SOUTH WALL + S 12` OF N-S CROSS TIES EXCLUDING SW CORNER PIER & SECTION FROM 65` E TO 105` E OF SW CORNER; E WALL + E 15` OF N WALL; E 125` OF N WALL + INCLUDED CROSS TIES; ENSURE BAR COVERAGE @ >= 3" TO BOTTOMS/BANKS
Footing Inspection - Commercial Partial 07/15/2004
Correction
Partial Correction
07/15/2004
FRAME FOOTINGS + CONNECTING RAT WALL OK TO POUR WHEN READY: SOUTH WALL + S 12` OF N-S CROSS TIES EXCLUDING SW CORNER PIER & SECTION FROM 65` E TO 105` E OF SW CORNER; E WALL + E 15` OF N WALL; E 175` OF N WALL + INCLUDED CROSS TIES; ENSURE BAR COVERAGE @ >= 3" TO BOTTOMS/BANKS
Footing Inspection - Commercial Partial 07/21/2004
Correction
Partial Correction
07/21/2004
FRAME FOOTINGS + CONNECTING RAT WALL OK TO POUR WHEN READY: SOUTH WALL + S 12` OF N-S CROSS TIES EXCLUDING SW CORNER PIER & SECTION FROM 65` E TO 105` E OF SW CORNER; E WALL + E 15` OF N WALL; E 175` OF N WALL + INCLUDED CROSS TIES; W WALL + W 10` OF N WALL; ENSURE BAR COVERAGE @ >= 3" TO BOTTOMS/BANKS
Footing Inspection - Commercial Partial 07/22/2004
Correction
Partial Correction
07/22/2004
INTERIOR CROSS-TIES OK TO POUR WHEN READY: #1; NUMBERING EAST TO WEST ENSURE BAR COVERAGE
Correction
Resolved
07/22/2004
FRAME FOOTINGS + CONNECTING RAT WALL OK TO POUR WHEN READY: S WALL + S 12` OF N-S CROSS TIES EXCLUDING SW CORNER PIER & SECTION FROM 65` E TO 105` E OF SW CORNER; E WALL + E 15` OF N WALL; E 175` OF N WALL + INCL CROSS TIES; W WALL + W 10` OF N WALL; W 60` OF N WALL TO COMPLETE PERIMETER ENSURE BAR COVERAGE @ >= 3" TO BOTTOMS/BANKS
Footing Inspection - Commercial Partial 07/30/2004
Correction
Partial Correction
07/30/2004
INTERIOR CROSS-TIES OK TO POUR WHEN READY: #1; #2; #3; NUMBERING EAST TO WEST ENSURE BAR COVERAGE
Footing Inspection - Commercial Not Ready 08/02/2004
Correction
Partial Correction
08/02/2004
INTERIOR CROSS-TIES OK TO POUR WHEN READY: #1; #2; #3; #4 NOT READY NUMBERING EAST TO WEST ENSURE BAR COVERAGE
Footing Inspection - Commercial Partial 08/03/2004
Correction
Partial Correction
08/03/2004
INTERIOR CROSS-TIES OK TO POUR WHEN READY: #1; #2; #3; #4; #5; #8; #9; NUMBERING EAST TO WEST ENSURE BAR COVERAGE
Correction
Resolved
08/03/2004
FRAME FOOTINGS + CONNECTING RAT WALL
Footing Inspection - Commercial Partial 08/11/2004
Correction
Partial Correction
08/11/2004
FRAME FOOTINGS + CONNECTING RAT WALL OK TO POUR WHEN READY REMAINDER OF S WALL + PART OF SOUTH BUMP-OUT
Footing Inspection - Commercial Passed 08/12/2004
Correction
Resolved
08/12/2004
INTERIOR CROSS-TIES #1; #2; #3; #4; #5; #8; #9 #6; #7 OK TO POUR AFTER SPECIFIED RE-BAR CORRECTIONS ARE COMPLETED. NUMBERING EAST TO WEST ENSURE BAR COVERAGE
Correction
Resolved
08/12/2004
FRAME FOOTINGS + CONNECTING RAT WALL TO COMPLETE PERIMETER GRADE BEAMS & INTEGRAL COLUMN FOOTINGS. OK TO POUR WHEN READY REMAINDER OF SOUTH BUMP-OUT
Electrical Service Inspection Not Ready 05/04/2005
Correction
Corrective Action Required
05/04/2005
ELECTRICAL SERVICE INSTALLATION TWO 200 AMP PANELS INSTALLED. NOTE: IF NO WATER LINE GROUND EACH PANEL MUST HAVE APPROVED GROUND VIA TWO 1/2" x 8' GROUND RODS DRIVEN AT LEAST 6' APART. NOT PER PERMIT WHICH SAYS ONE 200 AMP PANEL
Electrical Service Inspection Passed 05/17/2005
Correction
Resolved
05/17/2005
ELECTRICAL SERVICE INSTALLATION TWO 200 AMP PANELS RELEASE SERV ICE
Water Service Inspection Not Ready 03/20/2006
Correction
Corrective Action Required
03/20/2006
STATUS OF SERVICE INSTALLATION APPROVAL SERICE LINE WAS INSTALLED AND COVERED WITHOUT APPROVAL. NOTICE OF VIOLATION TO BE ISSUED NO INSPECTION REQUEST + NO APPROVAL OF RECORD
Water Service Inspection - Commercial Request Complete 3/17/2006 3/20/2006 03/20/2006
Water Service Inspection Not Ready 03/27/2006
Correction
Corrective Action Required
03/27/2006
STATUS OF SERVICE INSTALLATION APPROVAL SERVICE LINE WAS INSTALLED AND COVERED WITHOUT APPROVAL. NOTICE OF VIOLATION HAS BEEN ISSUED. 3/27/06 MET W/ JOHN IVEY ON-SITE TO DISCUSS REQUIREMENTS FOR APPROVAL. NO INSPECTION REQUEST + NO APPROVAL OF RECORD
Water Service Inspection - Commercial Request Complete 3/23/2006 3/27/2006 03/27/2006
Occupancy Inspection - Codes Commercial Not Ready 05/05/2006
Correction
Corrective Action Required
05/05/2006
OCCUPANCY APPROVAL STATUS NO RECORD OF FINAL INSPECTION REQUESTED OR PERFORMED ON SHELL BUILDING OR OFFICE AREA. NOTICE OF VIOLATION HAS BEEN ISSUED THIS DATE. ARENA AREA IN USE WITHOUT APPROVAL
Correction
Corrective Action Required
05/05/2006
Receive Fire Department approval
Water Service Inspection Not Ready 05/09/2006
Correction
Corrective Action Required
05/09/2006
STATUS OF SERVICE INSTALLATION APPROVAL SERVICE LINE WAS INSTALLED AND COVERED WITHOUT APPROVAL. NOTICE OF VIOLATION HAS BEEN ISSUED. 3/27/06 MET W/ JOHN IVEY ON-SITE TO DISCUSS REQUIREMENTS FOR APPROVAL. NO INSPECTION REQUEST + NO APPROVAL OF RECORD
Occupancy Inspection - Codes Commercial Failed 05/09/2006
Correction
Corrective Action Required
05/09/2006
OCCUPANCY APPROVAL STATUS SEE PERMIT B0501070
Correction
Corrective Action Required
05/09/2006
Receive Fire Department approval SEE PERMIT B0501070
Correction
Corrective Action Required
05/09/2006
Receive Water Utilities Approval SEE PERMIT B0501070
Final Inspection - Commercial Failed 05/09/2006
Correction
Partial Correction
05/09/2006
TEMPORARY USE AUTHORIZATION STATUS SEE PERMIT B0501070
Occupancy Inspection - Codes Commercial Failed 05/11/2006
Correction
Resolved
05/11/2006
Receive Fire Department approval PER J DIR 5/10/06
Occupancy Inspection - Codes Commercial Failed 05/18/2006
Final Inspection - Commercial Failed 05/18/2006
Correction
Corrective Action Required
05/18/2006
TEMPORARY USE AUTHORIZATION STATUS SEE PERMIT B0501070
Occupancy Inspection - Codes Commercial Passed 05/30/2006
Correction
Resolved
05/30/2006
OCCUPANCY APPROVAL STATUS
Correction
Resolved
05/30/2006
Receive Water Utilities Approval PER BEN HASKAMP 5/26/06
Final Inspection - Commercial Passed 05/30/2006
Correction
Resolved
05/30/2006
TEMPORARY USE AUTHORIZATION STATUS
Correction
Resolved
05/30/2006
CLOSE PERMIT IN CONJUCTION WITH FINISH PERMIT B0501070
Water Service Inspection Passed 05/31/2006
Correction
Resolved
05/31/2006
STATUS OF SERVICE INSTALLATION APPROVAL
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.