Permit Application Status

B0300171


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0300171
Building Permit - Commercial
Final Completion
REORGANIZED SCHOOL DIST NO 7
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB,RETAINING WALL
02/06/2003
02/07/2003
08/06/2003
08/27/2004
Locations
Contacts
JE DUNN CONSTRUCTION CO., Address:929 HOLMES  
DLR GROUP, Address:7421 W. 129 STREET, SUITE 100  
REORGANIZED SCHOOL DIST NO 7, Address:301 NE Tudor Rd, Phone:(816) 986-1000  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/05/2003 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - 2000 IBC 1704.1.2 - Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and the registered design professional in responsible charge prior to the completion of that phase of the work. A final report of inspections documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted periodically at a frequency agreed upon by the permit applicant and the building official prior to the start of work.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $10,802.00 $10,802.00 Paid 02/07/2003
24 BLDG Plan Check Fees $200.00 $200.00 Paid 02/07/2003
25 Electrical Permit Fee $15.00 $15.00 Paid 02/07/2003
25 Plumbing Permit Fees $18.00 $18.00 Paid 02/07/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 03/27/2003
Correction
Partial Correction
03/27/2003
PARTIAL U.G. CONDUIT INSTALLATION OK TO COVER FOUR 4" PVC SCH 40 FOR ELECT PRIMARY FOUR 24" PVC SCH 40 FOR TELEPHONE & FIBER OPTIC CABLE FROM U.G. VAULT NEAR WARD TO QUASIBOX LOC 430' WEST
Underground Electrical Inspection - Commercial Partial 03/31/2003
Correction
Partial Correction
03/31/2003
None 4 - 4" conduit for s. mains from s. property line to second pull box approved.
Underground Electrical Inspection - Commercial Partial 04/03/2003
Correction
Resolved
04/03/2003
PARTIAL U.G. CONDUIT INSTALLATION OK TO COVER FOUR 4" PVC SCH 40 FOR ELECT PRIMARY FOUR 24" PVC SCH 40 FOR TELEPHONE & FIBER OPTIC CABLE FROM U.G. VAULT NEAR WARD TO QUASIBOX LOC 430' WEST
Correction
Resolved
04/03/2003
None 4 - 4" conduit for s. mains from s. property line to second pull box approved.
Correction
Partial Correction
04/03/2003
PARTIAL U.G. CONDUIT INSTALLATION FROM VAULT @ N=56769.86; E=48679.99 TO REVISED VAULT LOCATION @ N=56851.13; E=48644.96 THEN NORTH TO TRANSFORMER LOCATION @ N=57001.89; E=48640.28 FOUR 4" PVC + #2 BARE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 04/04/2003
Correction
Resolved
04/04/2003
PARTIAL U.G. CONDUIT INSTALLATION FROM VAULT @ N=56769.86; E=48679.99 TO REVISED VAULT LOCATION @ N=56851.13; E=48644.96 THEN NORTH TO TRANSFORMER LOCATION @ N=57001.89; E=48640.28 FOUR 4" PVC + #2 BARE OK TO COVER WHEN READY
Correction
Partial Correction
04/04/2003
PARTIAL U.G. CONDUIT INSTALLATION FROM N=56610.41 E=48808.31 TO N=56691.45 E=48790.58 TO N=56888.72 E=46684.30 OK TO COVER WHEN READY FOUR 2" SCH 40 PVC CATV, PHONE, FIBER OPTIC
Underground Electrical Inspection - Commercial Partial 04/11/2003
Correction
Partial Correction
04/11/2003
None PARTIAL U G CONDUIT OK TO COVER FROM VAULT N56610.54 E48751.11 TO N56624.73 E48394.51. PRIMARY EL.- 354 FT.-4-4 IN. TEL.-1-2IN. FIBER-2-2IN.
Underslab Plumbing Inspection - Commercial Passed 04/16/2003
Correction
Resolved
04/16/2003
None AREA A BSMT. GROUND ROUGH OK TO COVER.
Underground Electrical Inspection - Commercial Partial 04/22/2003
Correction
Partial Correction
04/22/2003
None APPROVED 2" POWER PVC CONDUIT TO PRACTICE FIELD APPROVED INNER-CONNECT FROM BUILDING I TO MAIN BUILDING
Underslab Plumbing Inspection - Commercial Partial 04/25/2003
Correction
Partial Correction
04/25/2003
None AREA A BSMT. GROUND ROUGH OK TO COVER.
Correction
Partial Correction
04/25/2003
None G-CORRIDOR G112 APPROX 180 FT 4/6 IN PVC FROM GA TO GI OK TO COVER
Underground Electrical Inspection - Commercial Partial 04/29/2003
Correction
Partial Correction
04/29/2003
None SHEET EEP3 14 4" PVC TRANSFORMER TO MAIN BUILDING APPROVED
Underground Electrical Inspection - Commercial Partial 05/02/2003
Correction
Partial Correction
05/02/2003
None FOUR 4" THREE 3" FROM: N=56634.73 E=48394.51 TO: N=56678.07 E=48231.10
Correction
Partial Correction
05/02/2003
None FROM MAIN RISOR TO OUTSIDE AREA F NORTH BUILDING LINE. TWO 4" PVC FEEDERS FOR PPIAI & PPP2A
Underground Electrical Inspection - Commercial Partial 05/06/2003
Correction
Partial Correction
05/06/2003
None FEED CONDUITS FROM RISOR TO AREA C, D, E PP2C (ONE 4" ONE 1") PP2D (TWO 3") PP2E (ONE 3" ONE 1")
Underslab Plumbing Inspection - Commercial Partial 05/07/2003
Correction
Partial Correction
05/07/2003
None G107 AND G103 GROUND ROUGH PLUMBING OKAY TO COVER
Underslab Electrical Inspection - Commercial Partial 05/09/2003
Correction
Partial Correction
05/09/2003
None LOWER AREA A APPROVED OKAY TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 05/09/2003
Correction
Partial Correction
05/09/2003
None UPPER AREA A APPROVED 2 4" CONDUIT 1 1/4" TEMP.
Underslab Plumbing Inspection - Commercial Partial 05/15/2003
Correction
Partial Correction
05/15/2003
None UPPER AREA F. 6" PVC -THROUGH VOCAL MUSIC ROOM -HALLWAY RUNNING NORTH/SOUTH, VOCAL MUSIC ROOM THROUGH VESTBULE. OKAY TO COVER
Correction
Partial Correction
05/15/2003
None LOWER AREA G. G111. 4" PVC OKAY TO COVER
Underground Electrical Inspection - Commercial Partial 05/19/2003
Correction
Partial Correction
05/19/2003
None N=56678.07 E=48231.10 TO N=56640.89 E=47890.91. OKAY TO COVER.
Underslab Plumbing Inspection - Commercial Partial 05/22/2003
Correction
Partial Correction
05/22/2003
AREA F EAST SECTION. KITCHEN AND CORRIDOR AREA OKAY TO COVER.
Underslab Plumbing Inspection - Commercial Partial 05/23/2003
Correction
Partial Correction
05/23/2003
None LOWER AREA G. 6" PVC TO 4" RUNNING E/W APPROVED. W. COACH LOCKERS NORTH OF 6" APPROVED. PARTIAL MENS COACH LOCKER N OF 6".
Underground Electrical Inspection - Commercial Partial 05/28/2003
Correction
Partial Correction
05/28/2003
PARKING LOT/ NORTH DRIVE NORTH DRIVE AND WEST PARKING LOT PARTIAL APPROVAL. UG CONDUIT FOR LIGHT POLES.
Underground Electrical Inspection - Commercial Partial 05/30/2003
Correction
Partial Correction
05/30/2003
PARKING LOT/ NORTH DRIVE NORTH DRIVE AND WEST PARKING LOT PARTIAL APPROVAL. UG CONDUIT FOR LIGHT POLES. SOUTH ENTRANCE, FIRST CROSSING ACROSS TEMP. ENTRANCE APPROVED. SECOND CROSSING INCOMPLETE. END OF SECOND CROSSING TO WEST PARKING LOT APPROVED.
Underslab Plumbing Inspection - Commercial Partial 06/02/2003
Correction
Partial Correction
06/02/2003
AREA F EAST SECTION. KITCHEN AND CORRIDOR AREA OKAY TO COVER. INTERIOR SECTION OF AREA F APPROVED.
Correction
Partial Correction
06/02/2003
None LOWER AREA G. 6" PVC TO 4" RUNNING E/W APPROVED. W. COACH LOCKERS NORTH OF 6" APPROVED. MENS COACH LOCKER N OF 6". AREA SOUTH OF W. COACH LOCKER APPROVED.
Underslab Plumbing Inspection - Commercial Partial 06/03/2003
Correction
Partial Correction
06/03/2003
None LOWER AREA G. 6" PVC TO 4" RUNNING E/W APPROVED. W. COACH LOCKERS NORTH OF 6" APPROVED. MENS COACH LOCKER N OF 6". SHOWERS SOUTH OF W. COACH LOCKER APPROVED. SHOWERS SOUTH OF MENS COACH LOCKER.
Correction
Partial Correction
06/03/2003
AREA B MAIN 6" PVC ALONG EAST SIDE APPROVED.
Underground Electrical Inspection - Commercial Partial 06/05/2003
Correction
Partial Correction
06/05/2003
PARKING LOT/ NORTH DRIVE FROM NORTH DRIVE THROUGH TEMP STORAGE TRAILORS INCOMPLETE. SECTION OF OUTER LINE ON WEST SECTION INCOMPLETE. SECTION FROM SOUTH ENTRANCE TO SW SECTION INCOMPLETE.
Underslab Plumbing Inspection - Commercial Partial 06/06/2003
Correction
Resolved
06/06/2003
None AREA A BSMT. GROUND ROUGH OK TO COVER.
Correction
Resolved
06/06/2003
None
Correction
Resolved
06/06/2003
None
Correction
Resolved
06/06/2003
None UPPER AREA F. 6" PVC -THROUGH VOCAL MUSIC ROOM -HALLWAY RUNNING NORTH/SOUTH, VOCAL MUSIC ROOM THROUGH VESTBULE. OKAY TO COVER
Correction
Resolved
06/06/2003
None
Correction
Partial Correction
06/06/2003
AREA F EAST SECTION. KITCHEN AND CORRIDOR AREA OKAY TO COVER. INTERIOR SECTION OF AREA F APPROVED.
Correction
Partial Correction
06/06/2003
None
Correction
Partial Correction
06/06/2003
AREA B MAIN 6" PVC ALONG EAST SIDE APPROVED.
Underslab Electrical Inspection - Commercial Partial 06/06/2003
Correction
Partial Correction
06/06/2003
LOWER AREA G MENS / WOMENS COACH LOCKER ROOMS AND SHOWER AREAS APPROVED.
Underslab Plumbing Inspection - Commercial Partial 06/10/2003
Correction
Partial Correction
06/10/2003
AREA C MAIN 6" PVC TRUNK FROM AREA B INTO AREA C APPROVED.
Underground Electrical Inspection - Commercial Partial 06/10/2003
Correction
Partial Correction
06/10/2003
PARKING LOT/ NORTH DRIVE FROM NORTH DRIVE THROUGH TEMP STORAGE TRAILORS APPROVED. TWO SECTIONS OF OUTER LINE ON WEST AND NW SECTIONS INCOMPLETE. SECTION FROM SOUTH ENTRANCE TO SW SECTION APPROVED.
Underground Electrical Inspection - Commercial Partial 06/12/2003
Correction
Partial Correction
06/12/2003
STADIUM AREA UG CONDUIT FOR ELECTRIC. AROUND FOOTBALL TO BLEACHER BUILDING. EAST BETWEEN BASEBALL AND SOFTBALL. NORTH FOR SCOREBOARDS.
Underground Electrical Inspection - Commercial Partial 06/16/2003
Correction
Partial Correction
06/16/2003
STADIUM AREA UG CONDUIT FOR ELECTRIC. AROUND FOOTBALL TO BLEACHER BUILDING. EAST BETWEEN BASEBALL AND SOFTBALL. NORTH AND SOUTH BETWEEN BASEBALL / SOFTBALL FOR SCOREBOARDS.
Underslab Plumbing Inspection - Commercial Partial 06/16/2003
Correction
Partial Correction
06/16/2003
LOWER AREA G LOCKER ROOMS APP. THROUGH 3" PVC FEEDING WATER FOUNTAINS PART. APP.
Underslab Plumbing Inspection - Commercial Partial 06/17/2003
Correction
Partial Correction
06/17/2003
AREA B MAIN 6" PVC ALONG EAST SIDE APPROVED. TOILET SECTION ALONG E WALL APP. STILL NEED TO SEE COMPLETED ACID WASTE LINE.
Correction
Partial Correction
06/17/2003
AREA C MAIN 6" PVC TRUNK FROM AREA B INTO AREA C APPROVED. ACID WASTE LINE APPROVED BESIDES TWO STUBS NEAR AREA B/C INTERSECTION.
Underslab Electrical Inspection - Commercial Partial 06/19/2003
Correction
Partial Correction
06/19/2003
1st FLOOR CONDUIT FOR SUSPENDED SLAB APPROVED. ABOVE CORRIDOR
Underslab Electrical Inspection - Commercial Partial 06/24/2003
Correction
Partial Correction
06/24/2003
LOWER AREA G MENS / WOMENS COACH LOCKER ROOMS AND SHOWER AREAS APPROVED. OUTLETS WEST OF LOCKER ROOM AREA APPROVED.
Underslab Plumbing Inspection - Commercial Partial 06/24/2003
Correction
Partial Correction
06/24/2003
LOWER AREA G LOCKER ROOMS APP. THROUGH 3" PVC FEEDING WATER FOUNTAINS APPROVED.
Underground Electrical Inspection - Commercial Partial 06/25/2003
Correction
Partial Correction
06/25/2003
STADIUM AREA UG CONDUIT FOR ELECTRIC. AROUND FOOTBALL TO BLEACHER BUILDING. EAST BETWEEN BASEBALL AND SOFTBALL. NORTH AND SOUTH BETWEEN BASEBALL / SOFTBALL FOR SCOREBOARDS. NORTH/ SOUTH NEXT TO SOCCER APP.
Underslab Plumbing Inspection - Commercial Partial 06/25/2003
Correction
Partial Correction
06/25/2003
AREA B MAIN 6" PVC ALONG EAST SIDE APPROVED. TOILET SECTION ALONG E WALL APP. ACID WASTE WATER PRESSURE TESTED, APPROVED
Underground Electrical Inspection - Commercial Partial 06/27/2003
Correction
Partial Correction
06/27/2003
STADIUM AREA UG CONDUIT FOR ELECTRIC. AROUND FOOTBALL TO BLEACHER BUILDING. EAST BETWEEN BASEBALL AND SOFTBALL. NORTH AND SOUTH BETWEEN BASEBALL / SOFTBALL FOR SCOREBOARDS. NORTH/ SOUTH NEXT TO SOCCER APP.
Correction
Partial Correction
06/27/2003
PRIMARY APPROVED TO N= 56666.34 E= 47414.47 SOUTH RETAINING WALL
Correction
Partial Correction
06/27/2003
STADIUM AREA CONTINUED WEST SCOREBOARD SOCCER STADIUM APPROVED. LIGHTING FOR EADT SIDE OF FOOTBALL STADIUM APPROVED.
Underslab Electrical Inspection - Commercial Partial 07/02/2003
Correction
Partial Correction
07/02/2003
AREA B AREA B UNDERSLAB ELECTRIC APPROVED.
Underslab Plumbing Inspection - Commercial Partial 07/02/2003
Correction
Partial Correction
07/02/2003
AREA C MAIN 6" PVC TRUNK FROM AREA B INTO AREA C APPROVED. ACID WASTE LINE APPROVED BESIDES TWO STUBS NEAR AREA B/C INTERSECTION. OKAY TO GRAVEL. WATER TEST PARTIAAL APP.
Correction
Partial Correction
07/02/2003
AREA D 4" PVC ALONG OUTER WALL APPROVED INTO AREA E.
Correction
Partial Correction
07/02/2003
UPPER AREA A ACID WASTE PIPE OKAY TO GRAVEL. WATER TEST PENDING POUR CONCRETE
Underground Electrical Inspection - Commercial Partial 07/02/2003
Correction
Partial Correction
07/02/2003
PRIMARY APPROVED TO SECONDARIE, N=56811.36 E=47341.39 SOUTH RETAINING WALL
Underslab Plumbing Inspection - Commercial Partial 07/03/2003
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
AREA F
Correction
Resolved
07/03/2003
None
Correction
Partial Correction
07/03/2003
AREA B
Correction
Partial Correction
07/03/2003
AREA C
Correction
Resolved
07/03/2003
LOWER AREA G
Correction
Partial Correction
07/03/2003
AREA D
Correction
Partial Correction
07/03/2003
UPPER AREA A
Underslab Electrical Inspection - Commercial Partial 07/03/2003
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
LOWER AREA G
Correction
Partial Correction
07/03/2003
1st FLOOR ABOVE CORRIDOR
Correction
Partial Correction
07/03/2003
AREA B
Underground Electrical Inspection - Commercial Partial 07/03/2003
Correction
Resolved
07/03/2003
PARTIAL U.G. CONDUIT INSTALLATION OK TO COVER FOUR 4" PVC SCH 40 FOR ELECT PRIMARY FOUR 24" PVC SCH 40 FOR TELEPHONE & FIBER OPTIC CABLE FROM U.G. VAULT NEAR WARD To Football Building
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
PARTIAL U.G. CONDUIT INSTALLATION FOUR 4" PVC + #2 BARE OK TO COVER WHEN READY
Correction
Resolved
07/03/2003
PARTIAL U.G. CONDUIT INSTALLATION
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
None Transformer to Main Build
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
None
Correction
Resolved
07/03/2003
None Upper Area A 2 4" Conduit, 1 1/4" Temp
Correction
Resolved
07/03/2003
None
Correction
Partial Correction
07/03/2003
PARKING LOT/ NORTH DRIVE
Correction
Partial Correction
07/03/2003
STADIUM AREA
Correction
Resolved
07/03/2003
PRIMARY SOUTH RETAINING WALL To Football Building
Correction
Partial Correction
07/03/2003
STADIUM AREA CONTINUED
Underslab Plumbing Inspection - Commercial Partial 07/08/2003
Correction
Partial Correction
07/08/2003
AREA B ACID WASTE WATER TESTED AND APPROVED. OKAY TO COVER.
Correction
Partial Correction
07/08/2003
AREA C ACID WASTE WATER TESTED, APPROVED. OKAY TO COVER.
Correction
Partial Correction
07/08/2003
UPPER AREA A ACID WASTE PIPE WATER TESTED, APPROVED. OKAY TO COVER.
Underslab Electrical Inspection - Commercial Partial 07/08/2003
Correction
Resolved
07/08/2003
1st FLOOR AREA A UNDERSLAB CONDUIT FOR ELECTRICAL APPROVED. APPROVED CONDUIT IN SUSPENDED SLAB. OKAY TO COVER WHEN READY.
Underslab Electrical Inspection - Commercial Partial 07/10/2003
Correction
Resolved
07/10/2003
AREA C
Underslab Plumbing Inspection - Commercial Partial 07/11/2003
Correction
Resolved
07/11/2003
AREA F SW CORNER AREA F APPROVED.
Underslab Electrical Inspection - Commercial Partial 07/16/2003
Correction
Partial Correction
07/16/2003
AREA F
Underslab Plumbing Inspection - Commercial Partial 07/16/2003
Correction
Resolved
07/16/2003
AREA F SW CORNER AREA F APPROVED. PRESSURE TEST APP.
Underground Electrical Inspection - Commercial Partial 07/16/2003
Correction
Partial Correction
07/16/2003
STADIUM AREA CONTINUED SEC.RUNNING THROUGH MAIN STADIUM BUILDING APP.
Underslab Electrical Inspection - Commercial Partial 07/18/2003
Correction
Partial Correction
07/18/2003
AREA F AUDITORIUM AREA AND VOCAL MUSIC ROOMS APPROVED. OKAY TO COVER WHEN READY.
Underslab Electrical Inspection - Commercial Partial 07/23/2003
Correction
Partial Correction
07/23/2003
AREA B
Correction
Resolved
07/23/2003
1st FLOOR AREA A
Correction
Partial Correction
07/23/2003
AREA F KITCHEN AREA APPROVED
Underslab Plumbing Inspection - Commercial Passed 08/06/2003
Correction
Resolved
08/06/2003
AREA B
Correction
Resolved
08/06/2003
AREA C
Correction
Resolved
08/06/2003
AREA D
Correction
Resolved
08/06/2003
UPPER AREA A
Correction
Resolved
08/06/2003
AREA D, E UNDERSLAB APPROVED
Underslab Electrical Inspection - Commercial Passed 08/06/2003
Correction
Resolved
08/06/2003
1st FLOOR ABOVE CORRIDOR
Correction
Resolved
08/06/2003
AREA B
Correction
Resolved
08/06/2003
AREA F
Correction
Resolved
08/06/2003
AREA D CONDUIT FOR ELEC. AREA D UNNDERSLAB APP.
Underslab Electrical Inspection - Commercial Passed 08/07/2003
Correction
Resolved
08/07/2003
AREA H, F OKAY TO COVER WHEN READY.
Underslab Electrical Inspection - Commercial Passed 08/18/2003
Correction
Resolved
08/18/2003
PART AREA D, AREA E PARTIAL APPROVAL. COVERED WITHOUT INSPECTION.
Underslab Plumbing Inspection - Commercial Passed 08/21/2003
Correction
Resolved
08/21/2003
AREA I AREA I UNDERSLAB PLUMBING APPROVED
Underslab Electrical Inspection - Commercial Passed 08/26/2003
Correction
Resolved
08/26/2003
AREA I AREA I APPROVED. OKAY TO COVER WHEN READY.
Underslab Electrical Inspection - Commercial Passed 09/03/2003
Correction
Resolved
09/03/2003
AUX. GYMS APPROVED
Underslab Electrical Inspection - Commercial Passed 09/05/2003
Correction
Resolved
09/05/2003
AREA F
Correction
Resolved
09/05/2003
AREA D
Correction
Resolved
09/05/2003
AREA H, F
Correction
Resolved
09/05/2003
PART AREA D, AREA E
Correction
Resolved
09/05/2003
AREA I
Correction
Resolved
09/05/2003
AUX. GYMS
Correction
Resolved
09/05/2003
AREA E & KITCHEN AREA APPROVED
Underslab Electrical Inspection - Commercial Passed 09/19/2003
Correction
Resolved
09/19/2003
AUX. GYMS AREA BETWEEN AUX. GYMS AND MAIN GYM APPROVED. 1ST FLOOR AREA I APPROVED. AREA SOUTH OF KITCHEN APPROVED.
Underslab Electrical Inspection - Commercial Passed 09/23/2003
Correction
Resolved
09/23/2003
AREA H, F CONDUIT FOR UNDERSLAB ELECTRICAL APPROVED AUDITORIUM SEATING AREA
Underground Electrical Inspection - Commercial Partial 09/24/2003
Correction
Partial Correction
09/24/2003
PARKING LOT/ NORTH DRIVE UG CONDUIT FOR PARKING LOT LIGHTING APPROVED FROM LOWER A AROUND TO APPROX. AREA C.
Correction
Resolved
09/24/2003
STADIUM AREA
Correction
Resolved
09/24/2003
STADIUM AREA CONTINUED
Underground Electrical Inspection - Commercial Request Complete 9/23/2003 9/24/2003 09/24/2003
Underground Electrical Inspection - Commercial Passed 09/25/2003
Correction
Resolved
09/25/2003
PARTIAL U.G. CONDUIT INSTALLATION OK TO COVER FROM U.G. VAULT NEAR WARD To Football Building
Correction
Resolved
09/25/2003
PARKING LOT/ NORTH DRIVE UG ELEC. FOR PARKING LOT LIGHTING APPROVED.
Underground Electrical Inspection - Commercial Request Complete 9/23/2003 9/25/2003 09/25/2003
Underslab Electrical Inspection - Commercial Passed 10/29/2003
Correction
Resolved
10/29/2003
AREA D
Correction
Resolved
10/29/2003
AREA H, F AUDITORIUM SEATING AREA
Correction
Resolved
10/29/2003
PART AREA D, AREA E
Correction
Resolved
10/29/2003
AREA I
Correction
Resolved
10/29/2003
AUX. GYMS
Correction
Resolved
10/29/2003
AREA E & KITCHEN AREA
Correction
Resolved
10/29/2003
MAIN GYM APPROVED
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home