Permit Application Status

B0201935


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0201935
Building Permit - Commercial
Final Completion
OCTOBER SKY DEVELOPERS LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB
10/31/2002
11/01/2002
04/30/2003
06/25/2003
Locations
Contacts
HEARTLAND STUCCO, Address:5112 SW PIPING PLOVER DR  
CHAPMAN ARCHITECTS, Address:2412 W 71ST STREET  
OCTOBER SKY DEVELOPERS LLC, Address:PO BOX 2372  
CFC SQUARED LLC, Address:1314 SW MARKET ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/29/2003 10/29/2010
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA- The holder of a partial permit shall proceed without assurance that the permit for the entire building or structure will be granted.
Correction

CA - The holder of this permit agrees and understands that only persons authorized per LSCO 7-130 are permitted to perform electrical, plumbing or mechanical work authorized by this permit.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $47.00 $47.00 Paid 11/01/2002
24 BLDG Plan Check Fees $5.75 $5.75 Paid 11/01/2002
25 Plumbing Permit Fees $15.00 $15.00 Paid 11/01/2002
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 11/13/2002
Underslab Plumbing Inspection - Commercial Passed 11/26/2002
Correction
Resolved
11/26/2002
UNDER-FLOOR DWV PIPING PER PERMIT PRINT SET SHEET M-1 EXCAVATED; LAID; JOINED SLOPED TO DRAIN
Footing Inspection - Commercial Passed 12/06/2002
Correction
Resolved
12/06/2002
None APPROVED PENDING RECEIPT OF ENGINEERS DRAWING - POUR AT OWN RISK. 24" W x 8" D. 8" W X 12" D CENTER OF FOOTING. 3 ROWS #4 REBAR W/ CROSS REBAR 3` OC. TRASH ENCLOSURE MATCHES.
Final Inspection - Commercial Passed 06/24/2003
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home