Summary
B0201164
Building Permit - Commercial
Certificate of Occupancy
LBC INVESTMENTS LLC
NEW TENANT FINISH
TENANT FINISH AND ROOM ADDITION
07/10/2002
07/24/2002
01/20/2003
07/21/2003
Locations
Contacts
HIRST AND ASSOCIATES, Address:621 NE WOODS CHAPEL RD  
LITTLE DIXIE CONSTRUCTION, Address:3316 LEMONE ST.  
INSIGHT GROUP, Address:1200 S OUTER ROAD SUITE 501  
LBC INVESTMENTS LLC, Address:PO BOX 7258  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/06/2003 10/29/2010
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

Fire Department; Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor cove-ings, nor shall such cords be subject to environmental damage or physical impact.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department; Dumpsters and containers with an individual capacity of 1.5 cubic yards (40.5 cubic feet) or more shall not be stored in buildings or placed within 5 feet of combustible walls, openings or combustible roof eave lines.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Fire Department- The high pile or rack storage of combustible materials shall be in accordance with IFC Chapter 23. Although it may not apply to this tenant space, the smoke removal system for the building has been affected for the adjacent space and will need to be corrected if the space is to be used for storage.
Correction

Fire Department- How is the room on the mezzanine accessed?
Correction

P & D - All exterior mechanical equipment, whether roof mounted or ground mounted, shall be screened from view from off the property. The appearance of screens shall be coordinated with the building to maintain a unified appearance.
Correction

Fire Department- A completed Hazardous Materials Permit Application shall be provided indicating all materials stored on site including propane. Propane shallbe stored in an approved cage on the outside of the building in accordance with IFC Chapter 38.
Correction

Fire Department- The storage of welding gas cylinders shall be in accordance with IFC Chapter 27 and 30 and provided for as part of the tenant finish.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be se-lected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department: Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective.
Correction

Fire Department-1004.2.3 Egress through intervening spaces. Egress from a room or space shall not pass through adjoining or intervening rooms or areas, except where such adjoining rooms or areas are accessory to the area served; are not a high-hazard occupancy; and provide a discernible path of egress travel to an exit. Egress shall not pass through kitchens, store rooms, closets or spaces used for similar purposes. An exit access shall not pass though a room which can be locked to prevent egress. Means of egress from dwelling units, or sleeping areas shall not lead through other sleeping areas, toilet rooms or bathrooms. Exceptions: 1. Means of egress are not prohibited through a kitchen area serving adjoining rooms constituting part of the same dwelling unit or guestroom. 2. Means of egress are not prohibited through rooms or spaces in a high-hazard occupancy where such rooms or spaces are the same occupancy group. Remove the exit signs leading to from the office to the fabrication area.
Correction

CA - Details on the reinforcement of the foundation are not on the plans.
Correction

CA - The structural steel drawings for the mezzanine where not provided at the time of permit application.
Correction

CA - The plans do not provide details on the ladder providing access to the mezzanine.
Correction

CA - The plans indicate that standard plywood will be used on the mezzanine.
Correction

CA - The office area is only required to have one exit from the space. Section 1004.2.3 does not allow for exiting through an intervening room which does not provide a discernible path of egress.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

CA - 2000 IPC 504.3 - A means of disconnecting an electric hot water supply system from its energy supply shall be provided in accordance with the 1999 National Electric Code. A seperate valve shall be provided to shut off the energy fuel supply to all other types of hot water supply systems.
Correction

CA - 2000 IPC 312.1 - Required tests. The permit holder shall make the applicable test prescribed in Sections 312.2 through 312.9 to determine compliance with the provisions of this code. The permit holder shall give reasonable advance notice to the code official when the plumbing work is ready for tests. The equipment, material, power and labor necessary for the inspection and test shall be furnished by the permit holder and the permit holder shall be responsible for determining that the work will withstand the test pressure prescribed in the following tests. All plumbing system piping shall be tested with either water or air. After the plumbing fixtures have been set and their traps filled with water, the entire drainage system shall be submitted to final tests. The code official shall require the removal of any cleanouts if necessary to ascertain if the pressure has reached all parts of the system. Note: Testing of the plumbing system is not required to be witnessed by the Codes Administration Staff with the exception of gas piping.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Backflow prevention assembly will be placed inside the building on the domestic water service line prior to any point of use.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $602.00 $602.00 Paid 07/24/2002
24 BLDG Plan Check Fees $30.00 $30.00 Paid 07/24/2002
25 Electrical Permit Fee $60.00 $60.00 Paid 07/24/2002
25 Mechanical Permit Fees $68.50 $68.50 Paid 07/24/2002
25 Plumbing Permit Fees $93.00 $93.00 Paid 07/24/2002
89 Sewer Tap Fees $600.00 $600.00 Paid 07/24/2002
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 08/13/2002
All Rough Inspection - Commercial Partial 09/06/2002
Correction
Partial Correction
09/06/2002
IN WALL SYSTEMS APPROVED OK TO COVER
Gas Service Inspection - Commercial Passed 09/26/2002
Gas Piping Inspection - Commercial Passed 09/26/2002
All Rough Inspection - Commercial Partial 10/03/2002
Correction
Partial Correction
10/03/2002
ABOVE CEILING SYSTEM APPROVED
All Rough Inspection - Commercial Passed 10/24/2002
Correction
Resolved
10/24/2002
Above Ceiling Inspection Passed 10/24/2002
Occupancy Inspection - Codes Commercial Failed 10/24/2002
Correction
Corrective Action Required
10/24/2002
SEE TEXT COMPLETE OPEN WASTE WATER COOLERS MOP SINK SEAL PLUMBING FIXTURES INSTALL LAV GAURDS INSTALL ALL ADA SIGNAGE RESTROOMS PARKING POST ADDRESS
Correction
Corrective Action Required
10/24/2002
Receive Fire Department approval
Occupancy Inspection - Codes Commercial Passed 07/15/2003
Correction
Resolved
07/15/2003
Receive Fire Department approval
Correction
Resolved
07/15/2003
SEE TEXT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home