Permit Application Status

B0201125


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0201125
Building Permit - Commercial
Final Completion
ABUNDANT LIFE BAPTIST CHURCH OF LEES SUMMIT
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB
07/05/2002
07/10/2002
01/06/2003
06/04/2003
Locations
Contacts
HGK, Address:6532 BLUE RIDGE CUTOFF  
ABUNDANT LIFE BAPTIST CHURCH OF LEES SUMMIT, Address:414 SW PERSELS RD, Phone:(816) 554-8181  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/01/2003 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - Demolition permits must be pulled for the removal of the existing structures. Contact the Codes Administration Department if you have any questions.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $245.00 $245.00 Paid 07/10/2002
24 BLDG Plan Check Fees $18.10 $18.10 Paid 07/10/2002
25 Electrical Permit Fee $15.00 $15.00 Paid 07/10/2002
25 Plumbing Permit Fees $15.00 $15.00 Paid 07/10/2002
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Not Ready 07/15/2002
Correction
Corrective Action Required
07/15/2002
TYPE YOUR OWN TEXT CALL WHEN READY
Footing Inspection - Commercial Partial 07/16/2002
Correction
Partial Correction
07/16/2002
TYPE YOUR OWN TEXT FROM LINE J-1.2 TO LINE A-4.3, EXTERIOR PADS INCLUDED
Piers/Caissons Inspection - Commercial Failed 08/01/2002
Correction
Corrective Action Required
08/01/2002
REBAR PADS #`d ON CITY APPROVED SITE COPY OF PLANS (1-12). PADS#6,7,& 8 HAVE INCORRECT AMOUNT OF REBAR. TOP LAYER OF REBAR MAT OF EACH PAD TO BE IN PLACE & SECURED. DO NOT COVER CALL FOR REINSPECTION.
Piers/Caissons Inspection - Commercial Passed 08/02/2002
Correction
Resolved
08/02/2002
REBAR PADS INSIDE OF FOOTING
Footing Inspection - Commercial Partial 08/05/2002
Correction
Partial Correction
08/05/2002
TYPE YOUR OWN TEXT FROM LINE J-1.2 TO LINE A-4.3, EXTERIOR PADS INCLUDED FROM LINE G.2 TO LINE1.4
Underslab Electrical Inspection - Commercial Partial 08/05/2002
Correction
Partial Correction
08/05/2002
None 6 - 3" PVC FOR POWER & TELELPHONE AT ROOM 143. OKAY TO COVER
Footing Inspection - Commercial Partial 08/06/2002
Correction
Partial Correction
08/06/2002
TYPE YOUR OWN TEXT FROM LINE J-1.2 TO LINE A-4.3, EXTERIOR PADS INCLUDED FROM LINE G.2 TO LINE1.4 FROM LINE B.6 TO LINE 4.5 (FOR 6`8" WALL SECTION ONLY)
Footing Inspection - Commercial Partial 08/07/2002
Correction
Partial Correction
08/07/2002
TYPE YOUR OWN TEXT FROM LINE J-1.2 TO LINE A-4.3, EXTERIOR PADS INCLUDED FROM LINE G.2 TO LINE1.4 FROM LINE B.6 TO LINE 4.5 (FOR 6`8" WALL SECTION ONLY) FROM LINE B.6 TO EXISTING AT G.2
Footing Inspection - Commercial Partial 08/12/2002
Correction
Partial Correction
08/12/2002
PARTIAL STRIP FOOTING ALONG (5) FROM C.3 TO B.5 PER SECTION 7 ON S3.1
Underslab Plumbing Inspection - Commercial Failed 08/19/2002
Correction
Corrective Action Required
08/19/2002
COVERED UNCOVER FOR INSPECTION. NO INSPECTION DONE.
Footing Inspection - Commercial Partial 08/19/2002
Underslab Plumbing Inspection - Commercial Failed 08/21/2002
Correction
Corrective Action Required
08/21/2002
COVERED UNCOVER ALL FITTINGS FOR INSPECTION. ENSURE SUFFICENT HORIZONAL IS UNCOVERED, ON ALL RUNS TO DETERMINE SLOPE. CALL FOR REINSPECTIOM
Footing Inspection - Commercial Passed 08/22/2002
Correction
Resolved
08/22/2002
TYPE YOUR OWN TEXT FROM LINE J-1.2 TO LINE A-4.3, EXTERIOR PADS INCLUDED FROM LINE G.2 TO LINE1.4 FROM LINE B.6 TO LINE 4.5 (FOR 6`8" WALL SECTION ONLY) FROM LINE B.6 TO EXISTING AT G.2
Correction
Resolved
08/22/2002
PARTIAL STRIP FOOTING FOOTINGS APPROVED ALONG (5) FROM C.3 TO B.5 PER SECTION 7 ON S3.1
Underslab Plumbing Inspection - Commercial Partial 08/22/2002
Correction
Partial Correction
08/22/2002
COVERED NOT READY - RMS 124,126, 127, 128, 131, 132, 114, & 4" WASTE LINE RUNNING EAST/WEST FROM MIDDLE OF BLDG TO WEST SIDE.
Underslab Plumbing Inspection - Commercial Partial 08/23/2002
Correction
Partial Correction
08/23/2002
COVERED NOT READY - RMS 124,126, 127, 128, 131, 132, 114, & 4" WASTE LINE RUNNING EAST/WEST FROM MIDDLE OF BLDG TO WEST SIDE. 8-23-02 - PROVIDE A STABLE BEDDING THE ENTIRE LENGTH OF PIPE. DRAIN WATER FROM TRENCHES FOR INSPECTION
Underslab Plumbing Inspection - Commercial Passed 08/26/2002
Correction
Resolved
08/26/2002
COVERED OK TO COVER. NO AIR OR WATER TEST HAS BEEN DONE.
Underslab Electrical Inspection - Commercial Not Ready 09/11/2002
Correction
Corrective Action Required
09/11/2002
None COVERED UNABLE TO INSPECT
Underslab Electrical Inspection - Commercial Passed 09/12/2002
Correction
Resolved
09/12/2002
None
Underslab Plumbing Inspection - Commercial Partial 09/12/2002
Correction
Partial Correction
09/12/2002
COVERED NO AIR OR WATER TEST COMPLETED
Above Ceiling Inspection Partial 05/13/2003
Correction
Partial Correction
05/13/2003
None EAST ENTRY / HALLWAY / BATHROOMS APPROVED. OKAY TO DROP TILE WHEN READY. ROOM NW OF GYM OKAY TO DROP WHEN READY. KITCHEN- REMOVE TEMP. ELECTRIC AND COMPLETE DUCT WORK. DO NOT DROP TILE.
Above Ceiling Inspection Partial 05/15/2003
Correction
Partial Correction
05/15/2003
None EAST ENTRY / HALLWAY / BATHROOMS APPROVED. OKAY TO DROP TILE WHEN READY. ROOM NW OF GYM OKAY TO DROP WHEN READY. KITCHEN- OKAY TO DROP
Above Ceiling Inspection Partial 05/16/2003
Correction
Partial Correction
05/16/2003
None KITCHEN AREA, HALLWAY EAST OF KITCHEN, MAIN ROOM WEST OF ENTRANCE, EAST AREA HALLWAY AND CLASSROOMS, OKAY TO DROP. LEAVE MOP ROOM WEST OF KICHEN, NORTH CENTRAL CLASSROOOM, AND NORTH PART OF CLASSROOM HALLWAYS EXPOSED.
Above Ceiling Inspection Partial 05/19/2003
Correction
Partial Correction
05/19/2003
None JANITOR CLOSET AND CONFERENCE ROOM OKAY TO DROP.
Underslab Plumbing Inspection - Commercial Passed 06/03/2003
Correction
Resolved
06/03/2003
COVERED
Final Inspection - Commercial Passed 06/03/2003
Correction
Resolved
06/03/2003
NONE FINAL SPECIAL INSPECTIONS REPORT SUBMITTED.
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents