Permit Application Status

B0200559


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0200559
Building Permit - Commercial
Certificate of Occupancy
AFZALI MOJAN
NEW TENANT FINISH
TENANT FINISH
04/11/2002
05/09/2002
11/05/2002
07/30/2002
Locations
Contacts
KEITH WEHMEIR, Address:9714 SE KEYSTONE DR  
AFZALI MOJAN, Address:13002 WALMER ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/08/2002 10/29/2010
Correction

CA - ANSI A117.1-1998 404.2.7 - Door Hardware. Handles, pulls, latches, locks, and other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight grasping, pinching, or twisting of the wrist to operate. Such hardware shall be 34 inches minimum and 48 inches maximum above the floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides.
Correction

CA - Provide plumbing plans.
Correction

CA - The mechanical plans show fire dampers in the corridor which is not rated. These dampers are not required.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - 2000 IBC 1109.1 - Required accessible elements shall be identified by the International Symbol of Accessiblity at the locations listed in Section 1109.1. 1. Not applicable as the zoning ordinance is more restrictive. 2. Accessible passenger loading zones. 3. Accessible areas of refuge required by Section 1103.2.13.5. 4. Accessible rooms where multi single-user toilet or bathing rooms are clustered at a single location. 5. Accessible entrances where not all entrances are accessible. 6. Accessible check-out aisles where not all aisles are accessible. The sign, where provided, shall be above the check-out aisle in the same location as the check-out aisle number or type of check-out identification. 7. Unisex toilet and bathing rooms. 8. Accessible dressing, fitting, and locker rooms where not all such rooms are accessible.
Correction

CA - 2000 IBC 1209.2 - Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.
Correction

CA - 2000 IBC 1209.1 - In other than dwelling units, toilet and bathing room floors shall have a smooth, hard, nonabsorbent surface that extends upward onto the walls at least 6 inches.
Correction

CA - 2000 IBC 1108.4 - Where kitchen, kitchenettes and wet bars are provided in accessible spaces or rooms, they shall be accessible in accordance with ICC/ANSI A117.1.
Correction

Fire Department; IFC 1003.3.1.8 Egress doors shall be readily openable from the egress side without the use of akey or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Correction

1003.2.10.1 Fire Department- Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30 480 mm) from the nearest visible exit sign.
Correction

Fire Department; Egress from a room or space shall not pass through adjoining or interven-ing rooms or areas, except where such adjoining rooms or areas are accessory to the area served; are not a high-hazard occupancy; and provide a discernible path of egress travel to an exit. Egress shall not pass through kitchens, store rooms, closets or spaces used for similar purposes. An exit access shall not pass though a room which can be locked to prevent egress. IFC 1004.2.3
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

Fire Department; Combustible waste material creating a fire hazard shall not be allowed to accumulate in buildings or structures or upon premises. Combustible debris, waste materials and trash shall not be burned on site.
Correction

Fire Department; Dumpsters and containers with an individual capacity of 1.5 cubic yards (40.5 cubic feet) or more shall not be stored in buildings or placed within 5 feet of combustible walls, openings or combustible roof eave lines.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor cove-ings, nor shall such cords be subject to environmental damage or physical impact.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - 2000 IMC 602.2.1 - Except as required by Section 602.2.1.1 through 602.2.1.4, materials exposed within plenumbs shall be noncombustible or shall have a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E 84.
Correction

CA - 2000 IPC 403.2 - Where plumbing fixtures are required, separate facilities shall be provided for each sex.
Correction

CA - 2000 IPC 308.5 - Pipe shall be supported in accordance with Table 308.5.
Correction

CA - 2000 IPC 312.1 - Required tests. The permit holder shall make the applicable test prescribed in Sections 312.2 through 312.9 to determine compliance with the provisions of this code. The permit holder shall give reasonable advance notice to the code official when the plumbing work is ready for tests. The equipment, material, power and labor necessary for the inspection and test shall be furnished by the permit holder and the permit holder shall be responsible for determining that the work will withstand the test pressure prescribed in the following tests. All plumbing system piping shall be tested with either water or air. After the plumbing fixtures have been set and their traps filled with water, the entire drainage system shall be submitted to final tests. The code official shall require the removal of any cleanouts if necessary to ascertain if the pressure has reached all parts of the system. Note: Testing of the plumbing system is not required to be witnessed by the Codes Administration Staff with the exception of gas piping.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

A note should be provided indicating a Reduce Pressure Zone (RPZ) principal backflow prevention device will be placed inside the building on the domestic water service line prior to any point of use.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $128.00 $128.00 Paid 05/09/2002
24 BLDG Plan Check Fees $12.50 $12.50 Paid 05/09/2002
25 Electrical Permit Fee $60.00 $60.00 Paid 05/09/2002
25 Mechanical Permit Fees $75.00 $75.00 Paid 05/09/2002
25 Plumbing Permit Fees $21.00 $21.00 Paid 05/09/2002
89 Sewer Tap Fees $150.00 $150.00 Paid 05/09/2002
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Failed 04/29/2002
Correction
Corrective Action Required
04/29/2002
SEE TEXT NO PERMITS
All Rough Inspection - Commercial Passed 05/29/2002
Correction
Resolved
05/29/2002
None OKAY TO INSULATE OKAY TO SHEETROCK
Occupancy Inspection - Codes Commercial Failed 07/10/2002
Correction
Corrective Action Required
07/10/2002
Receive Fire Department approval PROVIDE PORTABLE FIRE EXTINGUISHERS SEAL OPEN ELECTRICAL SMOKE DETECTOR REQUIRED AT NE HALL CONVERGENCE
Correction
Corrective Action Required
07/10/2002
Receive Codes Administration approval CAP OPEN ELECTRICAL CAP OPEN WASTE BREAK ROOM COMPLETE RESTROOM PACKAGE INSTALL GRAB RAILS INSTALL ADA SIGNAGE SEAL FIXTURES TO WALL/FLOOR NO STORAGE IN MECH ROOM/ELEC ROOM
Occupancy Inspection - Codes Commercial Passed 07/25/2002
Correction
Resolved
07/25/2002
Receive Fire Department approval
Correction
Resolved
07/25/2002
Receive Codes Administration approval
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: