Summary
B0200179
Building Permit - Commercial
Voided
TUSTIN LLC
NEW COMMERCIAL
NONE
02/12/2002
02/15/2002
08/14/2002
03/01/2002
Locations
Contacts
TRACY DEISTER, Address:207 SW MARKET ST  
TUSTIN LLC, Address:10531 MISSION RD UNIT 305  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/11/2002 10/29/2010
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Failed 02/18/2002
Correction
Corrective Action Required
02/18/2002
Electrical Listing & Labeling (IRC) this is a test
Footing Inspection - Commercial Failed 02/18/2002
Foundation Inspection - Commercial Passed 02/18/2002
Correction
Resolved
02/18/2002
TYPE YOUR OWN TEXT this is a test
Underground Electrical Inspection - Commercial Passed 02/18/2002
Correction
Resolved
02/18/2002
TYPE YOUR OWN TEXT we need this text to print.
Foundation Inspection - Commercial Passed 02/18/2002
Correction
Resolved
02/18/2002
TYPE YOUR OWN TEXT this is a test
Foundation Inspection - Commercial Passed 02/18/2002
Correction
Resolved
02/18/2002
TYPE YOUR OWN TEXT this is a test
Rough Framing Inspection - Commercial Passed 02/19/2002
Correction
Resolved
02/19/2002
TYPE YOUR OWN TEXT this is a test
Piers/Caissons Inspection - Commercial Passed 02/20/2002
Foundation Inspection - Commercial Passed 02/20/2002
Piers/Caissons Inspection - Commercial Passed 02/20/2002
Miscellaneous Inspection Passed 02/20/2002
Footing Inspection - Commercial Failed 02/21/2002
Piers/Caissons Inspection - Commercial Failed 02/22/2002
Correction
Corrective Action Required
02/22/2002
Footing Reinforcement (IRC) PIRS REQUIRED TO BE A MINIMUM OF 36 INCHES DEEP
Footing Inspection - Commercial Failed 02/28/2002
Correction
Resolved
02/28/2002
Correction
Partial Correction
02/28/2002
Electrical Listing & Labeling (IRC) this is a test
Underslab Plumbing Inspection - Commercial Failed 03/11/2002
Correction
Corrective Action Required
03/11/2002
SUPPORT ENTIRE PIPING GRAVEL IN OR OTHERWISE SUPPORT PIPING. Basement
Piers/Caissons Inspection - Commercial Passed 04/04/2002
Correction
Resolved
04/04/2002
Footing Reinforcement (IRC) PIRS REQUIRED TO BE A MINIMUM OF 36 INCHES DEEP
All Rough Inspection - Commercial Failed 04/11/2002
Correction
Corrective Action Required
04/11/2002
Joist Framing (IRC) FLOOR OPENING HEADER JOISTS EXCEDING 4 FEET SHALL BE DOUBLED.ENDS OF BEAMS SHALL HAVE A MINIMUM BEARING OF THREE INCHES.JOIST HANGERS REQUIRED ON FLOOR JOISTS EXCEEDING 12 FEET.FLOOR JOIST OVERSPANNED IN {ROOM}Exhaust fan shall be installed in each bathr
Sewer Service Inspection Failed 05/06/2002
Correction
Corrective Action Required
05/06/2002
TYPE YOUR OWN TEXT support entire length of sewer line
Occupancy Inspection - Codes Commercial Passed 07/03/2002
Electrical Service Inspection Failed 05/20/2003
Correction
Corrective Action Required
05/20/2003
Service, Feeder and Grounding Electrode Conductor Sizing (IRC) Grounding conductor too small.
Rough Framing Inspection - Commercial Request Complete 5/19/2003 5/20/2003 05/20/2003
Underground Electrical Inspection - Commercial Request Complete 5/19/2003 5/20/2003 05/20/2003
Footing Inspection - Commercial Passed 06/05/2003
Correction
Resolved
06/05/2003
Electrical Listing & Labeling (IRC) this is a test
Miscellaneous Inspection Failed 06/09/2003
Correction
Corrective Action Required
06/09/2003
Erosion control EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Rough Framing Inspection - Commercial Request Complete 9/10/2003 9/11/2003 09/11/2003
Underground Electrical Inspection - Commercial Request Complete 9/10/2003 9/11/2003 09/11/2003
Miscellaneous Inspection Passed 05/05/2004
Correction
Resolved
05/05/2004
Erosion control EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Rough Framing Inspection - Commercial Failed 05/14/2004
Correction
Resolved
05/14/2004
TYPE YOUR OWN TEXT this is a test
Correction
Corrective Action Required
05/14/2004
Circular Stairs (IRC) fghsfrghsfgh Conference Room Downstairs
Rough Electrical Inspection - Commercial Passed 11/05/2004
Miscellaneous Inspection Passed 10/05/2005
Miscellaneous Inspection Passed 12/09/2005
Correction
Resolved
12/09/2005
Erosion control EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Pool Final - Commercial Failed 01/23/2006
Correction
Corrective Action Required
01/23/2006
Test for 1/23/05 as[;dljgkafb
Rough Framing Inspection - Commercial Failed 06/08/2006
Correction
Corrective Action Required
06/08/2006
Circular Stairs (IRC) fghsfrghsfgh Conference Room Downstairs
Correction
Corrective Action Required
06/08/2006
Landings at Doors (IRC) GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG0000000000000000000000PPPPPPPPPPP,,,,,,P.OOOP.P...[[[[[[[[[[[[[[[[VVVVVVVVVVVVVVVVVMMMMMMMMMMMMMMMMMM////////////////////////////???????????????????????????????????????????????????????????????????????????????????""""""""" Bathroom
Piers/Caissons Inspection - Commercial Passed 07/11/2007
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.