Permit Application Status

B0200091


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0200091
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW OTHER
GAS COLLECTION SYSTEM
01/22/2002
04/15/2003
10/12/2003
03/31/2006
Locations
Contacts
TERRADYNE LTD, Address:16203 NW 45 HY  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/21/2002 10/29/2010
Correction

CA - Indicate the height of the security fence.
Correction

CA - Provide documentation indicating that the components used in the utility flare unit are tested and listed for this use.
Correction

CA - Provide details on how power will be supplied to the utility flare system.
Correction

Fire Department- All valves to the flare shall be labeled and accessible in an emergency.
Correction

Fire Department- All piping and equipment shall be in compliance with 2000 IFGC.
Correction

Fire Department- Provide detailed specification information for the flare unit.
Correction

Fire Department-A combustible clearance of 50' shall be maintained around the flare.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

Fire Department; An approved lock shall be installed on gates or similar barriers when required by the code official.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Plan Check Fees $37.50 $37.50 Paid 04/15/2003
25 Electrical Permit Fee $65.00 $65.00 Paid 04/15/2003
25 Mechanical Permit Fees $30.00 $30.00 Paid 04/15/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Not Ready 04/10/2003
Correction
Corrective Action Required
04/10/2003
None NOT READY
Driveway Inspection Not Ready 04/10/2003
Electrical Service Inspection Failed 04/21/2003
Correction
Corrective Action Required
04/21/2003
Grounding Electrode Installation (IRC) 400 AMP BREAKER, WIRING COLOR CODED. NO RECORD OF INSPECTION ON GROUND. HOLD METER
Electrical Service Inspection Passed 04/21/2003
Correction
Resolved
04/21/2003
Grounding Electrode Installation (IRC) 400 AMP BREAKER, WIRING COLOR CODED. RELEASE METER. SEE HANDWRITTEN INSPECTION DTD 4/10/03
Driveway Inspection Passed 04/21/2003
Correction
Resolved
04/21/2003
None
Driveway Inspection Passed 04/22/2003
Final Inspection - Commercial Passed 03/30/2006
Correction
Resolved
03/30/2006
None CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home