Summary
B0101762
Building Permit - Commercial
Final Completion
NEWPORT INVESTMENTS INC
ALTERATION COMMERCIAL
ADD TWO NEW PUMPS
10/12/2001
12/04/2001
06/02/2002
05/15/2003
Locations
Contacts
QUICK TRIP CORP., Address:6300 W. 51ST STREET  
NEWPORT INVESTMENTS INC, Address:PO BOX 3475  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/10/2002 10/29/2010
Correction

Fire Department-3403.6.3 Testing. Unless tested in accordance with the applicable section of ANSI B31.9, piping, before being covered,enclosed or placed in use, shall be hydrostatically tested to 150 percent of the maximum anticipated pressure of the system, or pneumatically tested to 110 percent of the maximum anticipated pressure of the system, but not less than 5 pounds per square gauge (psig) (34.47 kPa) at the highest point of the system. This test shall be maintained for a sufficient time period to complete visual inspection of joints and connections. For a minimum of 10 minutes, there shall be no leakage or permanent distortion. Care shall be exercised to ensure that these pressures are not applied to vented storage tanks. Such storage tanks shall be tested independently from the piping. basin to ensure their operation in a fire condition. Call the fire dept. at (816) 969-7343, 48 hours in advance to schedule an appointment to witness test.
Correction

Fire Department- The signage for fuel dispensers shall be in accordance with IFC Section 2205.6.
Correction

Fire Department-2205.5 Fire extinguishers. Approved portable fire extinguishers complying with Section 906 with a minimum rating of 2-A:20-B:C shall be provided and located such that an extinguisher is not more than 75 feet (22 860 mm) from pumps,dispensers or storage tank fill-pipe openings.
Correction

Fire Department-2204.2.4 Obstructions to view. Dispensing devices shall be in clear view of the attendant at all times. Obstructions shall not be placed between the dispensing area and the attendant.
Correction

Fire Department- Installation and use of the dispensers shall be in accordance with 2000 IFC, Sections 2203 through 2206. and 2205 and 2206.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The holder of this permit agrees and understands that only persons authorized per LSCO 7-130 are permitted to perform electrical, plumbing or mechanical work authorized by this permit.
Correction

CA - 2000 IBC 1704.1 - Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner's agent shall employ one or more special inspectors to provide inspections during construction on the types of work listed under Section 1704. The special inspecor shall be a qualified person who shall demonstrate competence, to the satisfaction of the building official, for inspection of the the particular type of construction or operation requiring special inspection.
Correction

CA - 2000 IBC 1704.1.1 - The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

CA - 2000 IBC 1704.1.2 - Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and the registered design professional in responsible charge prior to the completion of that phase of the work. A final report of inspections documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted periodically at a frequency agreed upon by the permit applicant and the building official prior to the start of work.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-168 A - Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place before inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94; the concrete need not be on the job.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-163 - Work shall not be done beyound the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or shall notify the permit holder or an agent of the permit holder wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - All exterior mechanical equipment, whether roof mounted or ground mounted, shall be screened from view from off the property. The appearance of screens shall be coordinated with the building to maintain a unified appearance.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $302.00 $302.00 Paid 12/04/2001
24 BLDG Plan Check Fees $20.00 $20.00 Paid 12/04/2001
25 Electrical Permit Fee $15.00 $15.00 Paid 12/04/2001
BLDG Renewal Fees $151.00 $151.00 Paid 01/15/2003
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 03/26/2003
Correction
Resolved
03/26/2003
FOUR FOOTINGS APPROVED PER ON-SITE DRWG LSC-26514 AB2 (NOT STAMPED) OK TO POUR WHEN READY 5' x 5' x 4'
Underground Electrical Inspection - Commercial Partial 04/01/2003
Correction
Partial Correction
04/01/2003
UNDERGROUND ELECTRICAL - PARTIAL TO TANK BURIAL AREA. OK TO COVER WHEN PERMIT PRINTS ARE BROUGHT ON-SITE. FOUR 3/4" PVC CONDUITS FROM REAR NW BLDG CORNER
Underground Electrical Inspection - Commercial Passed 04/23/2003
Correction
Resolved
04/23/2003
UNDERGROUND ELECTRICAL - PARTIAL FINAL PARTIAL OK TO COVER WHEN READY
Final Inspection - Commercial Partial 04/28/2003
Correction
Partial Correction
04/28/2003
CANOPY-TOP SYSTEMS SECURING OF LIQUID-TIGHT CONDUIT WITHIN 12"OF BOXES & DEVICES EXCEPTED ON THIS PROJECT ONLY. APPROVED
Final Inspection - Commercial Failed 05/01/2003
Correction
Resolved
05/01/2003
CANOPY-TOP SYSTEMS
Correction
Corrective Action Required
05/01/2003
CONCRETE PAVING NOT YET POURED AREA WEST OF NEW PUMPS
Correction
Corrective Action Required
05/01/2003
Receive Fire Department approval
Final Inspection - Commercial Passed 05/05/2003
Correction
Resolved
05/05/2003
CONCRETE PAVING
Correction
Resolved
05/05/2003
Receive Fire Department approval
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home