Permit Application Status

B0101651


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0101651
Building Permit - Commercial
Certificate of Occupancy
JONES GLEN H-TRUSTEE
NEW TENANT FINISH
TENANT FINISH
09/24/2001
10/03/2001
04/01/2002
03/19/2002
Locations
Contacts
GLEN JONES, CUMBERLAND PROPERTIES, Address:317 NE BRYANT COURT  
JONES GLEN H-TRUSTEE, Address:500 SW MARKET ST STE E  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/23/2002 10/29/2010
Correction

Codes Administration- A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration - A Temporary Certificate of Occupancy will only be granted when all life safety issues have been completed.
Correction

Codes Administration - Occupancy prior to final inspection is prohibited except as provided by law, and the applicant or permittee in violation thereof shall be subject to prosecution. The applicant understands that this permit is issued only for work described here-in and included in accompanying plans and no work shall be covered without the approval of the Codes Administration Department.
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration- Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Building Official. The Building Official, upon notification, shall make the requested inspections and shall either indicate that portion of the construction is satisfactory as completed, or shall notify the permit holder or an agent of the permit holder wherein the same fails to comply with this code. Any portions which do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the Building Official. (1991 Uniform Building Code, Section 305.(d).)
Correction

Codes Administration- A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. ( UBC Section 305.(g))
Correction

Codes Administration- A reinspection fee may be assessed if an approved set of plans are not readily available to the inspector and the permit card is not posted at the time of the inspection. (UBC Section 305.(g))
Correction

Fire Department;Fire sprinkler coverage must be maintained during construction. Modification to the system must be approved prior to work.
Correction

Fire Department; Occupant notification needed in the form of horn/strobes in the event of fire sprinkler activation. Horn/ strobes to activate with water flow equal to a single sprinkler head activation.
Correction

Fire Department- The duct detectors when activated shall be received at the panel and alarm company as a trouble alarm. (UFC Section 10.503.)
Correction

Fire Department- A set of sprinkler plans and specifications bearing a State of Missouri licensed engineers seal, shall be submitted to the Fire Department for review and approval prior to construction (system modification). (1991 Uniform Fire Code, Section 10.503)
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- All locksets, both new and existing shall be openable from the inside without the use of a key, special tool or knowledge. (UFC.12.106)
Correction

Fire Department- Exit doors shall be operable from the inside without the use of a key or any special knowledge. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC Section 12.106.(c))
Correction

Fire Department- Exit illumination shall be provided and maintained in accordance with the Building Code. Exits shall be illuminated when the building or structure is occupied. Equipment providing emergency power for exit illumination and exit signs shall be maintained in an operable condition. (UFC Section 12.110)
Correction

Fire Department- If building alteration adversely effects exit illumination, exit illumination shall be provided and maintained in accordance with the Building Code. UFC Section 12.110.(A).
Correction

Fire Department- Extension cords shall not be utilized as a substitute for permanent wiring. Extension cords shall only be utilized with portable appliances while such appliances are in use and shall only supply one portable appliance except for approved multi-plug extension cords. Extension cords shall be grounded when serving grounded appliances. Extension cords and multi-plug extension cords shall not be affixed to structures; extened through walls, ceilings, floors, under doors or floor coverings; or be subject to environmental or physical damage. (UFC Section 85.106.(a), (b) and (c))
Correction

Fire Department- During construction fire department access shall be maintained and not obstructed. UFC Section 87.103.(b)
Correction

Fire Department- Combustible debris shall not be accumulated within buildings. Combustible debris, rubbish and waste material shall be removed from buildings as often as practicl. Combustible debris, waste material and trash shall not be burned on site. UFC Section87.103.(e)
Correction

Fire Department- During construction required exit components shall be maintained. UFC Section 87.101.(c)
Correction

Fire Department- During construction and alteration fire-resistive assemblies and construction shall be maintained in accordance with Section 10.602. and 10.602. UFC Section 87.104.(d)
Correction

Codes Administration- Materials exposed within ducts or plenums shall have a flame-spread index of not more than 25 and a smoke-developed rating of not more than 50 when tested in accordance with the test for Surface Burning Characteristics of Building Materials, U.B.C. Standard No. 42-1. 1991 Uniform Mechanical Code Section 1002.b.
Correction

P & D - Sign permits must be obtained for all exterior business related signs prior to installation. All signs shall comply with the sign requirements outlined in Ord. 715, Sec. 350. Contact the Planning and Development Department at 816-969-7317 for details.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $32.00 $32.00 Paid 10/03/2001
24 BLDG Plan Check Fees $4.50 $4.50 Paid 10/03/2001
25 Electrical Permit Fee $35.00 $35.00 Paid 10/03/2001
25 Mechanical Permit Fees $15.00 $15.00 Paid 10/03/2001
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home