Permit Application Status

B0101638


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0101638
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW COMMERCIAL
NEW COMMERCIAL BUILDING
09/21/2001
01/22/2002
07/21/2002
05/14/2003
Locations
Contacts
BROONER AND ASSOCIATES, Address:C. ORMAN BROONER  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/20/2002 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Erosion control shall be provided in conformance with Article VIII, Section VIII(c) & (d) and details 48 and 48A of the City of Lee's Summit Design and Construction Manual. Erosion control devices shall be installed and maintained during all phases of the construction process. Failure to provide or maintain erosion control may result in an issuance of a stop work order which is authorized by Article I, Section XXIV.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

PW - Contact Public Works Inspection at 969-7450 to obtain necessary infrastructure permits and inspection fees prior to start of construction.
Correction

PW - Contact Public Works Inspection at 969-7450 24-hours prior to the anticipated commencement of construction.
Correction

PW - Provide a copy of the Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit.
Correction

PW - Contact the Right of Way Coordinator at 969-7470 prior to any land disturbance activities within the rights-of-way. These activities may require a right-of-way permit.
Correction

PW - Please submit five (5) sets of revised civil site plans containing the information necessary to address the Water Utilities and the Public Works Engineering Departments comments.
Correction

PW - Amend the referenced telephone number for the Public Works Department to 816-969-7307.
Correction

PW - Provide complete reference information throughout the plans. References do not have the complete page number.
Correction

PW - Provide a copy of the NPDES land disturbance permit.
Correction

PW - Provide improvements for storm water flow in excess of five cubic feet per second and/or a velocity of five feet per second for a ten-year storm frequency in compliance with Article IV Section I. B. 7. a. from City Ordinance No. 3719.
Correction

PW - Re-submit a storm water detention report and supporting calculations to the Engineering Department for review. Provide time of concentration calculations for before and after development. If these times are different they will change the volume required. Provide the outlet piping calculations. A licensed Professional Engineer registered in the State of Missouri must prepare the detention report and calculations.
Correction

PW - Provide a low flow channel for the detention basin.
Correction

PW - Provide a pipe sizing calculations, pipe sizing and profiles for the storm sewer piping.
Correction

PW - Re-submit proposed contours. The proposed contours do not tie into existing contours. In addition, the grading indicated on the plan routes the storm flow towards the existing salt dome structure. Also, the proposed storm water routing with a series of arrows. Provide a detailed description of the proposed contours providing the strom water flow. Indicate the 100-year routing and if necessary the minimum building opening elevations for the 100-year storm frequency.
Correction

PW - Provide a detail of the proposed trash enclosure.
Correction

PW - Verify that the proposed chip and seal pavement will support the weight of all departmental fire apparatus and other associated heavy equipment.
Correction

PW - Provide a sight triangle and site distance information for both entrances. The north entrance is proposed near a curve and may need to be adjusted.
Correction

PW - Provide top of curb elevations and other associated survey tie downs for the proposed public parking lot and service entrance. In addition, provide surface grades for the proposed chip and seal parking area.
Correction

PW - Adjust the driveway entrances so that they do not encroach on the existing Hamblen Road pavement.
Correction

PW - Clearly indentify the proposed floor material type within the identified wash bay and pit.
Correction

PW - Clearly identify the agreed limits of grading. The proposed access drive from the landfill for tracked equipment wil not be graded by the pending contractor.
Correction

PW - The floor plan submitted on sheets C101, L100 and E001 are outdated. The entrance to vehicle maintenance is on the north side of the building. The aforementioned plans indicate a cutout on the south side of the building implying the location for vehicle maintence entrance.
Correction

P & D - All landscaping, as shown on the approved plans, shall be installed by May 30, 2002 or prior to the receipt of a Certificate of Occupancy.
Correction

P & D - A 100% opaque screen, consisting of landscaping, shall be provided along the north property line, as shown on the approved landscape plan.
Correction

P & D - All development shall be in accordance with the approved site plan.
Correction

WU - A double check detector check valve assembly is required on the fire service line.
Correction

WU - The location of the Fire Department Connection (FDC) must be shown on the site plan.
Correction

WU - A post indicating valve must be placed just off the public R/W or easement if no water service is tapped to fire line or if backflow prevention device located within building.
Correction

WU - All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816- 969-7636) within 30 days from the date installed.
Correction

WU - Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

Codes Administration - Indicate how the conference room will be furnished. This information will determine how the occupant load will be calculated per table 1003.2.2. If the occupant load is above 50 than the doors will be required to swing in the direction of travel.
Correction

Codes Administration - The waste oil heater shall be a UL listed product. The unit shall be installed per the manufactures requirements and the UL listing.
Correction

Codes Administration - Toilet and bathing facilities. Toilet rooms and bathing facilities shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing facilites provided within the facility shall not be located on the inaccessible floor. At least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing facility shall be accessible. (2000 IBC, Section 1108.2)
Correction

Codes Administration - Provide information on item 7.4WP, manufactured wall panels.
Correction

Codes Administration - What is keynote 8.8PG. I can not locate it on the list.
Correction

Codes Administration - Provide the listings for the penetration protections that will be used.
Correction

Codes Administration - A letter shall be submitted to the Codes Administration Department from the firm selected to perform the special inspections stating that they will perform the items listed on sheet S100.
Correction

Codes Administration - Provide to sets of the metal building drawings to the Codes Administration Department for review and approval prior to installation of the metal building. The plans shall be sealed by an engineer licensed in the state of Missouri.
Correction

Codes Administration - Several of the doors are not identified on the Architectural drawings. All doors shall be identified for clarity.
Correction

Codes Administration - Several of the doors on the door schedule are either not shown as rated or have an incorrect rating on them. Correct the door schedule.
Correction

Codes Administration - Joints installed in or between fire-resistance-rated walls, floor or floor/ceiling assemblies and roofs or roof/ceiling assemblies shall be protected by an approved fire-resistant joint system designed to resist the passage of fire for a time period not less than the required fire-resistance rating of the wall, floor or roof in or between which it is installed. Fire-resistant joint systems shall be tested in accordance with Section 712.3. The void created at the intersection of a floor/ceiling assembly and an exterior curtain wall assembly shall be protected in accordance with Section 712.4. (2000 IBC, Section 712.1)
Correction

Codes Administration - Door Closing. Fire doors shall be self-closing or automatic-closing in accordance with this section. (2000 IBC, Section 714.2.7)
Correction

Codes Administration - The walls of the mechanical mezzanine are shown to be of one-hour fire-resistant construction but the floor system is not. The area does not require seperation as an incidental use if the area is provided with a fire-extinguishing system. Indicate which system will be used and if the seperation is to be provided, than a listed floor/ceiling system needs to submitted.
Correction

Codes Administration - Indicate why the walls of the electrical room are rated.
Correction

Codes Administration - Doors 150B and 150D are meet the requirements of ASTM E 119 per Section 706.6 exception 3 of the 2000 IBC.
Correction

Codes Administration - Provide the manufactures specifications on the Hotsi system. This shall include the type of fuel to be used and the combustion air requirements.
Correction

Codes Administration - Provide the fresh air calculations for the mechanical systems.
Correction

Codes Administration - Except as required by Sections 602.2.1.1 through 602.2.1.4, materials exposed within plenums shall be noncombustible or shall have a flame spread index of not more than 25 and a smoke-development index of not more than 50 when tested in accordance with ASTM E 84. (2000 IMC, Section 602.2.1)
Correction

Codes Administration - If the walls and floor of the mezzanine are to be rated, then information on the dampers shall be submitted.
Correction

Fire Department- The minimum fire flow and flow duration for buildings other than one-and-two family dwellings shall be as specified in Table No. A-III-A-I. (UFC Div.III, App.III-A 5b)
Correction

Fire Department- Fire-protection equipment and fire hydrants shall be clearly identified in a manner approved by the chief to prevent obstruction by parking and other obstructions. (UFC Section 10.105b)
Correction

Fire Department- Fire apparatus access roads shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. (UFC Section 10.204.(a))
Correction

Fire Department- Parking lots and fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. (UFC Section 10.204.(b))
Correction

Fire Department- Approved numbers or address shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. (UFC Section 10.301.(a))
Correction

Fire Department- Provide "Knox Box Entry System". When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be a type approved by the chief and shall contain keys to gain necessary access as required by the chief. (UFC 10.302)
Correction

Fire Department- When any portion of the facility or building protected is in excess of 300 feet from a water supply on a public street, as measured by an approved route around the exterior of the building, on-site fire hydrants and mains capable of supplying the adequate fire flow shall be provided. (UFC 10.401. as amended by LSMO Ord. 3772.)
Correction

Fire Department- A fire hydrant painted yellow is required to be located within 50 feet of the fire department connection to the sprinkler system. (UFC 10.401.)
Correction

Fire Department- When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. UFC 10.502
Correction

Fire Department- The duct detectors when activated shall be received at the panel and alarm company as a trouble alarm. (UFC Section 10.503.)
Correction

Fire Department- A set of sprinkler plans and specifications bearing a State of Missouri licensed engineers seal, shall be submitted to the Fire Department for review and approval prior to construction (system modification). (1991 Uniform Fire Code, Section 10.503)
Correction

Fire Department- Fire-protection or extinguishing system coverage, spacing and specifications shall be maintained accordance with recognized standards at all time. Such systems shall be extended, altered or augmented as necessary to maintain and continue protection whenever any building so equipped is altered, remondeled or added to. Additions, repairs, alterations and servicing shall be in accordance with recognized standards. UFC Section 10.504(a)
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- Except for Group R, Division 3 and Group M Occupancies, an automatic sprinkler system shall be installed in every story or basement of all buildings when the floor area exceeds 1,500 square feet and there is not provided at least 20 square feet of opening entirely above the adjoining ground level in each 50 lineal feet or fraction thereof of exterior wall in the story or basement on at least on side of the building. Openings shall have a minimum dimension of not less than 30 inches. Such openings shall be accessible to the fire department from the exterior and shall not be obstructed in a manner that firefighting or rescue cannot be accomplished from the exterior. (UFC 10.507 b)
Correction

Fire Department- All valves controlling the water supply for automatic sprinkler systems and water-flow switches on all sprinkler systems shall be electrically supervised when the number of sprinkler heads are one-hundred or more. Valve supervision and water-flow alarm and trouble signals shall be distinctly different and shall be automatically transmitted to an approved central station, remote station or proprietary supervising station as defined by national standards. UFC 10.508
Correction

Fire Department- Standpipe systems shall be provided as set forth in Table 10.510-A. UFC 10.510b
Correction

Fire Department- Dumpsters and containers with an individual capacity of 1.5 cubic yards (40.5 cubic feet) or more shall not be stored in buildings or placed within 5 feet of combustible walls, openings or combustible roof lines. (UFC Section 11.302.(b))
Correction

Fire Department- All locksets, both new and existing shall be openable from the inside without the use of a key, special tool or knowledge. (UFC.12.106)
Correction

Fire Department- Exit doors shall be operable from the inside without the use of a key or any special knowledge. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC Section 12.106.(c))
Correction

Fire Department- Exit illumination shall be provided and maintained in accordance with the Building Code. Exits shall be illuminated when the building or structure is occupied. Equipment providing emergency power for exit illumination and exit signs shall be maintained in an operable condition. (UFC Section 12.110)
Correction

Fire Department- If building alteration adversely effects exit illumination, exit illumination shall be provided and maintained in accordance with the Building Code. UFC Section 12.110.(A).
Correction

Fire Department- Complete plans and specifications (bearing an State of Missouri architects /engineers seal) for fire alarm systems shall be submitted for review and approval prior to system installation. (UFC Section 14.103.(a))
Correction

Fire Department- A completed hazardous materials permit application shall be submitted to the Lee's Summit fire department. (UFC Section 4.103 and UFC Section 80.103.(a))
Correction

Fire Department- General. Buildings or portions thereof, in which hazardous materials are stored, handled or used shall be constructed in accordance with the Building Code. (UFC Section 80.108.(a))
Correction

Fire Department- Extension cords shall not be utilized as a substitute for permanent wiring. Extension cords shall only be utilized with portable appliances while such appliances are in use and shall only supply one portable appliance except for approved multi-plug extension cords. Extension cords shall be grounded when serving grounded appliances. Extension cords and multi-plug extension cords shall not be affixed to structures; extened through walls, ceilings, floors, under doors or floor coverings; or be subject to environmental or physical damage. (UFC Section 85.106.(a), (b) and (c))
Correction

Fire Department- Combustible debris shall not be accumulated within buildings. Combustible debris, rubbish and waste material shall be removed from buildings as often as practical. Combustible debris, waste material and trash shall not be burned on site. (UFC Section 87.103.(e))
Correction

Fire Department- During construction fire department access shall be maintained and not obstructed. UFC Section 87.103.(b)
Correction

Fire Department- Combustible debris shall not be accumulated within buildings. Combustible debris, rubbish and waste material shall be removed from buildings as often as practicl. Combustible debris, waste material and trash shall not be burned on site. UFC Section87.103.(e)
Correction

Fire Department- During construction required exit components shall be maintained. UFC Section 87.101.(c)
Correction

Fire Department- During construction and alteration fire-resistive assemblies and construction shall be maintained in accordance with Section 10.602. and 10.602. UFC Section 87.104.(d)
Correction

P & D - Each accessible parking space shall be identified by a sign, mounted between 3 and 5 feet above the parking surface, at the head of the parking space. The sign shall be at least 12" x 18" in area and meet the requirements set forth in the manual on Uniform Traffic Control Devices, as referenced in Section 29-381 of the Lee's Summit General Code of Ordinances (sign type R7-8D)
Correction

P & D - All access drives and parking areas shall be constructed with straight-back (Type CG-1) concrete curbing.
Correction

P & D - Parking lot lights shall be of the metal halide variety with a total cut-off of light at an angle of less than 90 degrees (measured from the vertical).
Correction

P & D - All exterior lighting, whether on poles or buildings, shall be of such types and so arranged that no light source is visible from adjacent properties and public right-of-way.
Correction

P & D - All exterior mechanical equipment, whether roof mounted or ground mounted, shall be screened from view from off the property. The appearance of screens shall be coordinated with the building to maintain a unified appearance.
Correction

P & D - All off-street parking areas and all access drives shall be improved with a permanent dust-free surface.
Correction

P & D - Parking, including curbs, must be installed prior to occupancy.
Correction

P & D - Sign permits must be obtained for all exterior business related signs prior to installation. All signs shall comply with the sign requirements outlined in Ord. 715, Sec. 350. Contact the Planning and Development Department at 816-969-7317 for details.
Correction

P & D - The required off-street parking space shall be a minimum of 9 feet by 19 feet. All parking spaces shall be striped prior to occupancy.
Correction

P & D - All exterior trash storage containers shall be screened as shown on the approved site plan.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $11,483.00 $11,483.00 Paid 01/22/2002
24 BLDG Plan Check Fees $211.35 $211.35 Paid 01/22/2002
25 Electrical Permit Fee $285.00 $285.00 Paid 01/22/2002
25 Mechanical Permit Fees $213.50 $213.50 Paid 01/22/2002
25 Plumbing Permit Fees $174.00 $174.00 Paid 01/22/2002
84 Water Meters $1,410.25 $1,410.25 Paid 01/22/2002
85 Water Taps $20,505.00 $20,505.00 Paid 01/22/2002
89 Sewer Tap Fees $900.00 $900.00 Paid 01/22/2002
Right of Way Permit $35.00 $35.00 Paid 01/22/2002
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 03/28/2002
Correction
Partial Correction
03/28/2002
None COMBINATION FOOTING - M.5-6 TO M-13 AND C-9 TO C-13.
Footing Inspection - Commercial Partial 04/05/2002
Correction
Partial Correction
04/05/2002
None EAST WALL PERIMETER COMB. FOOTING APPROVED PENDING COMPLETION OF REINFORCEMENT PER APPROVED DRAWINGS.
Footing Inspection - Commercial Partial 04/16/2002
Correction
Partial Correction
04/16/2002
None TIRE STORAGE - REINFORCED PER DRAWINGS.
Foundation Inspection - Commercial Partial 04/17/2002
Correction
Partial Correction
04/17/2002
None WALL ON M LINE FROM 6A TO 11. REINFORCED PER DRAWINGS.
Footing Inspection - Commercial Partial 04/18/2002
Correction
Partial Correction
04/18/2002
None TIRE STORAGE AND SE CORNER OF MAIN STRUCTURE PERIMETER APPROVED.
Underground Plumbing Inspection - Commercial Partial 04/23/2002
Correction
Partial Correction
04/23/2002
None SAND/OIL INTERCEPTOR PER DETAIL ON P300.
Foundation Inspection - Commercial Partial 04/25/2002
Correction
Partial Correction
04/25/2002
PARTIAL C/L M FROM 11.5 TO 16.5 SECTIONS B & C SHT S301
Footing Inspection - Commercial Partial 04/30/2002
Correction
Partial Correction
04/30/2002
None EAST COVERED STORAGE - 6 WEST SPREAD FOOTINGS APPROVED.
Foundation Inspection - Commercial Partial 05/02/2002
Correction
Partial Correction
05/02/2002
None Wall from O-6 to M-2A. Approved.
Foundation Inspection - Commercial Partial 05/03/2002
Correction
Partial Correction
05/03/2002
None Fnd. wall from 5` w. of C-20 to 10` s. of M-20. Approved.
Foundation Inspection - Commercial Partial 05/13/2002
Correction
Partial Correction
05/13/2002
None FND. WALL on C line from 14.5 to 19.8 Approved.
Foundation Inspection - Commercial Partial 05/21/2002
Correction
Partial Correction
05/21/2002
None WALL FROM O-2 TO C-7. APPROVED.
Foundation Inspection - Commercial Partial 05/29/2002
Correction
Partial Correction
05/29/2002
None Wall on C line from 6A to 14.5 approved. Pavement slab from 6A to 20 and M to 15` N. of P line reinforced per approved drawings.
Underground Electrical Inspection - Commercial Partial 06/07/2002
Correction
Partial Correction
06/07/2002
None Observed photographs of conduit in trenches, cad weld application, and ground rod installation. Observed conduit and stub-ups at elec. room, generator, and tech room. Letter to be provided by Encompass for installations unobserved. Above approved.
Underground Plumbing Inspection - Commercial Partial 06/14/2002
Correction
Partial Correction
06/14/2002
None SAND/OIL INTERCEPTOR PER DETAIL ON P300.
Correction
Partial Correction
06/14/2002
None 10` section of 4" san. sewer under fnd. on C line east of 13. Approved.
Water Service Inspection Passed 06/19/2002
Underground Electrical Inspection - Commercial Partial 06/19/2002
Correction
Partial Correction
06/19/2002
None 2" conduit under N. construction road approved.
Footing Inspection - Commercial Partial 06/21/2002
Correction
Partial Correction
06/21/2002
None WEST END OF MAINTENANCE BUILDING: 6 COLUMN PADS WITH #5 BARS (5 EACH WAY) 2 COLUMN PADS WITH #5 BARS (6 EACH WAY) EAST END OF MAINT. BLDG: 2 PADS FOR EXHAUST DRAIN VENTS ALL APPROVED
Foundation Inspection - Commercial Partial 06/25/2002
Correction
Partial Correction
06/25/2002
None Footing sections at C-7, A-6, and on M from 15 to 16 approved.
Underslab Plumbing Inspection - Commercial Partial 06/25/2002
Correction
Partial Correction
06/25/2002
None San. lines for rooms 127 and 129 approved.
Underslab Plumbing Inspection - Commercial Partial 06/26/2002
Correction
Partial Correction
06/26/2002
None Women's restroom, break room & dr. fntn. san. lines approved.
Foundation Inspection - Commercial Partial 06/27/2002
Correction
Partial Correction
06/27/2002
None Dock foundation reinforcing at drains - C line, 9-12 and 16-19; M line, 7-11, 12-13 and 14-19. Approved.
Piers/Caissons Inspection - Commercial Partial 06/28/2002
Correction
Partial Correction
06/28/2002
None Light pole bases - 2 at S. entrance road, 4 W. side of building. Approved.
Footing Inspection - Commercial Partial 07/02/2002
Correction
Partial Correction
07/02/2002
None Spread footings at G.3-5, G.7-5, K.2-6, H.9-6A, D.8-6 and F-6A approved.
Underslab Plumbing Inspection - Commercial Partial 07/03/2002
Correction
Partial Correction
07/03/2002
None 4" san. for north dock drains and wash bay approved.
Underslab Plumbing Inspection - Commercial Partial 07/10/2002
Correction
Partial Correction
07/10/2002
None South dock drains west of 14 line, shop bathroom and drinking fntn. sanitary lines approved.
Underslab Plumbing Inspection - Commercial Passed 07/16/2002
Correction
Resolved
07/16/2002
None San. lines for rooms 127 and 129 approved.
Correction
Resolved
07/16/2002
None Women's restroom, break room & dr. fntn. san. lines approved.
Correction
Resolved
07/16/2002
None 4" san. for north dock drains and wash bay approved.
Correction
Resolved
07/16/2002
None South dock drains west of 14 line, shop bathroom and drinking fntn. sanitary lines approved.
Correction
Resolved
07/16/2002
None 4" san. for south dock drains from 14 to 19.3 approved.
Foundation Inspection - Commercial Partial 07/17/2002
Correction
Partial Correction
07/17/2002
None Two (2) light pole bases approved.
Footing Inspection - Commercial Partial 07/19/2002
Correction
Partial Correction
07/19/2002
None WASH PIT FOOTING APPROVED.
Foundation Inspection - Commercial Partial 07/24/2002
Correction
Partial Correction
07/24/2002
None Wash pit east fnd. wall reinforcing approved.
Foundation Inspection - Commercial Partial 08/01/2002
Correction
Partial Correction
08/01/2002
None Wash pit fnd. wall reinforcing approved.
Underground Electrical Inspection - Commercial Not Ready 08/29/2002
Rough Electrical Inspection - Commercial Partial 08/29/2002
Correction
Partial Correction
08/29/2002
IN-WALL CONDUIT & BOXES OK TO COVER C/L 1 TO C/L 4 FULL BUILDING WIDTH
Underslab Electrical Inspection - Commercial Partial 08/29/2002
Correction
Partial Correction
08/29/2002
NONE > PARTIAL APPROVED C/L 7 TO C/L 13 FULL WIDTH OF BLDG
Rough Plumbing Inspection - Commercial Partial 09/04/2002
Correction
Partial Correction
09/04/2002
IN WALL PLUMBING PARTIAL PER SHT P100 EXCEPT SINKS MOVED FROM N WALL TO E WALL IN RM 129. TWO STOOLS ADDED. RMS 128 & 129 C.I. DWV + COPPER WATER
Rough Framing Inspection - Commercial Partial 09/04/2002
Correction
Partial Correction
09/04/2002
STEEL STUD PARTITION FRAMING PARTIAL SUBSTANTIALLY COMPLETE. C/L "A" TO "P" C/R "2" TO "6"
Underslab Electrical Inspection - Commercial Partial 09/10/2002
Correction
Partial Correction
09/10/2002
NONE > PARTIAL APPROVED C/L 13 TO E. WALL FULL WIDTH OF BLDG
Rough Electrical Inspection - Commercial Partial 09/10/2002
Correction
Partial Correction
09/10/2002
IN-WALL CONDUIT & BOXES OK TO COVER C/L 1 TO C/L 6 FULL BUILDING WIDTH
Rough Plumbing Inspection - Commercial Partial 09/10/2002
Correction
Partial Correction
09/10/2002
IN WALL PLUMBING PARTIAL APPROVED PER SHT P100 EXCEPT SINKS MOVED FROM N WALL TO E WALL IN RM 129. TWO STOOLS ADDED. OK TO COVER. C/L 1 TO C/L 6 C.I. DWV + COPPER WATER
All Rough Inspection - Commercial Partial 09/17/2002
Correction
Partial Correction
09/17/2002
None COPY ROOM, FILE STORAGE, AND W. SIDE OF 4 LINE APPROVED.
Rough Framing Inspection - Commercial Partial 09/25/2002
Correction
Partial Correction
09/25/2002
None MEZZANINE AND 2-HOUR SEPARATION WALL FRAMING APPROVED.
Rough Plumbing Inspection - Commercial Partial 09/25/2002
Correction
Partial Correction
09/25/2002
None SHOWER ROOM SUPPLIES APPROVED. OK TO COVER.
All Rough Inspection - Commercial Partial 10/09/2002
Correction
Partial Correction
10/09/2002
None COPY ROOM, FILE STORAGE, AND W. SIDE OF 4 LINE APPROVED.
Correction
Partial Correction
10/09/2002
None 2 HR SEP. FIRST LAYER APPROVED
Electrical Service Inspection Passed 10/16/2002
All Rough Inspection - Commercial Passed 10/16/2002
Correction
Resolved
10/16/2002
None COPY ROOM, FILE STORAGE, AND W. SIDE OF 4 LINE APPROVED.
Correction
Resolved
10/16/2002
None 2 HR SEPARATION GYP BOARD ATTACHMENT APPROVED
Rough Electrical Inspection - Commercial Partial 10/16/2002
Correction
Partial Correction
10/16/2002
IN-WALL CONDUIT & BOXES OK TO COVER C/L 1 TO C/L 6 FULL BUILDING WIDTH
Correction
Partial Correction
10/16/2002
None FROM LINE 6 TO LINE 14 APPROVED. OK TO COVER.
Rough Electrical Inspection - Commercial Partial 10/18/2002
Correction
Partial Correction
10/18/2002
None FROM LINE 6 TO LINE 15 APPROVED. OK TO COVER.
Above Ceiling Inspection Failed 11/20/2002
Correction
Corrective Action Required
11/20/2002
Wire fixture Bathroom Women`s
Correction
Corrective Action Required
11/20/2002
Open j-boxes. MEN`S SHOWER ROOM, MEN`S MUD ROOM, PHONE ROOM
Correction
Corrective Action Required
11/20/2002
Support drop-in fixtures. ROOMS 103 - 106.
Correction
Corrective Action Required
11/20/2002
Incomplete BREAK ROOM, ATTACHED MUD ROOM.
Correction
Resolved
11/20/2002
None NO PLUMBING OR MECHANICAL ISSUES.
Above Ceiling Inspection Partial 11/21/2002
Correction
Resolved
11/21/2002
Wire fixture Bathroom Women`s
Correction
Resolved
11/21/2002
Open j-boxes.
Correction
Resolved
11/21/2002
Support drop-in fixtures. ROOMS 103 - 106.
Correction
Resolved
11/21/2002
Incomplete
Correction
Resolved
11/21/2002
None NO PLUMBING OR MECHANICAL ISSUES.
Correction
Partial Correction
11/21/2002
None SERVICE BAY AREAS NOT YET INSPECTED.
Occupancy Inspection - Codes Commercial Failed 12/02/2002
Correction
Corrective Action Required
12/02/2002
Receive Planning & Development Approval COMPLETE EXTERIOR OF BUILDING AND ALL SITE WORK. CONTACT PLANNING & DEVELOPMENT FOR PUNCHLIST AT 969-7317.
Correction
Corrective Action Required
12/02/2002
Receive Water Utilities Approval SUBMIT DOMESTIC WATER BACKFLOW REPORT AS WELL AS REPORTS FOR ICE MACHINE AND HOPSY EQUIPMENT. PROVIDE DRAIN LINES FOR GLYCOL AND ICE MACHINE DEVICES.
Correction
Corrective Action Required
12/02/2002
Receive Fire Department approval PUNCHLIST UNDER SEPERATE COVER.
Correction
Corrective Action Required
12/02/2002
Receive Public Works Approval SUBMIT AS-BUILTS, MAINT. BONDS AND AFFADAVITS. TURN 4 HYDRANTS PER P.W. DIRECTION.
Correction
Corrective Action Required
12/02/2002
ABOVE CEILING ABOVE CEILING WORK STILL UNDER WAY IN CVM SHOP OFFICE AREA. RECEIVE APPROVAL PRIOR TO COVERING.
Correction
Corrective Action Required
12/02/2002
EXTERIOR ITEMS PROVIDE ADDRESS VISIBLE FROM STREET, COMPLETE GLAZING, EXTERIOR DOORS, EXTERIOR ELECTRICAL (LIGHTING AND GFCI'S), SEAL EXTERIOR PENETRATIONS (GAS, SPRINKLER, ETC.)
Correction
Corrective Action Required
12/02/2002
SPECIAL INSPECTIONS SUBMIT FINAL SPECIAL INSPECTIONS REPORT
Correction
Corrective Action Required
12/02/2002
ELEC. & PLUMB. UNDER BREAKROOM SINK ATTACH DISHWASHER DRAIN TO BOTTOM OF COUNTERTOP OR AS HIGH AS POSSIBLE. GARBAGE DISPOSAL NOT WIRED (NO WHIP).
Correction
Corrective Action Required
12/02/2002
ELECTRICAL PANEL LABELING LABEL ALL CIRCUITS WITHIN ALL ELECTRICAL PANELS.
Correction
Corrective Action Required
12/02/2002
COVER UNDERSLAB PLUMBING INSTALL FLOOR COVER FOR UNDERSLAB PLUMBING IN NORTH/SOUTH CORRIDOR, (JUST SOUTH OF MAIN EAST WEST CORRIDOR).
Correction
Corrective Action Required
12/02/2002
MEZZANINE AREA GROUT AROUND SPRINKLER RISER (SW CORNER OF MEZZANINE) INSTALL THRESHOLD OR SWEEP AT BOTTOM OF LOADING DOORS INTO MEZZANINE.
Correction
Corrective Action Required
12/02/2002
OUTLET INSTALLATION SEAL AROUND OUTLET IN SMALL TOOL AREA. (SHEETROCK CUT-OUT TOO LARGE.
Correction
Corrective Action Required
12/02/2002
MISSING TRIM RINGS INSTALL TRIM RINGS AT SPRINKLER HEADS IN STREETS AND CVM "LOUNGE AREAS" AS WELL AS CVM OFFICE AREAS ONCE ABOVE CEILING COMPLETED AND TILES DROPPED.
Correction
Corrective Action Required
12/02/2002
SHOP AREA ELECTRICAL COMPLETE ELECTRICAL IN SHOP AREAS. (EXHAUST FAN WIRING, EYE WASH WIRING, WASTE OIL HEATER WIRING AND INSTALLATION, ETC.)
Rough Mechanical Inspection - Commercial Passed 12/31/2002
Above Ceiling Inspection Passed 12/31/2002
Correction
Resolved
12/31/2002
None NO PLUMBING OR MECHANICAL ISSUES.
Correction
Resolved
12/31/2002
None
Sewer Service Inspection Passed 12/31/2002
Rough Plumbing Inspection - Commercial Passed 12/31/2002
Correction
Resolved
12/31/2002
IN WALL PLUMBING PARTIAL APPROVED PER SHT P100 EXCEPT SINKS MOVED FROM N WALL TO E WALL IN RM 129. TWO STOOLS ADDED. OK TO COVER. C/L 1 TO C/L 6 C.I. DWV + COPPER WATER
Correction
Resolved
12/31/2002
None SHOWER ROOM SUPPLIES APPROVED. OK TO COVER.
Rough Electrical Inspection - Commercial Passed 12/31/2002
Correction
Resolved
12/31/2002
IN-WALL CONDUIT & BOXES OK TO COVER C/L 1 TO C/L 6 FULL BUILDING WIDTH
Correction
Resolved
12/31/2002
None FROM LINE 6 TO LINE 15 APPROVED. OK TO COVER.
Occupancy Inspection - Codes Commercial Failed 01/17/2003
Correction
Resolved
01/17/2003
Receive Planning & Development Approval
Correction
Resolved
01/17/2003
Receive Water Utilities Approval
Correction
Corrective Action Required
01/17/2003
Receive Fire Department approval PUNCHLIST UNDER SEPERATE COVER.
Correction
Corrective Action Required
01/17/2003
Receive Public Works Approval SUBMIT AS BUILTS
Correction
Resolved
01/17/2003
ABOVE CEILING
Correction
Corrective Action Required
01/17/2003
EXTERIOR ITEMS COMPLETE EXTERIOR GLAZING. CHIP AND SEAL TO BE COMPLETED ONCE WEATHER PERMITS.
Correction
Resolved
01/17/2003
SPECIAL INSPECTIONS
Correction
Resolved
01/17/2003
ELEC. & PLUMB. UNDER BREAKROOM SINK
Correction
Resolved
01/17/2003
ELECTRICAL PANEL LABELING
Correction
Resolved
01/17/2003
COVER UNDERSLAB PLUMBING
Correction
Corrective Action Required
01/17/2003
MEZZANINE AREA SEAL ALL PENETRATIONS IN EAST WALL OF MEZZANINE AREA (2 HOUR WALL) LOW VOLTAGE PENETRATIONS MADE WITHOUT FIRECAULKING.
Correction
Resolved
01/17/2003
OUTLET INSTALLATION
Correction
Resolved
01/17/2003
MISSING TRIM RINGS
Correction
Resolved
01/17/2003
SHOP AREA ELECTRICAL
Rough Framing Inspection - Commercial Passed 01/17/2003
Correction
Resolved
01/17/2003
STEEL STUD PARTITION FRAMING PARTIAL
Correction
Resolved
01/17/2003
None
Special Inspections Passed 01/17/2003
Occupancy Inspection - Codes Commercial Failed 04/17/2003
Correction
Resolved
04/17/2003
Receive Public Works Approval
Occupancy Inspection - Codes Commercial Passed 05/09/2003
Correction
Resolved
05/09/2003
Receive Fire Department approval
Correction
Resolved
05/09/2003
EXTERIOR ITEMS
Correction
Resolved
05/09/2003
MEZZANINE AREA
Documents & Images
Date Uploaded File Type Document Name
09/23/2019 Lee's Summit Landfill Compost Pad Site
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home