Permit Application Status

B0101203


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0101203
Building Permit - Commercial
Certificate of Occupancy
WHY INVESTORS LLC
CHANGE OF TENANT
TENANT FINISH/BATESVILLE BUILDING NOV 3-22-02
07/12/2001
08/09/2001
02/05/2002
12/03/2002
Locations
Contacts
M.A.C. CORP, Address:16400 E TRUMAN ROAD, SPACE C  
WHY INVESTORS LLC, Address:1948 E SANTA FE  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/08/2002 10/29/2010
Correction

WU - If no existing wye or tee fitting is available for the connection of this service line to the existing main, the type or connection method must be specified. It is suggested that a wye fitting be cut in on the public main with proper connection fittings.
Correction

WU - The minimum acceptable slope of the sanitary sewer service line should be indicated as 2%.
Correction

WU - A grease/solids interceptor must be shown with an indication of size, type and detail of the interceptor.
Correction

WU - Calculations must be provided for determining the size and volume of the solids interceptor.
Correction

WU - All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816- 969-7636) within 30 days from the date installed.
Correction

WU - The existing backflow prevention assembly must be shown on plumbing plans.
Correction

WU - Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

WU - A note should be provided indicating the connection to the public main shall be made at an existing wye or tee fitting.
Correction

WU - The sanitary service line size must be shown (4-inch diameter min.).
Correction

WU - Sanitary service line must meet the minimum specifications be SDR26 PVC pipe.
Correction

WU - The location of the Fire Department Connection (FDC) must be shown on the site plan.
Correction

WU - A double check detector check valve assembly is required on the fire service line.
Correction

WU - A note should be provided indicating a Reduce Pressure Zone (RPZ) principal backflow prevention device will be placed inside the building on the domestic water service line prior to any point of use.
Correction

WU - The water meter size needs to be indicated.
Correction

WU - The water meter should be located within one (1) foot of the property or easement boundary.
Correction

WU - The water service line size must be shown on the site plan. You are reminded that 1 1/4", 1 1/2" & 3" diameter service piping is not acceptable.
Correction

WU - The water service line from the public main to the water meter must be Type K soft copper.
Correction

WU - A North arrow and scale needs to be shown on each drawing page.
Correction

WU - A note should be provided on the site plan indicating that all water main taps, 2-inch diameter & smaller, will be made by the Water Utilities Depr., Operations Division (816/969-7606) with a forty-eight (48) prior notice to schedule the tap.
Correction

PW - Provide a drainage area map in compliance with Article I Section 7. B. 1. c. 4. b. i. from City Ordinance No. 3719.
Correction

PW - Provide a written benchmark description and elevation for the proposed improvements.
Correction

PW - Indicate that street, storm sewers, sanitary sewers and waterlines shall be constructed in accordance with the City of Lee's Summit Design and Construction Manual, Ord. 3719.
Correction

PW - Indicate CG-1 concrete curb and gutter or an integral concrete sidewalk and curb with a vertical face at all edges of proposed parking areas and driveways, constructed in compliance with the City's standard detail SD-15 from City Ordinance No. 3719.
Correction

PW - Indicate the proposed driveway approach shall be constructed in compliance with the City's standard detail SD-18 from City Ordinance No. 3719.
Correction

PW - Provide curb radii.
Correction

PW - Indicate the limits of P.C.C. pavement vs asphaltic pavement.
Correction

PW - Provide storm water calculations for the proposed system. These calculations should include the impact of the additional flow into the existing public storm sewer system. The Storm Calculations must be sized assuming the entire drainage area will be fully developed. A licensed Professional Engineer registered in the State of Missouri must sign and seal the storm water calculations.
Correction

PW - Provide a plan and profile for the storm sewer improvements.
Correction

PW - Indicate the type and location of erosion control devices that will be used during construction.
Correction

PW - Indicate clearly existing vs proposed improvements.
Correction

PW - Indicate removal and replacement of orifice plate. Also provide orifice plate detail.
Correction

WU - A note should be provided on the site plan requiring the Contractor to contact Public Works Inspections at 816/969-7450 twenty-four (24) hours prior to the commencement of any construction activity.
Correction

WU - Show all existing right-of-way and easement boundaries and their widths.
Correction

WU - Contact the Records Technician, Water Utilities Department, 816/969-7621, for as-built record information relating to City-owned water, sanitary sewer, and storm water facilities.
Correction

Fire Department- If medical gases are stored in the Lincare side of the building, they shall be stored in accordance with UFC Article 74 and 80 and other nationally recognized standards.
Correction

Fire Department- The installation of the spray booth and mixing room shall be in accordance with UFC Article 45 and 79, 1991 edition. Submit booth specifications to the fire department for approval.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

P & D - Accessible signs must comply with R7-8D of Manual of Uniform Traffic Controls.
Correction

Codes Admin. - All materials exposed within return air plenums must comply with the 1991 Uniform Mechanical Code, Seciton 1002 (b).
Correction

Codes Admin. - Install an additional exit sign above door #20 and above the door located next to the paint booth.
Correction

Codes Admin. - Submit additional information on the floor interceptor located in the wash bay.
Correction

PW - Contact Public Works Inspection at 969-7450 to obtain necessary infrastructure permits and inspection fees prior to start of construction.
Correction

PW - Contact Public Works Inspection at 969-7450 24-hours prior to the anticipated commencement of construction.
Correction

PW - Provide a copy of the Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit.
Correction

PW - Please submit three (3) sets of revised civil site plans containing the information necessary to address the Water Utilities and the Public Works Engineering Departments comments.
Correction

PW - Indicate the limits of construction.
Correction

PW - Resubmit the proposed contours. The proposed contours provided does not tie-in with the existing contours.
Correction

PW - Provide easements indicated on the drawings matching the easements shown on the final plat.
Correction

Codes Admin. - This permit is issued for the interior tenant work only. No work has been approved on the exterior of the building. Please submit the proper information to the Public Works, Planning and Development and Water Utilities Departments for review and approval before starting any outside work.
Correction

Fire Department- Fire-protection equipment and fire hydrants shall be clearly identified in a manner approved by the chief to prevent obstruction by parking and other obstructions. (UFC Section 10.105b)
Correction

Fire Department- Parking lots and fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. (UFC Section 10.204.(b))
Correction

Fire Department- Approved numbers or address shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. (UFC Section 10.301.(a))
Correction

Fire Department- Provide "Knox Box Entry System". When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be a type approved by the chief and shall contain keys to gain necessary access as required by the chief. (UFC 10.302)
Correction

Fire Department- The duct detectors when activated shall be received at the panel and alarm company as a trouble alarm. (UFC Section 10.503.)
Correction

Fire Department- A set of sprinkler plans and specifications bearing a State of Missouri licensed engineers seal, shall be submitted to the Fire Department for review and approval prior to construction (system modification). (1991 Uniform Fire Code, Section 10.503)
Correction

Fire Department- Fire alarm systems; fire hydrant systems; fire-extinguishing systems, including automatic sprinklers and wet and dry standpipes; halon systems and other automatic fire-extinguishing systems shall meet the approval of the fire department as to installation and locations and shall be subject to acceptance testing and such periodic testing as required by the chief. NOTE: Acceptance testing may scheduled at least 48 hours in advance by calling 969-7343. UFC 10.503
Correction

Fire Department- Fire-protection or extinguishing system coverage, spacing and specifications shall be maintained accordance with recognized standards at all time. Such systems shall be extended, altered or augmented as necessary to maintain and continue protection whenever any building so equipped is altered, remondeled or added to. Additions, repairs, alterations and servicing shall be in accordance with recognized standards. UFC Section 10.504(a)
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- All valves controlling the water supply for automatic sprinkler systems and water-flow switches on all sprinkler systems shall be electrically supervised when the number of sprinkler heads are one-hundred or more. Valve supervision and water-flow alarm and trouble signals shall be distinctly different and shall be automatically transmitted to an approved central station, remote station or proprietary supervising station as defined by national standards. UFC 10.508
Correction

P & D - Landscaping plan must be submitted. (Sheet L1 was listed on title sheet, but not included in plans.) Landscape islands must be added in new parking area.
Correction

P & D - Trash enclosure detail must be provided.
Correction

Fire Department- All locksets, both new and existing shall be openable from the inside without the use of a key, special tool or knowledge. (UFC.12.106)
Correction

Fire Department- Exit illumination shall be provided and maintained in accordance with the Building Code. Exits shall be illuminated when the building or structure is occupied. Equipment providing emergency power for exit illumination and exit signs shall be maintained in an operable condition. (UFC Section 12.110)
Correction

Fire Department- If building alteration adversely effects exit illumination, exit illumination shall be provided and maintained in accordance with the Building Code. UFC Section 12.110.(A).
Correction

Fire Department- A completed hazardous materials permit application shall be submitted to the Lee's Summit fire department. (UFC Section 4.103 and UFC Section 80.103.(a))
Correction

P & D - All access drives and parking areas shall be constructed with straight-back (Type CG-1) concrete curbing.
Correction

Fire Department- Dumpsters and containers with an individual capacity of 1.5 cubic yards (40.5 cubic feet) or more shall not be stored in buildings or placed within 5 feet of combustible walls, openings or combustible roof lines. (UFC Section 11.302.(b))
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $392.00 $392.00 Paid 08/09/2001
24 BLDG Plan Check Fees $26.50 $26.50 Paid 08/09/2001
25 Electrical Permit Fee $70.00 $70.00 Paid 08/09/2001
25 Mechanical Permit Fees $108.00 $108.00 Paid 08/09/2001
25 Plumbing Permit Fees $87.00 $87.00 Paid 08/09/2001
89 Sewer Tap Fees $480.00 $480.00 Paid 08/09/2001
25 Plumbing Permit Fees $5.00 $5.00 Paid 10/23/2001
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Commercial Passed 11/25/2002
Correction
Resolved
11/25/2002
None Issues with Planning and Development to be run by NHS Close Permit
Occupancy Inspection - Codes Commercial Passed 12/03/2002
Correction
Resolved
12/03/2002
None Issues with Planning and Development to be run by NHS Close Permit
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home