Summary
B0100745
Building Permit - Commercial
Certificate of Occupancy
SUMMIT HOLDINGS LLC
NEW COMMERCIAL
UNITECH BUILDING
05/04/2001
06/07/2002
12/04/2002
08/06/2004
Locations
Contacts
TRIAD CONSTRUCTION COMPANY, INC, Address:PO BOX 10027  
SUMMIT HOLDINGS LLC, Address:2300 NE INDEPENDENCE AVE  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/29/2002 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

P&D - Accessible Parking
Correction

P&D - Screening of Mechanical Equipment
Correction

PW - Contact Public Works Inspection at 969-7450 to obtain necessary infrastructure permits and inspection fees prior to start of construction.
Correction

PW - Contact Public Works Inspection at 969-7450 24-hours prior to the anticipated commencement of construction.
Correction

PW - Contact Barton Reese, Erosion Control Specialist, at 969-7951 for erosion control installation approval and prior to land disturbance.
Correction

PW - Please submit three (3) sets of revised civil site plans to Public Works Engineering containing the information necessary to address the Water Utilities and the Public Works Engineering Departments comments.
Correction

PW - Provide a copy of the Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit.
Correction

PW - Resubmit the storm water calculations. They should include the inlet/outlet control conditions.
Correction

PW - Provide the correct fall across inverts as described in Article IV Section B. 11. c. of City Ordinance No. 3719. This ordinance requires a minimum fall for the invert through the structures of 0.2 feet for straight flow through the structures, or 0.5 feet fall for all other types of flow (bends more than 22.5 deflection angle, multiple lines entering, enlargement transition, etc.).
Correction

PW - Provide a concrete low flow channel for the detention area.
Correction

PW - Indicate CG-1 concrete curb and gutter or an integral concrete sidewalk and curb with a vertical face at all edges of proposed parking areas and driveways, constructed in compliance with the City's standard detail SD-15 from City Ordinance No. 3719.
Correction

PW - Resubmit the storm sewer pipe schedule. There is conflicting pipe lengths with the storm sewer plan and profile.
Correction

WU - Any public fire hydrant should be painted optic yellow and a private fire hydrant should be painted optic yellow on the the barrell with a bright silver bonnet.
Correction

WU - The location of the Fire Department Connection (FDC) must be shown on the site plan.
Correction

WU - All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816- 969-7636) within 30 days from the date installed.
Correction

WU - Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

WU - All purposed hose bibb connections must have an approved (vacuum breaker) backflow preventer.
Correction

Codes Admin. - All ramps located in an accessible route of travel must comply with the 1991 Uniform Building Code, Chapter 33 and 1986 ANSI A 117.1.
Correction

Codes Admin. - Identify how the gas piping will be supported. Provide a detail.
Correction

Codes Admin. - Doors numbered 135-B and 128-A must be on a fusilbe link. These doors must close when needed to complete the occupancy seperation required by code. Please Clarify.
Correction

Fire Department- Fire-protection equipment and fire hydrants shall be clearly identified in a manner approved by the chief to prevent obstruction by parking and other obstructions. (UFC Section 10.105b)
Correction

Fire Department- Approved numbers or address shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. (UFC Section 10.301.(a))
Correction

Fire Department- Provide "Knox Box Entry System". When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be a type approved by the chief and shall contain keys to gain necessary access as required by the chief. (UFC 10.302)
Correction

Fire Department- A fire hydrant painted yellow is required to be located within 50 feet of the fire department connection to the sprinkler system. (UFC 10.401.)
Correction

Fire Department- When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. UFC 10.502
Correction

Fire Department- The duct detectors when activated shall be received at the panel and alarm company as a trouble alarm. (UFC Section 10.503.)
Correction

Fire Department- A set of sprinkler plans and specifications bearing a State of Missouri licensed engineers seal, shall be submitted to the Fire Department for review and approval prior to construction (system modification). (1991 Uniform Fire Code, Section 10.503)
Correction

Fire Department- Fire alarm systems; fire hydrant systems; fire-extinguishing systems, including automatic sprinklers and wet and dry standpipes; halon systems and other automatic fire-extinguishing systems shall meet the approval of the fire department as to installation and locations and shall be subject to acceptance testing and such periodic testing as required by the chief. NOTE: Acceptance testing may scheduled at least 48 hours in advance by calling 969-7343. UFC 10.503
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- All valves controlling the water supply for automatic sprinkler systems and water-flow switches on all sprinkler systems shall be electrically supervised when the number of sprinkler heads are one-hundred or more. Valve supervision and water-flow alarm and trouble signals shall be distinctly different and shall be automatically transmitted to an approved central station, remote station or proprietary supervising station as defined by national standards. UFC 10.508
Correction

Fire Department- Dumpsters and containers with an individual capacity of 1.5 cubic yards (40.5 cubic feet) or more shall not be stored in buildings or placed within 5 feet of combustible walls, openings or combustible roof lines. (UFC Section 11.302.(b))
Correction

Fire Department- All locksets, both new and existing shall be openable from the inside without the use of a key, special tool or knowledge. (UFC.12.106)
Correction

Fire Department- A completed hazardous materials permit application shall be submitted to the Lee's Summit fire department. (UFC Section 4.103 and UFC Section 80.103.(a))
Correction

Fire Department- The chief is authorized to require warning signs for the purpose of pointing out the hazards of storing flammable liquids. UFC Section 79.109.(a)
Correction

Fire Department- Extension cords shall not be utilized as a substitute for permanent wiring. Extension cords shall only be utilized with portable appliances while such appliances are in use and shall only supply one portable appliance except for approved multi-plug extension cords. Extension cords shall be grounded when serving grounded appliances. Extension cords and multi-plug extension cords shall not be affixed to structures; extened through walls, ceilings, floors, under doors or floor coverings; or be subject to environmental or physical damage. (UFC Section 85.106.(a), (b) and (c))
Correction

Codes Administration- Erosion control shall be provided in conformance with Article VIII, Section VIII(c) & (d) and details 48 and 48A of the City of Lee's Summit Design and Construction Manual. Erosion control devices shall be installed and maintained during all phases of the construction process. Failure to provide or maintain erosion control may result in an issuance of a stop work order which is authorized by Article I, Section XXIV.
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

P&D - Site Plan Approval - This approval is for the first phase only including the 44,487 sq ft office warehouse building and associated parking only. The future building and associated parking/site improvements require a final site plan to be submitted and approved prior to any future building permit being issued.
Correction

P&D - Parking Waiver
Correction

P&D - FAA approval required.
Correction

P&D - Horizontal Offsets -
Correction

P&D - Colors
Correction

P&D - Screening of loading and parking area.
Correction

P&D - Adjacent Right of Way information
Correction

P&D - Parking
Correction

Fire Department- Electrical service in the H3 rooms and to the spray booths and ovens shall be in accordance wth UFC Article 45 and the Electrical Code.
Correction

Fire Department- The spray booths used for spray application of flammable finishes shall be installed and maintained in accordance with Uniform Fire Code, Article 45. Details on the ventilation for the booths and ovens shall be provided to Codes Administration and the Fire Department for review. When required interlocks shall be provided. Fire suppression shall also be extended into the booths. Please provide specification information on the booths for review.
Correction

Fire Department- Standpipes (hose connections) shall be provided at doors 100, 127A, 127C, 128E and 135E. The standpipes can be part of the automatic sprinkler system. All valves shall be 2 1/2 inch NST.
Correction

Fire Department- Complete plans and specifications for fire alarm systems shall be submitted for review and approval prior to system installation. (UFC Section 14.103.(a))
Correction

Fire Department- An interior door is recommended from the sprinkler room to the interior space. If a door is provided, the standpipe connection that was originally needed at door 128 E may be relocated to the sprinkler room.
Correction

Fire Department- The rooms designated as H3 occupancies shall be constructed per UBC. The storage of flammable and combustible liquids in these rooms shall comply with UFC Article 79.
Correction

Codes Admin. - All plumbing, mechanical and electrical penetrations through occupancy seperation walls must be properly fire stopped. Provide details for these penetrations if applicable.
Correction

PW - Provide a pipe flared-end section with a toewall at the detention outlet.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $5,573.00 $5,573.00 Paid 06/07/2002
24 BLDG Plan Check Fees $112.85 $112.85 Paid 06/07/2002
25 Electrical Permit Fee $396.45 $396.45 Paid 06/07/2002
25 Mechanical Permit Fees $199.00 $199.00 Paid 06/07/2002
25 Plumbing Permit Fees $109.00 $109.00 Paid 06/07/2002
84 Water Meters $625.00 $625.00 Paid 06/07/2002
85 Water Taps $13,670.00 $13,670.00 Paid 06/07/2002
89 Sewer Tap Fees $630.00 $630.00 Paid 06/07/2002
Right of Way Permit $35.00 $35.00 Paid 06/07/2002
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Passed 06/25/2002
Correction
Resolved
06/25/2002
NONE: RELEASE TEMP ELECT SERVICE
Piers/Caissons Inspection - Commercial Passed 07/02/2002
Correction
Resolved
07/02/2002
None INTERIOR COLUMN PIERS (F1-F10) PER PLAN
Footing Inspection - Commercial Partial 07/03/2002
Correction
Partial Correction
07/03/2002
None A LINE FROM 5 SOUTH TO 6 LINE 6 LINE NORTH TO APPROX E LINE E LINE WEST TO LINE 4 4.9 LINE NORTH 40NFT 4 LINE NORTH TO 6 LINE
Footing Inspection - Commercial Partial 07/08/2002
Correction
Partial Correction
07/08/2002
None G LINE 2 LINE SOUTH TO D.2 PER 3/S3.10
Footing Inspection - Commercial Partial 07/09/2002
Correction
Partial Correction
07/09/2002
None BAL OF 4/4.2 LINE (NE CORNER) BAL OF 1 LINE S TO A LINE
Footing Inspection - Commercial Partial 07/10/2002
Correction
Partial Correction
07/10/2002
None BAL OF 1 LINE SOUTH A/B LINE TO LOADING DOCK
Underground Plumbing Inspection - Commercial Partial 07/16/2002
Correction
Partial Correction
07/16/2002
None A LINE THROUGH E.1
Footing Inspection - Commercial Partial 07/16/2002
Correction
Partial Correction
07/16/2002
None A LINE 5 NORTH TO 3 DOCK FOOTING
Underslab Electrical Inspection - Commercial Passed 07/16/2002
Underground Plumbing Inspection - Commercial Passed 07/17/2002
Correction
Resolved
07/17/2002
None VENT INVERTS TO BE AT/ABOVE FLOW LINE
Footing Inspection - Commercial Passed 07/17/2002
Correction
Resolved
07/17/2002
None FOOTONG COMPLETE
Foundation Inspection - Commercial Passed 07/25/2002
Sewer Service Inspection Partial 08/13/2002
Correction
Partial Correction
08/13/2002
None 70` TO CUT IN WYE
Sewer Service Inspection Passed 08/14/2002
Correction
Resolved
08/14/2002
None 70` TO CUT IN WYE
Water Service Inspection Passed 08/21/2002
Footing Inspection - Commercial Passed 09/26/2002
Correction
Resolved
09/26/2002
None FOOTING COMPLETE. TRASH ENCLOSURE FTG. APPROVED.
Foundation Inspection - Commercial Passed 10/09/2002
Correction
Resolved
10/09/2002
None SOUTH STOOP AND TRASH ENCL. WALLS APPROVED.
Retaining Wall Inspection Failed 10/10/2002
Correction
Partial Correction
10/10/2002
BELOW 1- DOCK RETAINING WALL OK TO POUR.
Electrical Service Inspection Passed 11/11/2002
All Rough Inspection - Commercial Partial 11/22/2002
Correction
Partial Correction
11/22/2002
None IN WALL ALL ROOMS EXC. 107 OKAY TO INSULATE, OKAY TO ROCK
Gas Piping Inspection - Commercial Passed 11/26/2002
Gas Service Inspection - Commercial Passed 11/26/2002
All Rough Inspection - Commercial Partial 12/05/2002
Correction
Partial Correction
12/05/2002
NONE PARTIAL APPROVAL - BELOW MEZANINE - WALLS ONLY FRAMING,ELECT., AND PLUMBING APPROVED - ALSO BREAK ROOM AND ROOM 132 ABOVE CEILING IN STAIRWELL APPROVED SCREW INSPECTION ON ROOM 127,128 135 -1 HR WALL FIRE CAULK AND SAFEING EAST AND NORTH WALL 128
Gas Service Inspection - Commercial Passed 12/09/2002
Correction
Resolved
12/09/2002
None 78 PSI ON GAUGE WELDED RSER PER MGE RELEASE SERVICE
All Rough Inspection - Commercial Passed 01/03/2003
Correction
Resolved
01/03/2003
None
Correction
Resolved
01/03/2003
NONE
Occupancy Inspection - Codes Commercial Failed 02/14/2003
Correction
Corrective Action Required
02/14/2003
CODES CAP OPEN WASTE/SET FIXTURES HANDRAILS TO RETURN TO WALL EQUIPMENT PANEL UNFINISHED (AWAITING FIXTURES)
Correction
Corrective Action Required
02/14/2003
Receive Planning & Development Approval UNKNOWN CONTACT M GORECKI 969-7317
Correction
Partial Correction
02/14/2003
Receive Water Utilities Approval SENT COPIES OF BACKFLOW REPORTS AWAITING ORIGINALS
Correction
Corrective Action Required
02/14/2003
Receive Public Works Approval MAINT BOND ON 1 PUBLIC HYDRANT REQD PAINT PRIVATE HYDRANT BONNETS SILVER
Correction
Corrective Action Required
02/14/2003
Receive Fire Department approval FIRE DOOR/SPRINKLER ISSUES
Occupancy Inspection - Codes Commercial Failed 03/27/2003
Correction
Resolved
03/27/2003
CODES
Correction
Corrective Action Required
03/27/2003
Receive Fire Department approval FIRE DOOR; SPRINKLER ISSUES;..
Correction
Partial Correction
03/27/2003
Receive Water Utilities Approval SENT COPIES OF BACKFLOW REPORTS AWAITING ORIGINALS
Occupancy Inspection - Codes Commercial Passed 10/05/2004
Correction
Resolved
10/05/2004
Receive Fire Department approval NO ISSUES CURRENTLY KNOWN
Correction
Resolved
10/05/2004
Receive Public Works Approval NO ISSUES CURRENTLY KNOWN
Correction
Resolved
10/05/2004
Receive Water Utilities Approval NO ISSUES CURRENTLY KNOWN
Correction
Resolved
10/05/2004
Receive Planning & Development Approval NO ISSUES CURRENTLY KNOWN
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home