Permit Application Status

B0100270


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0100270
Building Permit - Commercial
Certificate of Occupancy
TUSTIN LLC
NEW COMMERCIAL
MOBILE OFFICE BUILDING
02/27/2001
03/09/2001
09/05/2001
08/14/2001
Locations
Contacts
CITY OF LEE'S SUMMIT, Address:207 SW MARKET ST.  
TUSTIN LLC, Address:10531 MISSION RD UNIT 305  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/26/2001 10/29/2010
Correction

Fire Department- All locksets, both new and existing shall be openable from the inside without the use of a key, special tool or knowledge. (UFC.12.106)
Correction

Fire Department- Exit doors shall be operable from the inside without the use of a key or any special knowledge. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC Section 12.106.(c))
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. UFC 10.502
Correction

PW - Provide a copy of the Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit.
Correction

PW - Contact Barton Reese, Erosion Control Specialist, at 969-7951 for erosion control installation approval and prior to land disturbance.
Correction

PW - Contact Public Works Inspection at 969-7450 24-hours prior to the anticipated commencement of construction.
Correction

PW - Indicate CG-1 concrete curb and gutter or an integral concrete sidewalk and curb with a vertical face at all edges of proposed parking areas and driveways, constructed in compliance with the City's standard detail SD-15 from City Ordinance No. 3719.
Correction

PW - Indicate that street, storm sewers, sanitary sewers and waterlines shall be constructed in accordance with the City of Lee's Summit's Design and Construction Manual, Ord. 3719.
Correction

P & D - All exterior lighting, including parking lot lighting and wall-mounted fixtures, shall be of the metal halide variety with a total cut-off of light at an angle of less than 90 degrees (measured from the vertical). Manufacturer's specifications must be submitted prior to installation.
Correction

P & D - All development shall be in accordance with the approved special use permit approved by City Council on February 1, 2001, and the attached final site plan dated January 5, 2001.
Correction

Codes Administration - Installation of each modular unit and their connections subject to inspection and verification of compliance to approved plans.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- Erosion control shall be provided in conformance with Article VIII, Section VIII(c) & (d) and details 48 and 48A of the City of Lee's Summit Design and Construction Manual. Erosion control devices shall be installed and maintained during all phases of the construction process. Failure to provide or maintain erosion control may result in an issuance of a stop work order which is authorized by Article I, Section XXIV.
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Fire Department- During construction required exit components shall be maintained. UFC Section 87.101.(c)
Correction

Fire Department- Extension cords shall not be utilized as a substitute for permanent wiring. Extension cords shall only be utilized with portable appliances while such appliances are in use and shall only supply one portable appliance except for approved multi-plug extension cords. Extension cords shall be grounded when serving grounded appliances. Extension cords and multi-plug extension cords shall not be affixed to structures; extened through walls, ceilings, floors, under doors or floor coverings; or be subject to environmental or physical damage. (UFC Section 85.106.(a), (b) and (c))
Correction

Fire Department- Exit illumination shall be provided and maintained in accordance with the Building Code. Exits shall be illuminated when the building or structure is occupied. Equipment providing emergency power for exit illumination and exit signs shall be maintained in an operable condition. (UFC Section 12.110)
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $356.00 $356.00 Paid 03/09/2001
24 BLDG Plan Check Fees $25.90 $25.90 Paid 03/09/2001
25 Electrical Permit Fee $15.00 $15.00 Paid 03/09/2001
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home