Summary
B0100221
Building Permit - Commercial
Certificate of Occupancy
METCALF BANK
NEW TENANT FINISH
TENANT FINISH OFFICE
02/15/2001
02/22/2001
08/21/2001
02/22/2001
Locations
Contacts
SUMMIT CROSSINGS DEV. LLC, Address:455 SW WARD RD  
METCALF BANK, Address:609 N M 291 HWY  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/14/2001 10/29/2010
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- Extension cords shall not be utilized as a substitute for permanent wiring. Extension cords shall only be utilized with portable appliances while such appliances are in use and shall only supply one portable appliance except for approved multi-plug extension cords. Extension cords shall be grounded when serving grounded appliances. Extension cords and multi-plug extension cords shall not be affixed to structures; extened through walls, ceilings, floors, under doors or floor coverings; or be subject to environmental or physical damage. (UFC Section 85.106.(a), (b) and (c))
Correction

Fire Department- Combustible debris shall not be accumulated within buildings. Combustible debris, rubbish and waste material shall be removed from buildings as often as practical. Combustible debris, waste material and trash shall not be burned on site. (UFC Section 87.103.(e))
Correction

Fire Department- During construction and alteration fire-resistive assemblies and construction shall be maintained in accordance with Section 10.602. and 10.602. UFC Section 87.104.(d)
Correction

Fire Department- Exit illumination shall be provided and maintained in accordance with the Building Code. Exits shall be illuminated when the building or structure is occupied. Equipment providing emergency power for exit illumination and exit signs shall be maintained in an operable condition. (UFC Section 12.110)
Correction

Fire Department- Exit doors shall be operable from the inside without the use of a key or any special knowledge. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC Section 12.106.(c))
Correction

Fire Department- All locksets, both new and existing shall be openable from the inside without the use of a key, special tool or knowledge. (UFC.12.106)
Correction

Codes Administration/Water Utilities - Backflow assembly tests shall be submitted for the shell prior to occupancy.
Correction

Codes Administration- Except within individual dwelling units, guest rooms and sleeping rooms, exits shall be illuminated at any time the building is occupied with light having intensity of not less than 1 foot-candle at floor level. The power supply for exit illumination shall normally be provided by the premises' wiring system. In the event of its failure, illumination shall be automatically provided from an emergency system for group I, Division1.1 and 1.2 occupancies and for all other occupancies where the exiting system serves an occupant load of 100 or more. Emergency systems shall be supplied from storage batteries or an on-site generator system and the system shall be installed in accordance with the requirements of the Electrical Code. (1991Uniform Building Code, Section 3313.(a) & (b).)
Correction

Codes Administration- Exit doors shall be openable from the inside without the use of a key or special knowledge. (UBC Section 3304.(c))
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Fire Department- During construction required exit components shall be maintained. UFC Section 87.101.(c)
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $8.00 $8.00 Paid 02/22/2001
24 BLDG Plan Check Fees $2.50 $2.50 Paid 02/22/2001
25 Electrical Permit Fee $37.63 $37.63 Paid 02/22/2001
24 BLDG Permit Fees ($8.00) ($8.00) $0.00 N/A
24 BLDG Plan Check Fees ($2.50) ($2.50) $0.00 N/A
25 Electrical Permit Fee ($37.63) ($37.63) $0.00 N/A
24 BLDG Permit Fees $8.28 $8.28 Paid 02/23/2001
24 BLDG Plan Check Fees $2.50 $2.50 Paid 02/23/2001
25 Electrical Permit Fee $37.63 $37.63 Paid 02/23/2001
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home