Permit Application Status

B0100006


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0100006
Building Permit - Commercial
Final Completion
TELECOM TOWERS LLC
NEW OTHER
SWB TOWER CO-LOCATE
01/02/2001
02/14/2001
08/13/2001
04/05/2001
Locations
Contacts
SELECTIVE SITE CONSULTANTS, Address:13540 W 95TH  
TELECOM TOWERS LLC, Address:PO BOX 723597  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/01/2001 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

PLANNING & DEVELOPMENT - Each applicant for an antenna or communication tower shall provide to the Planning and Development Department: 1. an inventory of its existing antenna mounts that are either within the city limits or within one mile of the city limits, including specific information about the location, height, and design of each antenna mount, and 2. a similar inventory of existing antenna mounts owned or leased by others that were considered for co-location.
Correction

PLANNING and DEVELOPMENT - The antenna and supporting electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color of the antenna mount so as to make the antenna and related equipment as visually unobtrusive as possible.
Correction

PLANNING & DEVELOPMENT - All exterior lighting shall be of the metal halide variety and shall be with a less than 90 degree cut-off (from the vertical) to direct light downward.
Correction

PLANNING & DEVELOPMENT - All wireless telecommunication facilities must meet or exceed current standards and regulations of the FAA, the FCC, and any other agency of the federal government with the authority to regulate towers and antennas.
Correction

PLANNING & DEVELOPMENT - The access drive to and from the shelter shall be of improved with a permanent dust-free surface as required by the ordinance.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $107.00 $107.00 Paid 02/14/2001
24 BLDG Plan Check Fees $10.75 $10.75 Paid 02/14/2001
25 Electrical Permit Fee $15.00 $15.00 Paid 02/14/2001
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home