Summary
B0002014
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW COMMERCIAL
NEW WATER PUMP STATION
11/10/2000
07/20/2001
01/16/2002
06/03/2002
Locations
Contacts
CITY OF LEE'S SUMMIT, Address:207 SW MARKET ST.  
CITY OF LEES SUMMIT, Address:3 SE THIRD ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/09/2001 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Erosion control shall be provided in conformance with Article VIII, Section VIII(c) & (d) and details 48 and 48A of the City of Lee's Summit Design and Construction Manual. Erosion control devices shall be installed and maintained during all phases of the construction process. Failure to provide or maintain erosion control may result in an issuance of a stop work order which is authorized by Article I, Section XXIV.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration - Each layer of fire-resistive assemblies shall be inspected and approved prior to the application of additional layers or finishes. All firestopping of penetrations and required dampers shall be inspected and approved prior to concealing.
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- The engineer or architect in responsible charge of the structural design work shall include in the construction documents the special inspections required by UBC section 306 and other structural inspections required by the engineer or architect. (UBC Section 302.(c))
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

WU - Fire hydrant details should refer to the City of Lee's Summits Design and Construction Manual.
Correction

WU - The sanitary sewer service line is not shown on the civil drawings. If the sanitary sewer service line is going to connect to the sanitary sewer to the north of this project the connection must have a wye "cut in". Please revise civil drawings showing sanitary sewer service line, type of piping and point of connection along with a detail of the connection.
Correction

WU - Please show the proposed sanitary sewer main extension for the Woodland Glen Project that will be located west of the terminal.
Correction

Codes Administration -Provide details on type of repairs being performed in repair areas 109 and 113. Unless otherwise noted, these areas will be assumed to be H-4 Occupancies. A hazardous materials permit may be obtained from the City of Lee's Summit Fire Department at 969-7424.
Correction

Codes Administration - The mixed occupancy ratio to include H-4 Occupancy exceeds 1. Please clarify or revise.
Correction

Codes Administration - The occupant load factor for areas 101 through 108 shall be 100. The ocupant load factor for areas 109 through 113 shall be 300. Please revise. Clarify the number of employees for either section.
Correction

Codes Administration - Every portion of a group H-4 Occupancy having a floor are of greater than 1,000 square feet shall be served by at least two seperate exits.
Correction

Codes Administration - Door 101A, if used as an exit, must swing in the direction of the exit.
Correction

Codes Administration - All openings in a one-hour fire-resistive occupancy separation shall be protected by a fire assembly having a one-hour fire-protection rating. Provide listing for doors 108A, 110A, 112, and 113A.
Correction

Codes Administration- Provide plans and computations for the roof trusses. The plans, computations and specifications are required to be prepared by an architect or engineer licensed by the state to practice as such even if not required by state law. (UBC Section 302.(b))
Correction

Codes Administration- Provide plans and computations for the pre-engineered metal building package. The plans and computations are required to be prepared by an architect or engineer licensed by the state to practice as such even if not required by state law. (UBC Section 302.(b))
Correction

Codes Administration - Wall section A4 at A-301 should specify requirements for one-hour fire-resistive construction. Provide UL or equivalent listing information.
Correction

Fire Department- Clarify the use of Room 109. For a B1 occupancy no welding is allowed and any maintenance in the room is limited to the exchange of parts only. If the room is used for storage additional fire protection may be required if storage racks or shelves exceed 12 feet in height . Additional fire protection requirements may apply under UFC Article 81.
Correction

Fire Department- Tanks shall be installed in accordance with article 79, Division V, and shall be installed in special enclosures constructed in accordance with Section 79.902(c) or in listed and approved tank enclosures or materials providing fire protection of not less than 2 hours. The following additional criteria shall apply: (a) Gaurd posts or other means shall be provided to protect the area where tanks are installed. The design shall be in accordance with Sec. 80.301(w). (b) Each tank and each special enclosure shall be surrounded by a clear space of not less than 3 feet to allow for maintenance and inspection. UFC Appendix II-F
Correction

Codes Administration- The special inspector shall observe the work assigned for conformance, shall furnish inspection reports to the Codes Administration Department and the engineer or architect of record and shall submit a final signed report stating whether the work requiring special inspection was in conformance with the approved plans and applicable sections of this code. The final report shall be submitted prior to receiving a Certificate of Occupancy. (UBC Section 306.(c)) Submit reports for soils, piers, reinforced concrete, structural masonry, structural steel, and other required inspections to Codes Administration at 207 SW Market St.
Correction

Codes Administration - Provide details regarding type and capacity of generator day tanks. If in excess of exempt amounts, room 111 and 114 will be considered H Occupancies.
Correction

PLANNING & DEVELOPMENT - Approval of the final site plan does not constitute approval of the "future tanks" indicated on the site plan. A site plan must be submitted and approved for said tanks.
Correction

PLANNING & DEVELOPMENT - Staff recommends no trees be planted within 30' of the 120' x 80' tank and both "future" water tanks. This will ensure survival of trees and avoid unnecessary removal of mature trees for "future tanks" in the future. The landscaping plan must be revised and approved.
Correction

PLANNING & DEVELOPMENT - The ordinance requires a minimum of 50% of each exterior wall, excluding windows and doors, shall consist of approved materials. See Ord. 715, Sec. 260.B. for approved materials. With the exception of the front elevation, all elevations must be revised to meet this requirement of the ordinance.
Correction

PLANNING & DEVELOPMENT - If roof or ground mounted mechanical equipment is proposed, it must be screened so that it is not visible from any public right-of-way or residentially-zoned area, as required by the ordinance. The roof top units shown on the plan must be screened. The ordinance requires the appearance of the roof top screens be coordinated with the building to maintain a unified appearance. This requirement must be met.
Correction

PLANNING & DEVELOPMENT - All off-street parking areas and all access drives shall be improved with a permanent dust-free surface.
Correction

PLANNING & DEVELOPMENT - The minor plat, South Terminal, Lot 1 was approved and recorded at the Jackson County. Recorded copies submitted to the city.
Correction

PLANNING and DEVELOPMENT - The proposed driveway shall be constructed in accordance with the approved plan.
Correction

PLANNING & DEVELOPMENT - Parking shall be provided for employee(s).
Correction

Codes Administration - Provide details regarding fuel piping from exterior fuel tanks to day tanks. All piping to conform to the requirements of the Plumbing and Fire Code and subject to acceptance testing by Codes Administration and Fire Department.
Correction

Codes Administration - When the number of employees exceeds four, seperate facilities shall be provided for each sex per UBC sec. 705(c). Clarify the number of actual employees, and how this section will be addressed.
Correction

Codes Administration - Provide revised door schedule to include threshold heights and hardware types.
Correction

Codes Administration - Any water system provided with a pressure regulating device or check valve at its source or any water system containing storage water heating equipment shall be provided with an approved, listed, adequately sized pressure relief valve. In addition to the required pressure relief valve, an approved, listed expansion tank or other device shall be installed whenever any device is installed that prevents pressure relief through the building supply. (UPC 1007(c)).
Correction

Codes Administration - Potable water outlets with hose attachments other than water heater drains and clothes washer connections shall be protected by a listed non-removable hose bibb type backflow preventer or by a listed atmospheric vacuum breaker installed at least 6 inches above the highest point of usage and located on the discharge side of the last valve.
Correction

Codes Administration - Per UBC Sec. 103, the control vault is not specifically required to be permitted or inspected. This is not intended to give approval for any construction practices that are unsafe or unsound. It is the responsibility of the General Contractor to ensure that the control vault is built in a manner that safeguards life, limb, property and public welfare.
Correction

Fire Department- The minimum fire flow and flow duration for buildings other than one-and-two family dwellings shall be as specified in Table No. A-III-A-I. (UFC Div.III, App.III-A 5b)
Correction

Fire Department- Fire-protection equipment and fire hydrants shall be clearly identified in a manner approved by the chief to prevent obstruction by parking and other obstructions. (UFC Section 10.105b)
Correction

Fire Department- Fire apparatus access roads shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. (UFC Section 10.204.(a))
Correction

Fire Department- Parking lots and fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. (UFC Section 10.204.(b))
Correction

Fire Department- Approved numbers or address shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. (UFC Section 10.301.(a))
Correction

Fire Department- Provide "Knox Box Entry System". When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be a type approved by the chief and shall contain keys to gain necessary access as required by the chief. (UFC 10.302)
Correction

Fire Department- When any portion of the facility or building protected is in excess of 300 feet from a water supply on a public street, as measured by an approved route around the exterior of the building, on-site fire hydrants and mains capable of supplying the adequate fire flow shall be provided. (UFC 10.401. as amended by LSMO Ord. 3772.)
Correction

Fire Department- When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. UFC 10.502
Correction

Fire Department- Fire alarm systems; fire hydrant systems; fire-extinguishing systems, including automatic sprinklers and wet and dry standpipes; halon systems and other automatic fire-extinguishing systems shall meet the approval of the fire department as to installation and locations and shall be subject to acceptance testing and such periodic testing as required by the chief. NOTE: Acceptance testing may scheduled at least 48 hours in advance by calling 969-7343. UFC 10.503
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- All locksets, both new and existing shall be openable from the inside without the use of a key, special tool or knowledge. (UFC.12.106)
Correction

Fire Department- A completed hazardous materials permit application shall be submitted to the Lee's Summit fire department. (UFC Section 4.103 and UFC Section 80.103.(a))
Correction

Fire Department- Above ground storage tanks over 100 - gallon water capacity permanently installed, mounted or affixed and used for the storage of Class I, II or III-A liquids shall bear a label or placard identifying the material therin in accordance with UFC Standard No. 79-3. UFC Section 79.110
Correction

Fire Department- Electrical wiring and equipment shall be installed in a manner which provides reasonable safety to persons and property. Evidence that wiring and equipment are of the type approved for use in the hazardous locations set forth in Table No. 79.905-A and that wiring and equipment have been installed in accordance with the Electrical Code shall be provided. (Lee's Summit Building Inspection approval) UFC Section79.905.(b)
Correction

Fire Department- The area surrounding an exterior storage tank shall be kept clear of combustible material and vegetation for a minimum of 30 feet. UFC Section 80.301.(x)
Fees
Paid Fees Amount Paid Owing Date Paid
25 Plumbing Permit Fees $96.00 $96.00 Paid 07/20/2001
84 Water Meters $200.00 $200.00 Paid 07/20/2001
85 Water Taps $5,468.00 $5,468.00 Paid 07/20/2001
89 Sewer Tap Fees $150.00 $150.00 Paid 07/20/2001
Right of Way Permit $35.00 $35.00 Paid 07/20/2001
25 Plumbing Permit Fees ($96.00) ($96.00) $0.00 N/A
84 Water Meters ($200.00) ($200.00) $0.00 N/A
85 Water Taps ($5,468.00) ($5,468.00) $0.00 N/A
89 Sewer Tap Fees ($150.00) ($150.00) $0.00 N/A
Right of Way Permit ($35.00) ($35.00) $0.00 N/A
25 Plumbing Permit Fees $96.00 $96.00 Paid 07/20/2001
84 Water Meters $200.00 $200.00 Paid 07/20/2001
85 Water Taps $5,468.00 $5,468.00 Paid 07/20/2001
89 Sewer Tap Fees $150.00 $150.00 Paid 07/20/2001
Right of Way Permit $35.00 $35.00 Paid 07/20/2001
24 BLDG Plan Check Fees $661.25 $661.25 Paid 08/01/2001
25 Electrical Permit Fee $130.00 $130.00 Paid 08/01/2001
25 Mechanical Permit Fees $162.00 $162.00 Paid 08/01/2001
24 BLDG Permit Fees ($38,477.00) ($38,477.00) $0.00 N/A
24 BLDG Plan Check Fees ($661.25) ($661.25) $0.00 N/A
25 Electrical Permit Fee ($130.00) ($130.00) $0.00 N/A
25 Mechanical Permit Fees ($162.00) ($162.00) $0.00 N/A
24 BLDG Permit Fees $13,502.00 $13,502.00 Paid 08/06/2001
24 BLDG Plan Check Fees $245.00 $245.00 Paid 08/06/2001
25 Electrical Permit Fee $130.00 $130.00 Paid 08/06/2001
25 Mechanical Permit Fees $162.00 $162.00 Paid 08/06/2001
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Commercial Failed 03/11/2002
Correction
Corrective Action Required
03/11/2002
Receive Public Works Approval 1. INSTALL EROSIN CONTROL MEASURES. VEGATATE OPEN AREAS Yard
Correction
Corrective Action Required
03/11/2002
Receive Fire Department approval 1. COMPLY WITH FIRE DEPT SEPERATE COVER
Correction
Corrective Action Required
03/11/2002
Receive Planning & Development Approval 1. COMPLETE PARKING LOT STRIPING AND ADA SIGNAGE 2. COMPLETE APPROVED LANDSCAPING Yard
Correction
Corrective Action Required
03/11/2002
Receive Water Utilities Approval 1. SUBMIT DCD REPORT TO W/U JEFF WALTERS 969-7636
Correction
Corrective Action Required
03/11/2002
SEE TEXT 1. SEAL OPEN ELECTRICAL EUH-1,EUH-13,EUH-15,ABOVE KCMO GENSET,NW CORNER GFCI. 2. SEAL RATED WALL AT CONDUIT PENETRATIONS BEHIND GUTTER BOTH MECH ROOMS 3. PROVIDE LABELS FOR RATED DOOR ASSEMBLIES 4. PROVIDE 3R COVERS ON FIXTURES IN VAULT
Correction
Corrective Action Required
03/11/2002
5. PROVIDE EXPANSION TANK ON WATER HEATER 6. PROVIDE ADDRESS 7. SUBMIT FINAL SPECIAL INSPECTIONS LETTER/REPORT 8. COMPLETE FINAL GRADING TO MAINTAIN DRAINAGE AWAY FROM STRUCTURE TEMPORARY OCCUPANCY APPROVED
Occupancy Inspection - Codes Commercial Failed 05/29/2002
Correction
Resolved
05/29/2002
Receive Public Works Approval Yard
Correction
Resolved
05/29/2002
Receive Fire Department approval
Correction
Corrective Action Required
05/29/2002
Receive Planning & Development Approval 1. COMPLETE PARKING LOT STRIPING AND ADA SIGNAGE 2. COMPLETE APPROVED LANDSCAPING Yard
Correction
Resolved
05/29/2002
Receive Water Utilities Approval
Correction
Corrective Action Required
05/29/2002
SEE TEXT 1. COMPLETE FIXTURE COVERS 2. PROVIDE LABELS FOR RATED DOOR ASSEMBLIES
Correction
Corrective Action Required
05/29/2002
3. SUBMIT FINAL SPECIAL INSPECTIONS LETTER/REPORT TEMPORARY OCCUPANCY APPROVED
Occupancy Inspection - Codes Commercial Passed 05/31/2002
Correction
Resolved
05/31/2002
Receive Planning & Development Approval Yard
Correction
Resolved
05/31/2002
SEE TEXT
Correction
Resolved
05/31/2002
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home