Permit Application Status

B0001534


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0001534
Building Permit - Commercial
Final Completion
TELECOM TOWERS LLC
NEW OTHER
NEW TOWER
08/24/2000
09/22/2000
03/21/2001
07/10/2001
Locations
Contacts
AMERICAN TOWER CORP, Address:13632 W 95TH ST  
TELECOM TOWERS LLC, Address:PO BOX 723597  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 02/20/2001 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- The engineer or architect in responsible charge of the structural design work shall include in the construction documents the special inspections required by UBC section 306 and other structural inspections required by the engineer or architect. (UBC Section 302.(c))
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration- Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Building Official. The Building Official, upon notification, shall make the requested inspections and shall either indicate that portion of the construction is satisfactory as completed, or shall notify the permit holder or an agent of the permit holder wherein the same fails to comply with this code. Any portions which do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the Building Official. (1991 Uniform Building Code, Section 305.(d).)
Correction

Codes Administration- A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. ( UBC Section 305.(g))
Correction

Codes Administration- A reinspection fee may be assessed if an approved set of plans are not readily available to the inspector and the permit card is not posted at the time of the inspection. (UBC Section 305.(g))
Correction

Codes Administration- The special inspector shall observe the work assigned for conformance, shall furnish inspection reports to the Codes Administration Department and the engineer or architect of record and shall submit a final signed report stating whether the work requiring special inspection was in conformance with the approved plans and applicable sections of this code. The final report shall be submitted prior to receiving a Certificate of Occupancy. (UBC Section 306.(c))
Correction

PW - Contact Public Works Inspection at 969-7450 prior to construction.
Correction

PW - Contact Barton Reese, Erosion Control Specialist, at 969-7951 for erosion control installation approval and prior to land disturbance.
Correction

PW - Please submit three (3) sets of revised civil site plans to Public Works Engineering containing the information necessary to address the Water Utilities and the Public Works Engineering Departments comments.
Correction

Fire Department- A completed hazardous materials permit application shall be submitted to the Lee's Summit fire department. A Haz-Mat permit is required per city ordinance for any utilization, sale or distribution of liquefied petroleum gas (propane). (UFC Section 4.103 and UFC Section 80.103.(a))
Correction

Fire Department- Provide "Knox Box Entry System". When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be a type approved by the chief and shall contain keys to gain necessary access as required by the chief. Knox access will be required for the entry gate to the facility. (UFC 10.302)
Correction

Fire Department- The location and installation of the propane tank shall be in compliance with Article 82 of the 91 edition of the Uniform Fire Code.
Correction

PLANNING & DEVELOPMENT - All development shall be in accordance with the approved site plan.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $366.00 $366.00 Paid 09/22/2000
24 BLDG Plan Check Fees $26.00 $26.00 Paid 09/22/2000
25 Electrical Permit Fee $50.00 $50.00 Paid 09/22/2000
25 Mechanical Permit Fees $15.00 $15.00 Paid 09/22/2000
99 Erosion Control $200.00 $200.00 Paid 09/22/2000
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home