Permit Application Status

B0001325


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0001325
Building Permit - Commercial
Final Completion
REORGANIZED SCHOOL DIST NO 7
NEW OTHER
PLAY GROUND NO INSPECTIONS
07/19/2000
08/14/2000
02/10/2001
06/08/2002
Locations
Contacts
REDFORD CONSTRUCTION INC, Address:P.O. BOX 1065  
REORGANIZED SCHOOL DIST NO 7, Address:301 NE TUDOR RD, Phone:(816) 986-1000  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/15/2001 10/29/2010
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Water Utilities - The backflow preventer located above the janitor sink must be a min. of 12" from floor or top of mop sink rim and a max. of 36" from floor.
Correction

Water Utilities - Backflow preventer must be tested within 30 days from the date installed. Also test report needs to be forward to Water Utilities before CO.
Correction

All electrical installations must comply with the 1990 National Electric Code, Article 680.
Correction

All plumbing installations must comply with the 1991 Uniform Plumbing Code.
Correction

PLANNING & DEVELOPMENT - A cross-ssection of the "fountain" must be submitted for review.
Correction

PLANNING & DEVELOPMENT - A landscaping worksheet must be submitted with the landscape plan.
Correction

PW - Please submit three (3) sets of revised civil site plans to Public Works Engineering containing the information necessary to address the Water Utilities and the Public Works Engineering Departments comments.
Correction

PW - Provide erosion control, a copy of the land disturbance permit and the required attachments to the Erosion Control Specialist prior to any land disturbance activities.
Correction

PW - Contact Barton Reese, Erosion Control Specialist, at 969-7951 for erosion control installation approval and prior to land disturbance.
Correction

PW - Contact Public Works Inspection at 969-7450 prior to construction.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $47.00 $47.00 Paid 08/14/2000
24 BLDG Plan Check Fees $5.75 $5.75 Paid 08/14/2000
25 Electrical Permit Fee $15.00 $15.00 Paid 08/14/2000
25 Plumbing Permit Fees $32.00 $32.00 Paid 08/14/2000
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home