Permit Application Status

B0001284


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0001284
Building Permit - Commercial
Final Completion
NEW OTHER
RELOCATABLE #3 NO INSPECTION
07/12/2000
07/13/2000
01/09/2001
06/19/2002
Locations
Contacts
LEE'S SUMMIT R-7 SCHOOL DIST., Address:702 SE ST. RT. 291 HWY  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/08/2001 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration- A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. ( UBC Section 305.(g))
Correction

Codes Administration- A reinspection fee may be assessed if an approved set of plans are not readily available to the inspector and the permit card is not posted at the time of the inspection. (UBC Section 305.(g))
Correction

Codes Administration- Toilet rooms shall be provided with a fully openable exterior window at least 3 square feet in area; or a vertical duct not less than 100 square inches in area for the first toilet facility, with 50 additional square inches for each additional facility; or a mechanically operated exhaust system shall be connected directly to the outside, and the point of discharge shall be at least 3 feet from openings into the building. (1991 Uniform Building Code, Section 705(b).
Correction

Codes Administration- Buildings or portions of buildings shall be accessible to persons with disabilities. (UBC Chapter 31) Accessible ramps shall be installed with a maximum slope of 1:12. Ramps, landings & handrails shall be in compliance with ANSI 117.1.
Correction

Codes Administration- Tie down inspections shall be completed prior to installation of skirting on each unit.
Correction

PLANNING & DEVELOPMENT - A waiver shall be granted to relieve the requirements of Additional Control Standards (Ord. 715.Section 260.B.).
Correction

PLANNING & DEVELOPMENT - All development shall be in accordance with the approved site plan.
Correction

Codes Administration- All signage that provides emergency information or general circulation directions or identifies rooms and spaces shall comply with 4.28.2, 4.28.3, and 4.28.5. Tactile signage shall also comply with 4.28.4. ANSI A117.7-1986 Section 4.28.1 Restrooms shall be identified with unisex signage in accordance with this condition.
Correction

Fire Department- Fire alarm systems; fire hydrant systems; fire-extinguishing systems, including automatic sprinklers and wet and dry standpipes; halon systems and other automatic fire-extinguishing systems shall meet the approval of the fire department as to installation and locations and shall be subject to acceptance testing and such periodic testing as required by the chief. NOTE: Acceptance testing may scheduled at least 48 hours in advance by calling 969-7343. UFC 10.503
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- Exit doors shall be operable from the inside without the use of a key or any special knowledge. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC Section 12.106.(c))
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $113.00 $113.00 Paid 07/13/2000
24 BLDG Plan Check Fees $11.25 $11.25 Paid 07/13/2000
25 Mechanical Permit Fees $24.00 $24.00 Paid 07/13/2000
25 Plumbing Permit Fees $15.00 $15.00 Paid 07/13/2000
89 Sewer Tap Fees $180.00 $180.00 Paid 07/13/2000
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Inspection - Commercial Passed 06/18/2002
Correction
Resolved
06/18/2002
None TIE DOWNS PER STD DETAIL HCR COMPLIANT AND ANCHOR TO PADS PORTABLE UTILIZED AS TWO SEPERATE ROOMS MDP AND S ENT. COMPLIANT CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home