Permit Application Status

B0001213


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0001213
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW COMMERCIAL
NEW AIRPORT HANGER #4 MISSING INSPECTIONS
06/30/2000
08/07/2000
02/03/2001
07/16/2002
Locations
Contacts
C.W. LUEBBERT CONST. CO., Address:8422 S 7 HWY  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 12/27/2000 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Erosion control shall be provided in conformance with Article VIII, Section VIII(c) & (d) and details 48 and 48A of the City of Lee's Summit Design and Construction Manual. Erosion control devices shall be installed and maintained during all phases of the construction process. Failure to provide or maintain erosion control may result in an issuance of a stop work order which is authorized by Article I, Section XXIV.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration - It shall be unlawful for any person to engage in any business or manufacturing within the City without first having obtained a license therefor, paying the license fee, and registering the business or manufacturer with the Director of Finance or the Director's representative. (Lee's Summit Code of Ordinances, Section 28-24.) It is the general contractors responsiblity to make sure that all the trades on their project are licensed with the City of Lee's Summit.
Correction

Codes Administration- The structural elements of Type II-one hour or II-N buildings shall be of non-combustible materials. (UBC Section1901)
Correction

Codes Administration- Walls and permanent partitions of Type II-N buildings shall be of non-combustible materials. (UBC Section 1901)
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration- A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. ( UBC Section 305.(g))
Correction

Codes Administration- A reinspection fee may be assessed if an approved set of plans are not readily available to the inspector and the permit card is not posted at the time of the inspection. (UBC Section 305.(g))
Correction

Codes Administration- All structures shall be designed to the requirements of 1991 Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, Uniform Fire Code and the 1990 National Electrical Code. Plans indicate otherwise.
Correction

Codes Administration- The structure is being classified as a B-3 Occupancy which entails aircraft hangars where no repair work is done except change of parts and maintenance requiring no open flame, welding or the use of Class I or II liquids.
Correction

Codes Administration- The assumed construction type is considered II-N construction. Please clarify if different.
Correction

Codes Administration- No plumbing or mechanical systems are included in this permit as the plans do not indicate either systems. Clarify if different.
Correction

PW - As per the 7/11/200 conversation, Archers Engineering to provide a revised site plan and calculations addressing the 5/11/2000 Public Works comment letter.
Correction

Fire Department- Buildings may be utilized for airplane storage only. Maintenance done inside hangars if limited to exchange of parts only. Any maintenance requiring open flame, welding or utilization of Class I, II or III-A flammable liquids is prohibited. Additionally, any planned office or assembly space inside will require the submittal of additional tennant finish plans and may require additional fire protection. UFC 9.117
Correction

Planning - No curbs are required around the parking lot, per waiver granted by Council.
Correction

Planning - No landscaping is required around this building. Landscaping must be installed at the perimeter of the airport property, per the approved landscape plan.
Correction

PLANNING & DEVELOPMENT - All development shall be in accordance with the approved site plan and all conditions in staff's letter, dated May 10, 2000.
Correction

PLANNING & DEVELOPMENT - All exterior lighting, whether on poles or buildings, shall be of such types and so arranged that no light source is visible from adjacent properties and public right-of-way. Exterior light fixtures shall be metal halide and have a total cut-off of light at an angle of less than 90 degrees from the vertical. Any wall-mounted lights shall incorporate shields to direct light downward.
Correction

A 4" sewer stub and a 1" water stub will be installed in this building. Neither of these stubs will be connected. Additional plans and permits will be required for the connection of stubs and additional construction inside the hanger.
Correction

Fire Department- When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. UFC 10.502
Correction

Fire Department- Portable fire extiguishers shall be installed in occupancies and locations as set forth in the Uniform Fire Code Standards and as required by the Chief. Extinguishers shall be mounted in a conspicuous place with travel distance between any point in the building and extinguisher not to exceed 75 feet. Extinguishers shall be a minimum of 2A-10BC (5 lb.). (UFC Section 10.505.(a))
Correction

Fire Department- Exit doors shall be operable from the inside without the use of a key or any special knowledge. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC Section 12.106.(c))
Correction

Fire Department- Extension cords shall not be utilized as a substitute for permanent wiring. Extension cords shall only be utilized with portable appliances while such appliances are in use and shall only supply one portable appliance except for approved multi-plug extension cords. Extension cords shall be grounded when serving grounded appliances. Extension cords and multi-plug extension cords shall not be affixed to structures; extened through walls, ceilings, floors, under doors or floor coverings; or be subject to environmental or physical damage. (UFC Section 85.106.(a), (b) and (c))
Correction

Fire Department- Combustible debris shall not be accumulated within buildings. Combustible debris, rubbish and waste material shall be removed from buildings as often as practical. Combustible debris, waste material and trash shall not be burned on site. (UFC Section 87.103.(e))
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $308.00 $308.00 Paid 08/07/2000
24 BLDG Plan Check Fees $25.10 $25.10 Paid 08/07/2000
25 Electrical Permit Fee $30.00 $30.00 Paid 08/07/2000
99 Erosion Control $200.00 $200.00 Paid 08/07/2000
25 Plumbing Permit Fees $17.00 $17.00 Paid 11/21/2000
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Inspection - Commercial Passed 07/15/2002
Correction
Resolved
07/15/2002
None all required inspections completed special inspection reports on file close permit
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents