Permit Application Status

B0000360


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0000360
Building Permit - Commercial
Final Completion
REORGANIZED SCHOOL DIST NO 7
ADD/ALTER OTHER
FOUNDATION AND UNDERSLAB
03/01/2000
03/03/2000
08/30/2000
12/11/2001
Locations
Contacts
LICO CONSTRUCTION, Address:9301 EAST 47TH ST  
REORGANIZED SCHOOL DIST NO 7, Address:600 SE MILLER  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/28/2000 10/29/2010
Correction

Codes Administration- The holder of a partial permit shall proceed without assurance that the permit for the entire building or structure will be granted. (UBC Section 303.(a))
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration- Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Building Official. The Building Official, upon notification, shall make the requested inspections and shall either indicate that portion of the construction is satisfactory as completed, or shall notify the permit holder or an agent of the permit holder wherein the same fails to comply with this code. Any portions which do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the Building Official. (1991 Uniform Building Code, Section 305.(d).)
Correction

Codes Administration- A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. ( UBC Section 305.(g))
Correction

Codes Administration- A reinspection fee may be assessed if an approved set of plans are not readily available to the inspector and the permit card is not posted at the time of the inspection. (UBC Section 305.(g))
Correction

Fire Department- Fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the buildings is located more than 150 feet from the fire apparatus access as measured by an approved route around the exterior of the building or facility. (UFC Section 10.203.)
Correction

Fire Department- Fire apparatus access roads shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. (UFC Section 10.204.(a))
Correction

Fire Department- Combustible debris shall not be accumulated within buildings. Combustible debris, rubbish and waste material shall be removed from buildings as often as practical. Combustible debris, waste material and trash shall not be burned on site. (UFC Section 87.103.(e))
Correction

Fire Department- During construction required exit components shall be maintained. UFC Section 87.101.(c)
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $677.00 $677.00 Paid 03/03/2000
24 BLDG Plan Check Fees $61.25 $61.25 Paid 03/03/2000
25 Plumbing Permit Fees $20.00 $20.00 Paid 03/03/2000
99 Erosion Control $200.00 $200.00 Paid 03/03/2000
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home